| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 CrAccepted-AOC 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | L1 | Accepted-AOC first lowest | |
| 2 | L2₹15.0 Cr+₹21.0 L (1.42%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | l3₹17.0 Cr+₹2.2 Cr (15.0%)Rejected-Finance | l3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical document incomplete | |
| 5 | Rejected-Technical | - | Rejected-Technical document incomplete |
| Sl No | Description | Qty | Unit | M/s Kaiser Construction Engineers and Contractor L2 | VELJI RATNA SORATHIA INFRA PVT. LTD L1 | MSA CONSTRUCTION PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in making sub grade on bed, correcting section from 1:1.4 to 1:1.5 in side slope etc. including soil mixed with Kanker etc. mechanical compaction and dressing properly including intitial lift and lead upto 195 m in disposal area as per direction of Engineer in charge including supply of all materials, labour and T&P etc required for proper completion of work | 25,872 | Cum | 140 ₹36,22,080 | 68.5 ₹17,72,232 Lowest | 163.53 ₹42,30,848.16 |
| 2.00 | Earth work in making Sub grade correcting section from 1:1.4 to 1:1.5 in side slopes etc. with 595 m. lead & all lift including Saturated M.K.R. soil mixed with kanker etc., watering upto 100 m lead for compaction, mechanical compaction and dressing required for proper completion of work as per direction of Engineer-in-charge including supply of all materials, labour, and T&P etc required for proper completion of work | 33,236.64 | Cum | 200 ₹66,47,328 | 135 ₹44,86,946.4 Lowest | 245.64 ₹81,64,248.25 |
| 3.00 | Preparation of sub grade for lining work excluding cost of earth work with labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge including cost of all materials, labour and T&P etc required for proper completion of work. | 93,324 | Sqm | 10 ₹9,33,240 Lowest | 25 ₹23,33,100 | 12.14 ₹11,32,953.36 |
| 4.00 | Providing and laying Porous cement concrete window size 450mm x 450mm x 100mm with 13.2 mm to 20 mm size crushed graded hard sone grit and containing 1:6 proportion (cement: aggregate) including cost of all material, labour and T&P required for proper completion of work including dewatering. | 15.63 | cum | 4,000 ₹62,520 Lowest | 5,000 ₹78,150 | 4,100.76 ₹64,094.88 |
| 5.00 | Providing and laying M-20 Reinforcement cement concrete in sleeper, 200x200mm safely ladders/steps and coping/berm with 13.2mm to 20mm. Size graded hard stone grit and coarse sand including dewatering cost of all material, labour and T&P required for proper completion of work but excluding cost of steel. | 1,697.94 | Cum | 5,400 ₹91,68,876 Lowest | 7,500 ₹1,27,34,550 | 5,716.64 ₹97,06,511.72 |
| 6.00 | Centering and Shuttering for Reinforced concrete work with all lead & lift including proper scaffholding , supplying and applying shuteering oil etc as per direction of engineer in charge including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 18,211.81 | Sqm | 350 ₹63,74,133.5 | 250 ₹45,52,952.5 Lowest | 492.75 ₹89,73,869.38 |
| 7.00 | Providing and Laying steel reinforcement including cutting, bending, binding in position including material, binding wire, labour, T&P etc. (and rates inclusive of wastage) required for proper completion of work as per direction of Engineer-in-charge. | 3,86,082.04 | kg | 59 ₹2,27,78,840.36 Lowest | 68 ₹2,62,53,578.72 | 61.96 ₹2,39,21,643.2 |
| 8.00 | Providing and laying coarse sand in drain and in layers including comapction, dressing etc as per drawing including cost of all material, labour charges and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 16,277.53 | Cum | 2,200 ₹3,58,10,566 | 910 ₹1,48,12,552.3 Lowest | 2,677.51 ₹4,35,83,249.35 |
| 9.00 | Laying R.C.C. M-20 and 100mm. Thick reinforcement cement concrete in lining with 13.2mm & 19mm size graded hard stone grit and coarse sand by pavour machine on bed and side slope with cost of all materials and labour, centering and shuttering T&P required for proper completion of work but excluding cost of steel. | 93,167.7 | Sqm | 619 ₹5,76,70,806.3 Lowest | 800 ₹7,45,34,160 | 660.54 ₹6,15,40,992.56 |
| 10.00 | Supplying and laying P.V.C. seal 150 mm wide and 6 mm thick of aprooved make and quality at joints on sleeper including cost of all materials, labour, T&P etc. required for proper completion of work in the direction of Engineer-in-charge. | 4,797.5 | Rm | 300 ₹14,39,250 | 150 ₹7,19,625 Lowest | 449.89 ₹21,58,347.28 |
Tender Value
Refer Docs
EMD Value
₹39.5 L
Closing Date
26 Dec 2025, 3:30 pmClosed
SE ICC MAHOBA
SE ICC BAZARIYA MAHOBA
C.C. LINING WORK IN VARIOUS FILLING REACHES OF ARJUN FEEDER CANAL
2025_UPIDC_1089572_2
02/SE/2025-26
Open Tender
Civil Works
Item Rate
540 days
MAHOBA
as per tender nit and tender document
2 documents required · 2 mandatory
₹8,614
₹39.5 L
25 Feb 2026
20 Dec 2025
26 Dec 2025
20 Dec 2025
26 Dec 2025
20 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in making sub grade on bed, correcting section from 1:1.4 to 1:1.5 in side slope etc. including soil mixed with Kanker etc. mechanical compaction and dressing properly including intitial lift and lead upto 195 m in disposal area as per direction of Engineer in charge including supply of all materials, labour and T&P etc required for proper completion of work | 25,872 | Cum | 190 | ₹49,15,680 |
| 2 | Earth work in making Sub grade correcting section from 1:1.4 to 1:1.5 in side slopes etc. with 595 m. lead & all lift including Saturated M.K.R. soil mixed with kanker etc., watering upto 100 m lead for compaction, mechanical compaction and dressing required for proper completion of work as per direction of Engineer-in-charge including supply of all materials, labour, and T&P etc required for proper completion of work | 33,236.64 | Cum | 285.4 | ₹94,85,737.06 |
| 3 | Preparation of sub grade for lining work excluding cost of earth work with labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge including cost of all materials, labour and T&P etc required for proper completion of work. | 93,324 | Sqm | 14.1 | ₹13,15,868.4 |
| 4 | Providing and laying Porous cement concrete window size 450mm x 450mm x 100mm with 13.2 mm to 20 mm size crushed graded hard sone grit and containing 1:6 proportion (cement: aggregate) including cost of all material, labour and T&P required for proper completion of work including dewatering. | 15.63 | cum | 4,764.45 | ₹74,468.35 |
| 5 | Providing and laying M-20 Reinforcement cement concrete in sleeper, 200x200mm safely ladders/steps and coping/berm with 13.2mm to 20mm. Size graded hard stone grit and coarse sand including dewatering cost of all material, labour and T&P required for proper completion of work but excluding cost of steel. | 1,697.94 | Cum | 6,641.85 | ₹1,12,77,462.79 |
| 6 | Centering and Shuttering for Reinforced concrete work with all lead & lift including proper scaffholding , supplying and applying shuteering oil etc as per direction of engineer in charge including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 18,211.81 | Sqm | 572.5 | ₹1,04,26,261.23 |
| 7 | Providing and Laying steel reinforcement including cutting, bending, binding in position including material, binding wire, labour, T&P etc. (and rates inclusive of wastage) required for proper completion of work as per direction of Engineer-in-charge. | 3,86,082.04 | kg | 71.99 | ₹2,77,94,046.06 |
| 8 | Providing and laying coarse sand in drain and in layers including comapction, dressing etc as per drawing including cost of all material, labour charges and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 16,277.53 | Cum | 3,110.85 | ₹5,06,36,954.2 |
| 9 | Laying R.C.C. M-20 and 100mm. Thick reinforcement cement concrete in lining with 13.2mm & 19mm size graded hard stone grit and coarse sand by pavour machine on bed and side slope with cost of all materials and labour, centering and shuttering T&P required for proper completion of work but excluding cost of steel. | 93,167.7 | Sqm | 767.45 | ₹7,15,01,551.37 |
| 10 | Supplying and laying P.V.C. seal 150 mm wide and 6 mm thick of aprooved make and quality at joints on sleeper including cost of all materials, labour, T&P etc. required for proper completion of work in the direction of Engineer-in-charge. | 4,797.5 | Rm | 522.7 | ₹25,07,653.25 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.23 MB
TDarjunlining2.pdf
Tender Documents • 6.25 MB
BOQ_2028603.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .