Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
11 May 2026, 4:00 pmClosed
eernbdivtangdar
eernbdivtangdar
Annual repairs, maintenance/unforeseen leakages and bursting of pipes(Stage) for block Tangdar-I
2026_PWDJK_309108_1
EN NIT 08 of RNB Div Tangdar 2026-27 PHE
Open Tender
Civil Works
Percentage
tangdar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Convener, purchase committee, Directorate of ISM
₹5,000
Yes
12 May 2026
30 Apr 2026
12 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth within 1km from cutting edge, disposed earth to be leveled and neatly dressed all kinds of soil | 1 | Cum | 479.3 | ₹479.3 |
| 2 | Ordinary rock | 1 | Cum | 924.8 | ₹924.8 |
| 3 | Earthwork in excavation by mechanical means over areas (exceeding 30cm in depth 1.5 mtr. in width as well as 10 sqm. plan) including disposal of excavated earth lead upto 1 km. and lift upto 1.5 mtr. disposed earth to be leveled and neatly dressed:In all kinds of soils | 1 | Cum | 187.3 | ₹187.3 |
| 4 | Ordinary rock | 1 | Cum | 392.8 | ₹392.8 |
| 5 | Filling available excavated earth excluding rock in trenches, plinth, sides of foundation etc in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m. | 1 | Cum | 218.4 | ₹218.4 |
| 6 | Dismantling GI pipes (external work) including excavation and refilling trenches after taking out the pipes, manually / by mechanical means incld. stacking of pipes within 50 mtrs lead:Above 40 mm nominal bore | 1 | RM | 121.65 | ₹121.65 |
| 7 | 15 - 40 mm nominal bore | 1 | RM | 109.65 | ₹109.65 |
| 8 | Dismantling C.I./D.I pipes manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes and lead at site within 50 meter lead as per direction of Engineer in-charge.Upto 150 mm diameter. | 1 | Mtr | 303.05 | ₹303.05 |
| 9 | Above 150 mm dia upto 300 mm dia. | 1 | Mtr | 402.1 | ₹402.1 |
| 10 | Laying and fitting of GI pipes complete excld. cost of pipes and earthwork:100 mm dia GI pipes | 1 | RM | 118.45 | ₹118.45 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1000906.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .