Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | L1 | Accepted-AOC agreement done | |
| 2 | L2₹1.8 Cr+₹29,365.84 (0.16%)Rejected-Finance | L2 | Rejected-Finance Due To L2 | |
| 3 | L3₹1.8 Cr+₹1.1 L (0.59%)Rejected-Finance AT KAPTANPARA KHUSHKIBAGH PURNIA BIHAR 854305 | PURNIA | BIHAR | 854305 | L3 | Rejected-Finance Due To L3 | |
| 4 | L4₹1.9 Cr+₹4.8 L (2.64%)Rejected-Finance 171 B 4 MADHUR VIHAR DELHI | EAST DELHI | DELHI | 110092 | L4 | Rejected-Finance Due To L4 | |
| 5 | L5₹2.3 Cr+₹42.8 L (23.4%)Rejected-Finance | L5 | Rejected-Finance Due To L5 |
Tender Value
₹2.3 Cr
EMD Value
₹4.5 L
Closing Date
9 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Engineer-in-Chief RWD PATNA
Rural Works Department, Bihar 5th floor, Visvesvaraya Bhawan, Nehru Path, Patna-800015
MMGSY(AWSESH-SC)-Pupri-576
2025_RWD_142437_1
MMGSY(AWSESH-SC)-Pupri-576
Open Tender
CIVIL
Percentage
365 days
Pupri
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹4.5 L
19 Feb 2026
30 Jun 2025
9 Jul 2025
30 Jun 2025
9 Jul 2025
30 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MMGSY ROAD SHARIKPUR TO END POINT NAME | - | - | - | - |
| 2 | Setting Out Pillars
Providing & Fixing of Working benchmark Pillars 2 nos. per km & 6 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I | 15 | No. | 3,249.38 | ₹48,740.7 |
| 3 | Clearing and Grubbing Road Land (By manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of E/I | 0.65 | Hec | 75,360.38 | ₹49,059.61 |
| 4 | Dismantling Brick/Tile Work
Dismantling of existing structures, like culverts, bridge,retaining wall and other structures comprising of brick masonary including unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per technical specification clause 202. | 89.1 | Cum | 307.62 | ₹27,408.94 |
| 5 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
a) Reinforced Cement Concrete | 10.77 | Cum | 566.16 | ₹6,097.54 |
| 6 | Removing all types of Hume pipe and stacking within a lead of 1000m including earthwork and dismantling of masonary works as per technical specification clause 202.1 .
B) Above 600 mm to 900 mm dia Hume Pipe | 10 | Mtr | 349.05 | ₹3,490.5 |
| 7 | Box Cutting
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 114.19 | Cum | 115.85 | ₹13,228.62 |
| 8 | Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 50 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 (Including Royality & Labour Cess). | 131.9 | Cum | 58.58 | ₹7,726.7 |
| 9 | Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 . (Including Royality & Labour Cess).
For 1000 m lead @ 20 % | 781.09 | Cum | 264.49 | ₹2,06,589.57 |
| 10 | For 100 m lead @ 80% | 3,124.35 | Cum | 174.18 | ₹5,44,198.59 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 3.72 MB
CMBD_MMGSY_AWSESH.pdf
Tender Document • 5.56 MB
BOQ_221565.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .