Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | ₹3.8 L | L1 | Accepted-Finance unsuccessful |
| 2 | L1₹3.8 LAccepted-Finance R O MARKHA | KAKCHING | MANIPUR | 795101 | ₹3.8 L | L1 | Accepted-Finance successful bidder on conducting lottery |
| 3 | L2₹4.3 L+₹49,454.83 (12.9%)Accepted-Finance | ₹4.3 L+₹49,454.83 (12.9%) | L2 | Accepted-Finance quoted high rate |
| 4 | L3₹5.3 L+₹1.5 L (38.6%)Accepted-Finance | ₹5.3 L+₹1.5 L (38.6%) | L3 | Accepted-Finance quoted high rate |
Tender Value
₹5.5 L
EMD Value
₹10,980
Closing Date
6 Jul 2026, 2:00 pmClosed
Executive Engineer REW Leh
REW Leh
Construction of Public Park at Saboo (Rubber Tiles and Solar Street Light)
2026_RDD_19083_2
19- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Payable To Executive Engineer REW Leh
₹10,980
23 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
6 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & fixing of rubber tile flooring 25mm thick made of SBR (Styrene Butadiene Rubber) with interlocking arragemeent & adhesive | 170.56 | sqm | 1,830.5 | ₹3,12,210.08 |
| 2 | Supply and installation of solar light of approved and certification by MRE(GOl) for leh block, District, with following conditions: 1) PV module- 75 Wp under STC.2|Battery - Minimum 12 V, 30 AH capacity Lithium iron phosphate (LifePO4). 3) Light Source- White Light Emitting Diode (W-LED). 30-watt, W-LED luminaire, dispersed beam, soothing to eyes with the use of proper optics and diffuser. LED chip should be compliance to IES: LM-80 (Approved method of measuring Lumen Maintenance for LED light sources and LED lumen depreciation time to L70). Test report for the same should be submitted.4) Light Output- The luminaire must use high efficacy W-LED with minimum 150 lumens per watt (and UV free). ( A certificate to be submitted by the system supplier to the test lab during certification.]For single light level- minimum 15 Lux when measured at a point4 metres below the light. The illumination should be uniform without dark bands or abrupt variations and soothing to eye. Higher light output will be preferred. For multiple Light levels- The luminaire should have two levels of light to take care of different lightning needs during the night. Minimum 15 Lux when measured at a point 4 metres below the light ( at " high illumination level"). The illumination should be uniform without dark bands or abrupt variations. Minimum 5 Lux at lower illumination levels. (Higher light output will be preferred). The luminaire shall be tested for Electrical, Photometry and Color parameters as per IES LM-79:2008 or IS: 16106:2012 for following Performance parameters like ia)
Total luminous flux:
>=3000 Im. b)
Luminous efficacy (i.e system efficacy): >=150lm/W.c)
Colourtemperature: Between
5500K to 6500 K.c) Colourtemperature: Between 5500 Kto 6500K. d)
CRI>=70. e) Luminous
intensity distribution should follow the batwing patterns in polar curves. e)
Luminous Intensity
distribution should follow the batwing patterns in polar curves.f) Require validation report using .les file, which is generated during luminous intensity distribution test and using maintenance factor 0.9 and pole height of 4m, road width 5m and pole span 15m. The average Illuminance level and uniformity should comply with requirements as per IS:1944, wherever applicable. 5) Mounting of Light: Pole height 5m above the ground level and 1m below the ground. Luminaire shall be at least 4.5 m above the ground level. The diameter of pole should be 75-76 mm and the thickness 2-3 mm. 6)Electronles Efficlency- Overall total efficiency of the electronics should be Minimum 90%. 7) Duty Cycle- Dusk to Dawn: Flrst 8 hours full light (Min 15 Lux), rest of the time at lower light (50%, Min 10 Lux) level. (Higher light output will be preferred) utonomy- 2 days or Minimum 12 operating hours per permissible discharge with fully charged LifeP04 battery, 9) Autonomy- 2 days or Minimum 12 operating hours per permissible discharge with fully charged LifeP04 battery. 10) Ingress Protection- POptical and control gear compartment- IP 65/ IP 66. 11) Impact Resistance of casing->= IK 08.12) Working temperatures -25 degree C to 60 degree C. 15) Civil work- Earth work and cement concrete in (1:2:4) mix using 20mm crushed stone aggregate. Including Carrlage of Cement, Solar light complete set (including light pole, battery, solar panels, LED | 14 | no | 16,949.15 | ₹2,37,288.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
BOQ_45600.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .