Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L | L1 | Accepted-AOC Fin.Doc. Scrutiny Note forwd By Rel. Dept to Tender Comtee.to Qly.Bidder (Rate) L1,then approved Note by Hon Comisioner DMC On Dt. attached fin.approved docs. W.O.DMC/WSD/13/Dt.12082026 |
| 2 | L2₹10.2 L+₹20,089.66 (2.01%)Rejected-AOC | ₹10.2 L+₹20,089.66 (2.01%) | L2 | Rejected-AOC Fin.Doc. Scrutiny Note forwd By Rel. Dept to Tender Comtee.to Qly.Bidder (Rate) L1,then approved Note by Hon Comisioner DMC On Dt. attached fin.approved docs. W.O.DMC/WSD/13/Dt.12082026 |
| 3 | L3₹10.4 L+₹40,079.36 (4.01%)Rejected-AOC | ₹10.4 L+₹40,079.36 (4.01%) | L3 | Rejected-AOC Fin.Doc. Scrutiny Note forwd By Rel. Dept to Tender Comtee.to Qly.Bidder (Rate) L1,then approved Note by Hon Comisioner DMC On Dt. attached fin.approved docs. W.O.DMC/WSD/13/Dt.12082026 |
Tender Value
₹10.0 L
EMD Value
₹9,995
Closing Date
2 Jun 2026, 11:00 amClosed
THE COMMISSIONER
Dhule Municipal corporation, Dhule New Administrative Building Sakri road, in front of Chhatrapati Shivaji High School, Dhule 424001
Comprehesive repairs and maintainance of water supply pipeline network as and when required main roads at dhule corporation jurisdiction.
2026_DMCD_1305488_1
DHULE/DMC/WSD/DMC Fund/37/1-1/2026-27
Open Tender
Civil Works
Percentage
30 days
Dhule Municipal corporation
Please refer Tender documents.
9 documents required · 9 mandatory
₹590
₹9,995
2 Sept 2026
26 May 2026
3 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. | 55 | Cum | 173 | ₹9,515 |
| 2 | Dismantling dead pipeline of M.S./ R.C.C./ C.I./ P.S.C. and G.I./ A.C./ P.V.C./ S.W./ H.D.P.E. pipe including cost of necessary excavation and refilling of trenches, breaking the joints, lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc. complete. | 5 | Rmt | 250.59 | ₹1,252.95 |
| 3 | Dismantling dead pipeline of M.S./ R.C.C./ C.I./ P.S.C. and G.I./ A.C./ P.V.C./ S.W./ H.D.P.E. pipe including cost of necessary excavation and refilling of trenches, breaking the joints, lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc. complete. | 5 | Rmt | 260.03 | ₹1,300.15 |
| 4 | Dismantling dead pipeline of M.S./ R.C.C./ C.I./ P.S.C. and G.I./ A.C./ P.V.C./ S.W./ H.D.P.E. pipe including cost of necessary excavation and refilling of trenches, breaking the joints, lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc. complete. | 5 | Rmt | 287.29 | ₹1,436.45 |
| 5 | Dismantling dead pipeline of M.S./ R.C.C./ C.I./ P.S.C. and G.I./ A.C./ P.V.C./ S.W./ H.D.P.E. pipe including cost of necessary excavation and refilling of trenches, breaking the joints, lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc. complete. | 5 | Rmt | 71.3 | ₹356.5 |
| 6 | Dismantling dead pipeline of M.S./ R.C.C./ C.I./ P.S.C. and G.I./ A.C./ P.V.C./ S.W./ H.D.P.E. pipe including cost of necessary excavation and refilling of trenches, breaking the joints, lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc. complete. | 5 | Rmt | 80.73 | ₹403.65 |
| 7 | Dismantling dead pipeline of M.S./ R.C.C./ C.I./ P.S.C. and G.I./ A.C./ P.V.C./ S.W./ H.D.P.E. pipe including cost of necessary excavation and refilling of trenches, breaking the joints, lifting the pipes and stacking to the place as directed by Engineer-in-charge with all leads and lifts including cleaning the surface, etc. complete. | 5 | Rmt | 95.41 | ₹477.05 |
| 8 | Providing D.I. K-7 pipes (push on joints pressure pipes of D.I.of following class and diameters confirming to the I.S. specification inclusive cost of jointing materials (Rubber gasket of EPDM Quality) excluding GST levied by GOI & GOM in all respect including Third party inspection charges of TPI Agency approved by MJP including Transit insurance, Railway Freight,Unloading from railway wagon, Loading into Truck,Transportation to departmental store, unloading,stacking etc.completed as directed by Engineer incharges(IS 8329/2000 for pipes and IS 158/1969 and IS 12820/1989 or latest edition/revision with amendments for Rubber Gaskets. | 6 | Rmt | 1,267.64 | ₹7,605.84 |
| 9 | Providing D.I. K-7 pipes (push on joints pressure pipes of D.I.of following class and diameters confirming to the I.S. specification inclusive cost of jointing materials (Rubber gasket of EPDM Quality) excluding GST levied by GOI & GOM in all respect including Third party inspection charges of TPI Agency approved by MJP including Transit insurance, Railway Freight,Unloading from railway wagon, Loading into Truck,Transportation to departmental store, unloading,stacking etc.completed as directed by Engineer incharges(IS 8329/2000 for pipes and IS 158/1969 and IS 12820/1989 or latest edition/revision with amendments for Rubber Gaskets. | 6 | Rmt | 1,767.77 | ₹10,606.62 |
| 10 | Lowering & laying D.I K7 Pipes of various classes with CI/MS specials of following diameter in proper position, grade and alignment as directed by Engineer-in-Charge including conveyance of material from stores to site of work, including cost of jointing materials and rubber rings labour, giving hydraulic testing etc. complete. | 6 | Rmt | 75.49 | ₹452.94 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2240873.xls
BOQ • 0.40 MB
TNO_37_TFrom_Memo.pdf
Other Document • 0.48 MB
TNO_37_TFrom.pdf
Tender Documents • 5.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .