| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 CrAccepted-Finance 142 | ₹15.9 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹16.6 CrRejected-Finance FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | ₹16.6 Cr | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S SHIV SHAKTI CONSTRUCTION L2 | Pratap Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum. | 57,439.39 | Cum | 50 ₹28.7 L | 26 ₹14.9 L |
| 2.00 | Earth Work in filling for making Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum. | 4,48,415.71 | Cum | 160 ₹7.2 Cr | 78 ₹3.5 Cr |
| 3.00 | Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. including cost of all labour, T&P etc. | 24,919.43 | Cum | 50 ₹12.5 L | 70 ₹17.4 L |
| 4.00 | Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum. | 3,326.06 | Cum | 160 ₹5.3 L | 135 ₹4.5 L |
| 5.00 | Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering per sqm. | 18,048.98 | Sqm | 300 ₹54.1 L | 195 ₹35.2 L |
| 6.00 | Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering per sqm. | 5,432.56 | Sqm | 350 ₹19.0 L | 350 ₹19.0 L |
| 7.00 | Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc. per M.T. | 118.89 | M.T. | 75,000 ₹89.2 L | 71,000 ₹84.4 L |
| 8.00 | Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc. per Cum. | 1,062.21 | Cum | 600 ₹6.4 L | 1,100 ₹11.7 L |
| 9.00 | Providing and Laying C.C A-40 M-10-in foundation of all structures with cement (O.P.C. 43 Golease sand of FM-not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.0 m, lift upto 3,0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material T. & P., labour etc. per Cum. | 1,627.36 | Cum | 4,500 ₹73.2 L | 4,200 ₹68.3 L |
| 10.00 | Providing and Laying C.C. A20, M-15 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. per Cum. | 4,619.07 | Cum | 5,000 ₹2.3 Cr | 4,900 ₹2.3 Cr |
Tender Value
₹21.4 Cr
EMD Value
₹42.8 L
Closing Date
13 Feb 2026, 2:00 pmClosed
SE, KBLCCC, BANDA
Office of The Superintending Engineer, Ken-Betwa Link Canal Construction Circle, Banda, Address-Nawab Tank, Banda-210001
Restoration of Dys and Minors offtaking from km. 19.800 to km. 40.225 of Banda Branch in Ken Canal System under Ken-Betwa Link Project
2026_UPIDC_1104143_6
04/SE/2025-26
Open Tender
Civil Works - Canal
547 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹42.8 L
Office of The Superintending Engineer
16 Mar 2026
6 Jan 2026
13 Feb 2026
6 Jan 2026
13 Feb 2026
6 Jan 2026
16 Jan 2026
Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum.
Earth Work in filling for making Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum.
Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. including cost of all labour, T&P etc.
Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum.
Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering per sqm.
Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T.&P. etc.Centering & shuttering per sqm.
Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc. per M.T.
Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc. per Cum.
Providing and Laying C.C A-40 M-10-in foundation of all structures with cement (O.P.C. 43 Golease sand of FM-not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.0 m, lift upto 3,0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material T. & P., labour etc. per Cum.
Providing and Laying C.C. A20, M-15 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. per Cum.
Providing and Laying C.C. A20, M-20 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. per Cum.
Providing and Laying R.C.C. A20, M-20 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. Per Cum.
Laying C.C. A20, M-25 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. per Cum [As per Mix Design]
Laying R.C.C. A20, M-25 with cement (O.P.C., 43 Grade), coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. per Cum [As per Mix Design]
Laying C.C. A20, M-30 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. per Cum
Dewatering by pump hiring of pump & POL/KWH Including all cost of material labour etc per KWH
S/F Drainage spout pipe 100 mm dia In RCC slab required for proper completion of work including cost of all materials, labour, T.& P. etc per RM.
Providing and laying 1200mm dia Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints etc. complete per RM.
Providing, laying, Jointing & field testing of High Density Polyethylene pipes, (HDPE) PE100 PN6 confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing of pipes by electro fusion / butt welding process .with all leads and lifts etc. complete/RM.
Brick work in 1:4 cement mortar with 1st Class Brick, coarse sand of F.M. not less than 2.0 required for proper completion of work including cost of all materials, labour, T&P etc. per Cum.
Providing & Laying R.C.R. 1 : 4 Cement Sand Mortar required for proper completion of work including cost of all materials, labour, T&P etc.
Struck Raised Pointing on stone masonry in C.M. 1 : 2 required for proper completion of work including cost of all material T&P, labour etc. Per Sqm.
Struck Deep Pointing on Brick masonry in C.M. 1 : 2 required for proper completion of work including cost of all materials, labour, T&P etc. Per Sqm.
Filling/Laying Coarse sand as a filter material required for proper completion of work including cost of all materials, labour, T&P etc. per Cum.
Laying stone grit 10-20 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc. per Cum.
Supply & laying of stone grit 20-40 mm gauge as a filter material i/e all cost of material labour and T & P etc. per Cum.
Providing & Laying Boulder Apron for Bed protection with stone boulder required for proper completion of work including cost of all materials, labour, T&P etc. per Cum.
Preparation of Subgrade required for proper completion of work including cost of all materials, labour, T&P etc. per Sqm.
Filling/Laying Coarse sand as a filter material below lining required for proper completion of work including cost of all materials, labour, T&P etc. per Cum.
Laying Cement plaster 1:6 Cement Sand mortar required for proper completion of work including cost of all materials, labour, T&P etc. per Sqm.
Laying Cement plaster 1:4 Cement Sand mortar required for proper completion of work including cost of all materials, labour, T&P etc. per Sqm.
Supplying/Laying two coat Bitumen painting on sleeper top with cost of Bitumen, fuel for heating required for proper completion of work including cost of all materials, labour, T&P etc. per Sqm.
Supply & laying of 200 micron L.D.P.E film over plaster work required for proper completion of work including cost of all materials, labour, T&P etc. per Sqm.
Providing & Laying 75 mm thick C.C. lining in A20, M-20 with 4.75 mm to 20 mm hard stone grit and coarse sand of F.M. not less than 2.0 on Bed and Side Slope required for proper completion of work including cost of all materials, labour, T&P etc..
Making construction joint in lining & filling sealing compound in joint required for proper completion of work including cost of all materials, labour, T&P etc. per Rm.
Dismantling reinforce cement concrete including disposal of unserviceable material and stacking the serviceable material per Cum.
Dismantling of bricks or stone masonry in lime or cement mortar. including disposal of unserviceable material and stacking the serviceable material per Cum.
Earth Work in Dismantling of Diversion/Approach Road/Ramp (Head Discharge above 6.00 Cumec) required for proper completion of work including cost of all labour and T&P etc. per Cum.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BD-NIT04-SE-25-26LOT06.pdf
Tender Documents • 2.24 MB
BOQ_2036685.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid