Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | -0.01% | ₹10.0 L | L1 | Admitted-Finance |
| 2 | L2₹10.3 L+₹30,087.37 (3.01%)Admitted-Finance | +3.00% | ₹10.3 L+₹30,087.37 (3.01%) | L2 | Admitted-Finance |
| 3 | L3₹10.4 L+₹40,083.17 (4.01%)Admitted-Finance | +4.00% | ₹10.4 L+₹40,083.17 (4.01%) | L3 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
23 Jul 2026, 5:00 pmClosed
Executive Enginner (W) Div Degloor Z.P. Nanded
Executive Enginner (W) Div Degloor Z.P. Nanded
CONSTRACTION OF C.D. WORK AND C.C. ROAD ON VIDYANIKETAN VIDYALAYA ALUR SCHOOL ROAD AT. ALUR TQ. DEGLOOR.
2026_NANDE_1317821_10
ZPN/WD/DEG/e.TEN02/UEE/26-27
Open Tender
Civil Works
Percentage
180 days
CONSTRACTION OF C.D. WORK AND C.C. ROAD ON VIDYAN
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
14 Aug 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. (By/manaual Means) a) Upto 1.50m lift Normal Rate Spec. No.: BR.3 Page Number 102 SSR No. 12.02a P.No. 84 | - | CUM | - | - |
| 2 | Providing and laying in situ cement concrete of 1:4:8 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc) Spec. No.: CD.3 Page. No. 160 SSR No.11.04 P.No. 81 | 1 | CUM | - | - |
| 3 | Providing cast in situ / ready mix M10 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc), cement 4.05 bags/cumt) Spec. No.: CD 8 Page 163 SSR No. 11.28 P.No. 83 | 1 | CUM | - | - |
| 4 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 900mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. Spec. No.: CD.7 Page.No. 162 SSR No.11.11 P.No. 81 | - | RGM | - | - |
| 5 | Providing selected hard murum filling including laying in layers of 15 to 20cmwith watering and compacting etc. complete. Spec. No.: CD.14 Page. No. 167 SSR No.11.24 P.No. 82 | 1 | CUM | - | - |
| 6 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including. excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge Spec. No.: MORTH 801 SSR No.6.36 P.No. 60 | - | NO | - | - |
| 7 | ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.67 Dt.15 May,2015. States that the royalty charges of Rs.141.34/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor.ROYALTY FOR OTHER MINERALS | 1 | cum | - | - |
| 10 | ADD 18%GST | - | NO | 0.29 | - |
| 11 | ADD 0.5% INSURANCE | - | NO | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.30 MB
Tendernotice_2.pdf
PDF • 1.13 MB
BOQ_2259023.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .