Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21 LAccepted-AOC 153 1A DIAMOND HARBOUR ROAD KOLKATA 700034 | KOLKATA | KOLKATA | WEST BENGAL | 700034 | L-1 | Accepted-AOC L1 | |
| 2 | L2₹22.6 L+₹1.6 L (7.38%)Rejected-Finance PLOT NO 3 FIRST FLOOR SARHAUL OPP HIPA SECTOR 18 GURUGRAM 122001 HARYANA | GURUGRAM | GURUGRAM | HARYANA | 122001 | L2 | Rejected-Finance Quoted higher rate | |
| 3 | L-3₹28.3 L+₹7.3 L (34.5%)Rejected-Finance | L-3 | Rejected-Finance Quoted higher rate | |
| 4 | L-4₹44.2 L+₹23.2 L (110.6%)Rejected-Finance 124 A NSC BOSE ROAD KOLKATA 700 092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | L-4 | Rejected-Finance Quoted higher rate |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
16 Jan 2021, 4:00 pmClosed
EXECUTIVE ENGINEER
World Bank NH Campus (Behind Asansol Girls College), Asansol 713 304
Preparation of DPR for the work of Strengthening of Panagarh Illambazar-Dubrajpur rd from 0.00 kmp to 48.80 kmp(SH-14) under Asansol Hy Divn,and Birbhum Hy DivnNo.II,P.W. (Rd) Dept. in the dist of P.Bardhaman and Birbhum, West Bengal during fy 20-21
2020_SH_311820_1
WBPWD/Rds/EE/AHD/eNIQ03/20-21
Open Tender
CIVIL WORKS
Item Rate
12 days
ASANSOL HIGHWAY DIVISION
Please refer Tender documents.
4 documents required · 4 mandatory
₹50,000
28 Jan 2021
30 Dec 2020
18 Jan 2021
30 Dec 2020
16 Jan 2021
30 Dec 2020
Amount
Scope of Work 1. Traffic Census for 7 days at 2 locations (with videography). 2. Axle Load Test for 24 hours at 2 locations. 3. Pavement Surface Distress Survey (As per Clause 5.3 of IRC: 115-2014) 4. Trial Pits at 2 Km Intervals with DCP and Sample Collection (As per Clause 5.5 of IRC: 115-2014) ( Subgrade soil investigation) with requisite test & report. 5.Bituminous Layer Core at 2 Km intervals (As per Clause 5.5 of IRC: 115-2014) 6.Falling Weight Deflectometer (FWD) Test (As per IRC: 115-2014) 7.FWD Data Analysis and Overlay Design (As per IRC: 115-2014 & IRC: 37-2018) 8. Topographical Survay. 9. Preparation drawing of plan , Profile . and cross section including calculation of earth work, 10. Preparation of DPR including preparation of Cost Estimate as per current Schedule of Rates of PW(Roads)Department, Govt. of WB, and in compliance to IRC publications and Bill Of Quantities and submission of draft DPR (1 Copy) and final DPR (6 Copies).
Xplorer Consultancy services pvt ltd
HIGHWAY SOLUTION PLUS
C. E. Testing Company Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .