Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC AT BANJIPALI BLOCK P S KHAPRAKHOL P O DHANDAMUNDA DIST BALANGIR PIN 767028 | BANJIPALI | BALANGIR | ODISHA | 767028 | ₹1.2 Cr Quoted ₹99.1 L | L1 | Accepted-AOC accepted |
| 2 | L1₹99.1 LRejected-Finance | ₹99.1 L | L1 | Rejected-Finance rejected |
| 3 | L1₹99.1 LRejected-Finance | ₹99.1 L | L1 | Rejected-Finance rejected |
| 4 | L1₹99.1 LRejected-Finance AT PO RAMPUR PS PATNAGARH DISTT BOLANGIR | PATNAGARH | BOLANGIR | ODISHA | ₹99.1 L | L1 | Rejected-Finance rejected |
| 5 | L1₹99.1 LRejected-Finance | ₹99.1 L | L1 | Rejected-Finance rejected |
Tender Value
₹99.2 L
EMD Value
₹99,500
Closing Date
7 Mar 2026, 5:00 pmClosed
SE, M.I. Division,Balangir
O/o the SE, M.I. Division,Balangir
Construction of Putulamahul Check Dam in Khaprakhol Block of Balangir District Under The scheme MATY 3.0 for the year 2025-26
2026_CEMIB_126648_3
08 (BGR)/2025-26
Open Tender
Civil Works - Water Works
90 days
Khaprakhol
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹99,500
Yes
8 Apr 2026
26 Feb 2026
9 Mar 2026
26 Feb 2026
7 Mar 2026
26 Feb 2026
Excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC within an initial lead of 1 km. from the place of excavation complete.
Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge.
Cement concrete M15 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labouer with all lead for materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground level etc. complete in all respect to proper slope & level with all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge.
Cement concrete M20 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labouer with all lead for materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground level etc. complete in all respect to proper slope & level with all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge.
Straightening, cutting, bending, binding and lying the grills as per approved design & placing in position including cost, conveyance of M.S. Rod & binding wire 18 to 20 gauge complete as directed by the Engineer-in-charge. (Weight of binding wire is not included for payment)
Rigid & smooth steel centering & shuttering for concrete works and dismantling then after casting including cost of materials complete (For concrete foundation ,cut off and appron)
Rough stone dry packing in aprons and revetments to all heights with H.Stone of size 15cm - 30cm including cost, conveyance, royalty to proper slope and level complete in all respect as directed by the Engineer-in-charge.(Minimum 1/6 volume will be deducted towards voids)
Supplying, Manufacturing & Fixing Embeded parts in concrete including anchoring and placing in specified positions including supply of all materials, Labour, T&P etc for manufacturing embedded parts as per design and fixing in position in proper alignment by welding rigidly to reinforcement as directed by the Engineer-in-charge
Providing Blockouts in concrete for fixing embedded parts in gate grooves and other embedments for dams and barrages etc. with wooden planks with costof all materials labour charges, T & P etc complete including fixing anchor rods complete as directed by the Engineer-in-charge.
Fixing 25mm dia anchor bars in foundation rock including 35mm dia hokes, fixing wedged anchors & grouting with cement mortar (1:4) complete as per the direction of E.I.C.
Please Enable Macros to View BoQ information
stage.html
html • 0.15 MB
technical_583045.pdf
techsummary_583045.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
DTCN.pdf
Tender Documents • 24.31 MB
BOQ_583045.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid