| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.9 LAccepted-AOC 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | L1 | Accepted-AOC L1 | |
| 2 | L2₹88.7 L+₹1.8 L (2.02%)Rejected-Finance | L2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | SRI SEMBAIYANAR CONSTRUCTIONS L2 | DEVI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Construction of Multipurpose Sports Ground in Govt Higher Secondary School at Theerthanagiri Panchayatin Kurinjipadi Block | |||||
| 2.00 | Play area Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 17.47 | M3 | 270 ₹4,716.9 | 263 ₹4,594.61 Lowest |
| 3.00 | Msand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications | 73.88 | M3 | 2,295 ₹1,69,554.6 | 2,271 ₹1,67,781.48 Lowest |
| 4.00 | Collection and supply of conveyed earth including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 70 | M3 | 125 ₹8,750 | 120 ₹8,400 Lowest |
| 5.00 | Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete. | 118.56 | M2 | 1,125 ₹1,33,380 | 1,095 ₹1,29,823.2 Lowest |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 12.76 | M3 | 6,850 ₹87,406 | 6,834 ₹87,201.84 Lowest |
| 7.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 92.34 | M3 | 6,125 ₹5,65,582.5 | 6,079 ₹5,61,334.86 Lowest |
| 8.00 | Wearing coat Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 54.41 | M3 | 7,400 ₹4,02,634 | 7,383 ₹4,01,709.03 Lowest |
| 9.00 | Basecut ball fencing Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 21.73 | cum | 270 ₹5,867.1 | 263 ₹5,714.99 Lowest |
| 10.00 | M.Sand filling with good M.sand including all cost and conveyance of all materials and all labour charges etc., complete. | 6.37 | Cum | 2,325 ₹14,810.25 | 2,271 ₹14,466.27 Lowest |
Tender Value
₹87.5 L
EMD Value
₹88,000
Closing Date
10 Feb 2026, 3:00 pmClosed
Additional Collector
Drda,Cuddalore
Construction of Rural Sports Ground at Theerthanagiri Government Higher Secondary School
2026_RDTN_646889_133
A14/6010/2025 PMKKKY
Open Tender
Civil Works - Others
Item Wise
180 days
DRDA
As per tender document
3 documents required · 3 mandatory
₹0
₹88,000
3 Apr 2026
9 Feb 2026
10 Feb 2026
9 Feb 2026
10 Feb 2026
9 Feb 2026
Construction of Multipurpose Sports Ground in Govt Higher Secondary School at Theerthanagiri Panchayatin Kurinjipadi Block
Play area Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Msand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Collection and supply of conveyed earth including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Wearing coat Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Basecut ball fencing Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
M.Sand filling with good M.sand including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:4:8 mix Using 40 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Column Super structure
Reinforced cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Above super structure
Supplying and fabricating and placing in position MS or RTS reinforcement works
Cement concrete 1:2:4 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Supply of 50 mm GI pipe inculding cost and conveyance of all materails to site including all labour charges completed.
Supply of chain Link-2"X2" using 10 Gauge Galvanised Iron Wire inculding cost and conveyance of all materails to site including etc.
Painting with Emulsion Paint including all charges etc., complete complying with standard specification
Cutting of 40mm G.I.Pipe
Fixing charges of G.I Pipe
Fixing charges for Fencing Mesh
Electrification arrangements
Supplying and fixing of steel Grill Gate including cost and conveyance of all materials to site and all labour charges etc complete 1 No
Sport material Providing Multi Sports Flooring with Synthetic Acrylic (8 Layers) including cost and all charges etc complete..,
Supplying and erection of Portable Basket Ball Post including cost and all charges
Supplying and erection of Portable Volley Ball Post including cost and all charges
Supplying and erection of Portable Ball Badminton Post including cost and all charges
PaverConstruction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 80mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.
Dressing Room Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Msand filling withgood Msand including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Reinforced cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Super structure
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces
Super structure
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete
Super structure
Plastering with cement mortar 1:5mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Paving the floor with best quality Vetrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Painting two coats with approved emulsion paint including cost and conveyance etc,. Complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Towards the cost of steel door of size 1.20mx2.10 m including all charges etc.
Towards the cost ofUpvc ventilator of size 0.90mx0.60 m including all charges etc.
Painting New iron works for doors, windows and Ventilators, Iron bars, Weldmesh, wiremesh, screen, steel bars, flats and other similar works etc., with Two coats of approved first quality of synthetic enamel paint over the existing red oxide primer in all floors. The rate is inclusive of cost of all materials and labour, brushes and scaffolding charges etc., complete complying with standard specification.
Electrical Arrangements
Cupboard Arrangements
Pickle Play area Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Msand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Wearing coat Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Fustal Play area Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Msand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix Using 40 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding M.Sand layer of 30 mm thickness and joints shall be filled by fine M.Sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.
Pickle ball fencing Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
M.Sand filling with good M.sand including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:4:8 mix Using 40 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Column Super structure
Reinforced cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Above super structure
Supplying and fabricating and placing in position MS or RTS reinforcement works
Cement concrete 1:2:4 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Supply of 50 mm GI pipe inculding cost and conveyance of all materails to site including all labour charges completed.
Supply of chain Link-2"X2" using 10 Gauge Galvanised Iron Wire inculding cost and conveyance of all materails to site including etc.
Painting with Emulsion Paint including all charges etc., complete complying with standard specification
Fixing charges of G.I Pipe and Fencing Mesh including all labour Charges Cutting of 40mm G.I.Pipe
Fixing charges of G.I Pipe
Fixing charges for Fencing Mesh
Supplying and fixing of steel Grill Gate including cost and conveyance of all materials to site and all labour charges etc complete 1 No
Electrification arrangements
Electrification arrangements
Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_783353.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
110.pdf
Tender Documents • 0.84 MB
BOQ_783353.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .