Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
21 Mar 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
15/12 A, Thornhill Road, Civil line, Prayagraj
Construction of 11 KV U/g O/H line and Installatoin of 11/0.4 kv 400 KVA S/S on Plinth/D/P For Capacity Enhancement of T/F work under the Different Extend Area of EUDD-BM, MH Pyg. under Summer Plan of B.P. Year 2023-24
2023_PVVNV_783642_1
43/EUDC-II/PYG/SE/2022-23
Open Tender
Electrical Works
Lump-sum
90 days
Prayagraj
As per Tender Specification
2 documents required · 2 mandatory
₹590
Yes
S.E. EUDC-II, Prayagraj.
₹10,000
Yes
25 Mar 2023
11 Mar 2023
21 Mar 2023
11 Mar 2023
21 Mar 2023
11 Mar 2023
Amount
Erection of 11m long STP double pole with grouting, plinthing & Painting of sub station type with mounting of All accessories like 11 kv fuse set, TPMO, top channel,L.A. etc, grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (All required material for grouting will be arranged by the contractor per Resspo and Electrical Safety rule)
Erection & commissioning of T/F 400/250 KVA on plinth/Double Oole, along with HT/LT connections with mounting of All accessories like 11 kv fuse set, TPMO, top channel,L.A. etc, Complete in all respect on existing D/P
Construction of 11/0.4 KV Transformer plinth in size 1.5x1.5x 1.8 mtr. Height, including 0.6 mtr. below G.l. in bottom 1:4:8 cement sand and brick ballast; concreting upto 15 cm. thickness after ramming should be done. Thickness of 1st class brick work should be 0.35 mtr. below G.L. and above G.L. It should be 0.23 mtr. brick work bill be done with 1:4 cement, sand mortar, The space between the four walls should be filled with sand by ramming and watering keeping a space of 0.15 mtr on lop for 1:2:4 cement stone ballast and sand concreting. The two channels should be grouted as per direction of site in charge. All the sides of wall above G, L. should be plastered by 1:6 cement sand mortar having 12 mm thickness.(All required material will be arranged by the contractor as per Resspo and Electrical Safety rule)
Earthing of transformer body and neutral separately by lowering of GI pipe of size 1.50” dia 40’ deep/chemical pipe earthing, connecting with GI Strip of size 50x6 mm with clamp.(All material will be arranged by the contractor as per Resspo and Electrical Safety rule)
Erection/Fixing of Tailless unit 500/300 amp in L.T. cubical Box or on D/P, with the help of channel, clamp & nut bolt including fixing of Helney type fuse 500 AMP,Helney type fuse 300 AMP,copper strip,cotact,cable holding clamp etc. (All material will be arranged by the contractor including L.T.Cubical box as per Resspo and Electrical Safety rule)
Hanging of L.T. cable of size 1 x 400 sq.mm. for connection. The cable will come from T/F to L.T.Cubical box. Crimping Alu. lugs the both ends. (All required material will be arranged by the contractor as per Resspo and Electrical Safety rule)
Hanging/Laying of L.T. cable of size 3 ½ x400/240 sq.mm. for connection. The cable will come from L.T.Cubical box to L.T. Section Pole. Crimping the both ends . (All required material will be arranged by the contractor as per Resspo and Electrical Safety rule)
Errection&Commissioning of 11 KV,3X120/70 sq.mm XLPE Cable with hanging arrangement (with the help of stay wire). all required Local materials arranged by the contractor as per Resspo and Electrical Safety rule.
Fixing and providing of Heat Shrink cable type end Terminations suitable for 11 KV, 3x120sq mm XLPE cable and 11 KV 3X120 sq mm ISI mark jointing kit will be arrange by the contractor as per Resspo and Electrical safety rules.
Outdoor/indoor jointing kit
Erection, grouting, plinthing & earthing of single support pole 9 mtr long ST Pole for LT line/ABC, including fixing of necessary clamps grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting & plinthing material will be arranged by the contractor)
Errection&Commissioning of (3x120+1x195+1x16)/ (3x95+1x70+1x16) sq.mm ABC.with 1 no. weasel conductor for neutral ,Distribution box, necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor .
Dismantling of all the HT/LT line, connections & earthing of old 11/.4 kV,250 transformer along with LT cubical box, cable GO set, DO set & T/F, safe loading carrage and unloading of dismentled item from site of work to center store Naini/Power House store/Dump site.
Urmila Associates
PRANIKA ENTERPRISES
J.L. Enterprises
RAJU ELECTRIC WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .