| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAccepted-AOC GROUND FLOOR GANGA APARTMENT KOTHABARI NEW BANSHBARI MALDA | 73 | ₹31.9 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹32.2 LRejected-Finance 19 A NIRUPAMA DEVI ROAD LANE 1 BERHAMPORE MURSHIDABAD WEST BENGAL 742101 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742101 | ₹32.2 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹32.4 LRejected-Finance BANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | ₹32.4 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | M/S. Sajahan Chowdhury L2 | MERCURY ENGINEERINGCOMPANY L1 | NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD. L3 |
|---|---|---|---|---|---|---|
| 1.00 | INTAKE:- Daily labour charges with bonus (once in a year) for 3(three) nos of operator, operation and upkeepment of 3 (Three) Nos. 20KW capacity Vertical Turbine Pump, Controll Panel Board etc. complete on round the clock basis with switching On/Off of the outdoor and indoor lighting arrengement with other Electrical Accessories and Ancillaries including sweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation by engaging experienced operators, electrician on daily basis. | 365 | Days | 1,875 ₹6.8 L | 1,865 ₹6.8 L | 1,890 ₹6.9 L |
| 1.01 | ESIC contribution for Employers for sl no 1. @ 3.25 % | 365 | Days | 47.49 ₹17,333.85 | 47.49 ₹17,333.85 | 47.49 ₹17,333.85 |
| 1.02 | EPF contribution for Employers for sl no 1. @ 13 % | 365 | Days | 189.93 ₹69,324.45 | 189.93 ₹69,324.45 | 189.93 ₹69,324.45 |
| 2.00 | Supervision charges for electrical installation by licensed Electrician as per IE Rules, 1956 read with latest amendments with overhead expenditures.The cost of visit charges of the Electrician at least two days in a month and as and when required along with expart technician for supervision of the installation for the following period. | 12 | Months | 8,690 ₹1.0 L | 8,680 ₹1.0 L | 8,695 ₹1.0 L |
| 3.00 | WTP:- Daily labour charges with bonus( once in a year) for 4 (Four) nos of operator, operation and upkeepment of 2 (Two) Nos. 150KW capacity centrifugal pump 2(Two) Nos. Back wash pump of 30kw, 2 nos Chlorine booster pump ,1 No. Dewatering Pump, Control Panel board, 1 no overhead crane having Hoisting, Cross Travel and Long Travel Operation, Electrically and manually operated actuator controlled and hand operated butterfly valves, etc. complete on round the clock basis with switching On/Off of the outdoor and indoor lighting arrengement with other Electrical Accessories and Ancillaries including sweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation by engaging experienced operators, electrician, helper on daily basis. | 365 | Days | 2,520 ₹9.2 L | 2,490 ₹9.1 L | 2,530 ₹9.2 L |
| 3.01 | ESIC contribution for Employers for sl no 3 @ 3.25 % | 365 | Days | 63.32 ₹23,111.80 | 63.32 ₹23,111.80 | 63.32 ₹23,111.80 |
| 3.02 | EPF contribution for Employers for sl no 3 @ 13 % | 365 | Days | 253.24 ₹92,432.60 | 253.24 ₹92,432.60 | 253.24 ₹92,432.60 |
| 4.00 | Supervision charges for electrical installation by licensed Electrician as per IE Rules, 1956 read with latest amendments with overhead expenditures.The cost of visit charges of the Electrician at least two days in a month and as and when required along with expart technician for supervision of the installation for the following period | 12 | Months | 8,690 ₹1.0 L | 8,680 ₹1.0 L | 8,695 ₹1.0 L |
| 5.00 | Labour Charges for 2 (Two) Nos operating personnel for operation, maintenance and guarding of the entire gaseous chlorination plant including operation of valves,Disinfection arrangement, internal/ external illuminations as per specification and round the clock guarding of the whole installation with all accessories. | 365 | Days | 1,275 ₹4.7 L | 1,245 ₹4.5 L | 1,290 ₹4.7 L |
| 5.01 | ESIC contribution for Employers for sl no 5 @ 3.25 % | 365 | Days | 31.66 ₹11,555.90 | 31.66 ₹11,555.90 | 31.66 ₹11,555.90 |
Tender Value
Refer Docs
EMD Value
₹64,400
Closing Date
14 Jan 2026, 6:00 pmClosed
Executive Engineer, Malda Mechanical Division, PHE
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operatin and maintance works at different surfacre and sub surface based water supply shcemes under MLMD PHE Dte.
2025_PHED_970135_18
WBPHED/EE/MLMD/NIeT_17 of 2025-2026
Open Tender
Electrical Work/ Equipment
365 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
5 documents required · 5 mandatory
₹64,400
20 May 2026
19 Dec 2025
16 Jan 2026
19 Dec 2025
14 Jan 2026
19 Dec 2025
Amount
INTAKE:- Daily labour charges with bonus (once in a year) for 3(three) nos of operator, operation and upkeepment of 3 (Three) Nos. 20KW capacity Vertical Turbine Pump, Controll Panel Board etc. complete on round the clock basis with switching On/Off of the outdoor and indoor lighting arrengement with other Electrical Accessories and Ancillaries including sweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation by engaging experienced operators, electrician on daily basis.
ESIC contribution for Employers for sl no 1. @ 3.25 %
EPF contribution for Employers for sl no 1. @ 13 %
Supervision charges for electrical installation by licensed Electrician as per IE Rules, 1956 read with latest amendments with overhead expenditures.The cost of visit charges of the Electrician at least two days in a month and as and when required along with expart technician for supervision of the installation for the following period.
WTP:- Daily labour charges with bonus( once in a year) for 4 (Four) nos of operator, operation and upkeepment of 2 (Two) Nos. 150KW capacity centrifugal pump 2(Two) Nos. Back wash pump of 30kw, 2 nos Chlorine booster pump ,1 No. Dewatering Pump, Control Panel board, 1 no overhead crane having Hoisting, Cross Travel and Long Travel Operation, Electrically and manually operated actuator controlled and hand operated butterfly valves, etc. complete on round the clock basis with switching On/Off of the outdoor and indoor lighting arrengement with other Electrical Accessories and Ancillaries including sweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation by engaging experienced operators, electrician, helper on daily basis.
ESIC contribution for Employers for sl no 3 @ 3.25 %
EPF contribution for Employers for sl no 3 @ 13 %
Supervision charges for electrical installation by licensed Electrician as per IE Rules, 1956 read with latest amendments with overhead expenditures.The cost of visit charges of the Electrician at least two days in a month and as and when required along with expart technician for supervision of the installation for the following period
Labour Charges for 2 (Two) Nos operating personnel for operation, maintenance and guarding of the entire gaseous chlorination plant including operation of valves,Disinfection arrangement, internal/ external illuminations as per specification and round the clock guarding of the whole installation with all accessories.
ESIC contribution for Employers for sl no 5 @ 3.25 %
EPF contribution for Employers for sl no 5 @ 13 %
Supervision charges for Gas plant by Gas Plant suppervisor.The cost of visit charges of the Gas Plant suppervisor at least two days in a month and as and when required along with expart technician for supervision of the installation for the following period.
Periodical Maintenance by Cleaning of contacts by CRC 226 spray in the MCC Panel Board, cleaning of all Terminal Sockets, Coils, greasing of Pump & Motor bearings, filling up lubricating oil, change of gland packing, etc along with minor repairing (if required) of the electro mechanical equipments by supplying necessary sundry materials/electro mechanical accessories as required/ once in a month in presence of Electrical Supervisor / Electrician and to be recorded in the log book with date.
Add Cess @ 18%
Add Cess @ 1%
M/S. Sajahan Chowdhury (BID ID -7852493)
NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD. (BID ID -7850757)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.12 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Terms_Ganga_western_Intake.pdf
Tender Documents • 0.64 MB
BOQ_2379059.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid