| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.5 CrAccepted-AOC WARD NO 06 RANJCET DAFAI AMLAI COLLIERY DISTT ANUPPUR M P | ANUPPUR | ANUPPUR | MADHYA PRADESH | ₹1.5 Cr | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹1.6 CrRejected-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹1.6 Cr | L-2 | Rejected-Finance Rejected as L-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical TECHNIALLY REJECTED |
| 4 | Rejected-Technical WARD NO 04 NEAR LIC PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 UDYAM MP 13 0003872 | CHHINDWARA | MADHYA PRADESH | 480441 | - | - | Rejected-Technical TECHNIALLY REJECTED |
| Sl No | Description | Qty | Unit | ABADH KISHOR SHARMA | UDAY RAJ SINGH |
|---|---|---|---|---|---|
| 1.00work description | |||||
| 1.01 | General cleaning/house keeping not exceeding 5cm in depth Including disposal of cleaned muck/debris to be stacked upto50m. or to be | 252.45 | m3 | 1,50,712.65 ₹1.8 L | 1,38,847.5 ₹1.6 L |
| 1.02 | Groove cutting for stopping and manhole by chisel/pickaxe and hammer
(a)in soft stone (In floor) | 22.46 | m3 | 1,35,501.18 ₹1.6 L | 1,28,695.8 ₹1.5 L |
| 1.03 | (b) In soft stone (In Roof) | 22.46 | m3 | 1,35,501.18 ₹1.6 L | 1,28,695.8 ₹1.5 L |
| 1.04 | (c) In Coal | 43.47 | m3 | 71,725.5 ₹84,636.09 | 67,813.2 ₹80,019.58 |
| 1.05 | (RCC) Reinforced cement concrete(1:2:4) In wall/roof ceiling of alr crossing/ stopping (any thickness) in u/g (Excluding,shuttering. rainforcement cutting, bendinR. placing In position and binding etc) | 494.11 | m3 | 26,52,382.48 ₹31.3 L | 25,19,961 ₹29.7 L |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting,bending, placing in position and binding and strutting, prapping etc complete.
(6.00 x 3.50x2x16) = 6762.00 m2 | 5,409.6 | m2 | 54,09,600 ₹63.8 L | 53,55,504 ₹63.2 L |
| 1.07 | 6mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material) | 2,704.8 | m3 | 10,11,595.2 ₹11.9 L | 9,46,680 ₹11.2 L |
| 1.08 | Loading of all kind building materials In to tub at Inc. mouth-
a) Cement | 3,290 | bag | 32,900 ₹38,822 | 32,900 ₹38,822 |
| 1.09 | b) Sand + stone chips(295.47+539.06m3) | 680.39 | m3 | 2,15,683.63 ₹2.5 L | 2,10,920.9 ₹2.5 L |
Tender Value
₹1.5 Cr
EMD Value
₹1.8 L
Closing Date
5 Jan 2026, 5:00 pmClosed
STAFF OFFICER MINING SECL SOHAGPUR
OFFICE OF THE STAFF OFFICER MINING SECL SOHAGPUR
Construction of 161 nos RCC ventilation stoppings in seam VI B in respect of Khairaha UG Mine
2025_SECL_349738_1
SECL/SGP/SO(M)/25-26/NIT-716 dt 19.12.2025
Open Tender
Civil Works - Others
365 days
KHAIRAHA UG MINE
AS PER NIT
8 documents required · 8 mandatory
₹1.8 L
10 Mar 2026
19 Dec 2025
7 Jan 2026
19 Dec 2025
5 Jan 2026
20 Dec 2025
19 Dec 2025 - 31 Dec 2025
General cleaning/house keeping not exceeding 5cm in depth Including disposal of cleaned muck/debris to be stacked upto50m. or to be
Groove cutting for stopping and manhole by chisel/pickaxe and hammer (a)in soft stone (In floor)
(b) In soft stone (In Roof)
(c) In Coal
(RCC) Reinforced cement concrete(1:2:4) In wall/roof ceiling of alr crossing/ stopping (any thickness) in u/g (Excluding,shuttering. rainforcement cutting, bendinR. placing In position and binding etc)
Centring, shuttering, finishing and reinforcement including cutting,bending, placing in position and binding and strutting, prapping etc complete. (6.00 x 3.50x2x16) = 6762.00 m2
6mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material)
Loading of all kind building materials In to tub at Inc. mouth- a) Cement
b) Sand + stone chips(295.47+539.06m3)
c) Steel rod(10 mm)
Un-loading of all kinds of building materlals at destination In UG, a) Cement
b) Sand + stone chips(295.47+539.06m3)
c) Steel rod(10 mm)
Transportaion of material with tramming & pushing coupling & uncoupling with haulages for a distance 01 lead or part there of and bringing the empty tub to the surface a) Cement
b) Sand + stone chips(295.47+539.06m3)
c) Steel rod(10 mm)
Lead for transportation/ carriage of all kinds of building materials by manually (16 m to 30 m)
supply and stacking of material Including cost of material, Transportatlon, Royaity etc. complete (a) Cement
(b)Sand
(C)Stone metal (20 mm)
(d)steel (10 mm)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 1.37 MB
BOQ_362491.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid