Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹27,416
Closing Date
6 Jul 2026, 4:00 pm
Similar tender results from the same govt authority in the past 3 years.
THE CHIEF GENERAL MANAGER, CFA
THE CHIEF GENERAL MANAGER, CORDITE FACTORY ARUVANKADU
Repairs to roof, floor of outer kitchen and retaining wall in front of the industrial canteen at Cordite factory Aruvankadu.
2026_MIL_280798_1
TE/CFA/07/EO/CIVIL/2026-27
Open Tender
Civil Works
140 days
Cordite Factory Aruvankadu/Tamilnadu/India
As per NIT
4 documents required · 4 mandatory
₹0
₹27,416
Yes
13 Jun 2026
13 Jun 2026
7 Jul 2026
13 Jun 2026
6 Jul 2026
13 Jun 2026
13 Jun 2026 - 6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings | 113 | Sqm | 33.28 | ₹3,760.64 | BI01010001010000000000000515BI0100001113 |
| 2 | Dismantling of Asbestos cement (corrugated, semicorrugated, etc.) sheets in roof coverings. | 10 | Sqm | 41.3 | ₹413 | BI01010001010000000000000515BI0100001114 |
| 3 | Dismantling wrought iron or mild steel work of any description | 3 | Qtl | 678.38 | ₹2,035.14 | BI01010001010000000000000515BI0100001115 |
| 4 | Dismantling timber scantlings 40 sq. cm and over in section unframed work in any position | 0.5 | Cum | 1,109.44 | ₹554.72 | BI01010001010000000000000515BI0100001116 |
| 5 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles | 46 | Cum | 696.2 | ₹32,025.2 | BI01010001010000000000000515BI0100001117 |
| 6 | M & L for Walling of random rubble, uncoursed, well bonded, bedded and solidly hearted, built in Cement mortar 1:4. | 63 | Cum | 5,697.89 | ₹3,58,967.07 | BI01010001010000000000000515BI0100001118 |
| 7 | Taking down Chowkhats or frames exc. 1.5 sq. m but n.exc. 4 sq.m each with shutters (without taking off shutters from the frames) and removing to CW store as directed | 2 | Each | 537.61 | ₹1,075.22 | BI01010001010000000000000515BI0100001119 |
| 8 | Demolition of unreinforced cement concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) | 22 | Cum | 1,627.81 | ₹35,811.82 | BI01010001010000000000000515BI0100001120 |
| 9 | Demolition of reinforced cement concrete in Roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work | 0.8 | Cum | 3,406.42 | ₹2,725.14 | BI01010001010000000000000515BI0100001121 |
| 10 | Laying of Hardcore of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface (Except material) as directed. | 25 | Cum | 609.23 | ₹15,230.75 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.79 MB
gc.pdf
Tender Documents • 0.72 MB
sc.pdf
Tender Documents • 0.43 MB
scope.pdf
Tender Documents • 0.46 MB
Compliance.xls
Tender Documents • 0.04 MB
sdnative.pdf
Tender Documents • 0.49 MB
sd.pdf
Tender Documents • 0.32 MB
BOQ_327656.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid