| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-AOC 39 PRATAPGANJ PETH SATARA TALUKA DISTRICT SATARA | PUNE | MAHARASHTRA | 412206 | ₹21.8 L | L1 | Accepted-AOC As per NIT |
| 2 | L2₹23.1 LRejected-AOC A P NEVARI TAL KADEGAON DIST SANGLI | NEVARI | SANGLI | MAHARASHTRA | ₹23.1 L | L2 | Rejected-AOC As per NIT |
| 3 | L3₹23.3 LRejected-AOC | ₹23.3 L | L3 | Rejected-AOC As per NIT |
| 4 | L4₹25.0 LRejected-AOC NOT FOUND | NEW DELHI | DELHI | 110001 | ₹25.0 L | L4 | Rejected-AOC As per NIT |
| 5 | L5₹25.9 LRejected-AOC SATARA | MAHARASHTRA | 412206 | ₹25.9 L | L5 | Rejected-AOC As per NIT |
Tender Value
₹27.2 L
EMD Value
₹27,300
Closing Date
26 May 2026, 11:00 amClosed
Executive Engineer MIDC Division Kolhapur
1st Floor MIDC Office Udyog Bhavan Nagala Park Kolhapur
KARAD G C INDUSTRIAL AREA M and R to Roads in Karad Industrial Area Improvements to D Block Road O O1 O2 and part O2 N3 M3 L2 by providing bituminous treatment
2026_MIDC_1301906_1
21 of 2026
Open Tender
Civil Works
Percentage
Satara
Please refer Tender Document
8 documents required · 8 mandatory
₹7,080
₹27,300
21 Jul 2026
11 May 2026
27 May 2026
11 May 2026
26 May 2026
21 May 2026
11 May 2026 - 15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1M & R to Roads in Karad Industrial Area … Improvements to D Block Road (O–O1–O2 and part O2–N3–M3–L2) by providing bituminous treatment | |||||
| 0.0 | Picking the road surface including sectioning etc. complete (WBM surface.) | 3,705 | sqm | 34.1 | ₹1,26,340.5 |
| 0.0 | Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all
materials, preparing the existing road surface, spreading 40 mm. stone layers metal 100% crusher broken metal with conical crusher plant , heating and spraying the bitumen of specified grade @ 2 kg / sqm ,
spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to
achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of specified grade of bitumen at the rate of 0.30 Kg Sqm. on existing
bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | 3,705 | sqm | 329.2 | ₹12,19,686 |
| 0.0 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates) | 3,705 | sqm | 21 | ₹77,805 |
| 0.0 | Open Graded Premix SurfacingProviding and Laying OGC 20 mm thickness composed of 13.2 mm to
5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously
prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | 3,705 | sqm | 209.15 | ₹7,74,900.75 |
| 0.0 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete.
(VG-30 bulk bitumen rates are considered to arrive at rates) | 3,705 | sqm | 78 | ₹2,88,990 |
| 0.0 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | 156 | cum | 1,084.9 | ₹1,69,244.4 |
| 0.0 | BITUMEN: Penetration, Softening Point, Flash & Fire Point, Specific Gravity | 2 | 1 test | 3,135 | ₹6,270 |
| 0.0 | BITUMEN: Viscosity. | 2 | 1 test | 1,910 | ₹3,820 |
| 0.0 | BITUMEN: Ducility / Elastic Recovery | 2 | 1 test | 905 | ₹1,810 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
TenderDocument.pdf
Tender Documents • 0.45 MB
ItemSpecification.pdf
Other Document • 0.02 MB
BOQ_2235435.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].