| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 CrAccepted-AOC 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | ₹14.8 Cr | L1 | Accepted-AOC first lowest |
| 2 | L2₹15.0 CrRejected-Finance | ₹15.0 Cr | L2 | Rejected-Finance L2 |
| 3 | l3₹17.0 CrRejected-Finance | ₹17.0 Cr | l3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical document incomplete |
| 5 | Rejected-Technical | - | - | Rejected-Technical document incomplete |
| Sl No | Description | Qty | Unit | M/s Kaiser Construction Engineers and Contractor L2 | VELJI RATNA SORATHIA INFRA PVT. LTD L1 | MSA CONSTRUCTION PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in making sub grade on bed, correcting section from 1:1.4 to 1:1.5 in side slope etc. including soil mixed with Kanker etc. mechanical compaction and dressing properly including intitial lift and lead upto 195 m in disposal area as per direction of Engineer in charge including supply of all materials, labour and T&P etc required for proper completion of work | 25,872 | Cum | 140 ₹36.2 L | 68.5 ₹17.7 L | 163.53 ₹42.3 L |
| 2.00 | Earth work in making Sub grade correcting section from 1:1.4 to 1:1.5 in side slopes etc. with 595 m. lead & all lift including Saturated M.K.R. soil mixed with kanker etc., watering upto 100 m lead for compaction, mechanical compaction and dressing required for proper completion of work as per direction of Engineer-in-charge including supply of all materials, labour, and T&P etc required for proper completion of work | 33,236.64 | Cum | 200 ₹66.5 L | 135 ₹44.9 L | 245.64 ₹81.6 L |
| 3.00 | Preparation of sub grade for lining work excluding cost of earth work with labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge including cost of all materials, labour and T&P etc required for proper completion of work. | 93,324 | Sqm | 10 ₹9.3 L | 25 ₹23.3 L | 12.14 ₹11.3 L |
| 4.00 | Providing and laying Porous cement concrete window size 450mm x 450mm x 100mm with 13.2 mm to 20 mm size crushed graded hard sone grit and containing 1:6 proportion (cement: aggregate) including cost of all material, labour and T&P required for proper completion of work including dewatering. | 15.63 | cum | 4,000 ₹62,520 | 5,000 ₹78,150 | 4,100.76 ₹64,094.88 |
| 5.00 | Providing and laying M-20 Reinforcement cement concrete in sleeper, 200x200mm safely ladders/steps and coping/berm with 13.2mm to 20mm. Size graded hard stone grit and coarse sand including dewatering cost of all material, labour and T&P required for proper completion of work but excluding cost of steel. | 1,697.94 | Cum | 5,400 ₹91.7 L | 7,500 ₹1.3 Cr | 5,716.64 ₹97.1 L |
| 6.00 | Centering and Shuttering for Reinforced concrete work with all lead & lift including proper scaffholding , supplying and applying shuteering oil etc as per direction of engineer in charge including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 18,211.81 | Sqm | 350 ₹63.7 L | 250 ₹45.5 L | 492.75 ₹89.7 L |
| 7.00 | Providing and Laying steel reinforcement including cutting, bending, binding in position including material, binding wire, labour, T&P etc. (and rates inclusive of wastage) required for proper completion of work as per direction of Engineer-in-charge. | 3,86,082.04 | kg | 59 ₹2.3 Cr | 68 ₹2.6 Cr | 61.96 ₹2.4 Cr |
| 8.00 | Providing and laying coarse sand in drain and in layers including comapction, dressing etc as per drawing including cost of all material, labour charges and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 16,277.53 | Cum | 2,200 ₹3.6 Cr | 910 ₹1.5 Cr | 2,677.51 ₹4.4 Cr |
| 9.00 | Laying R.C.C. M-20 and 100mm. Thick reinforcement cement concrete in lining with 13.2mm & 19mm size graded hard stone grit and coarse sand by pavour machine on bed and side slope with cost of all materials and labour, centering and shuttering T&P required for proper completion of work but excluding cost of steel. | 93,167.7 | Sqm | 619 ₹5.8 Cr | 800 ₹7.5 Cr | 660.54 ₹6.2 Cr |
| 10.00 | Supplying and laying P.V.C. seal 150 mm wide and 6 mm thick of aprooved make and quality at joints on sleeper including cost of all materials, labour, T&P etc. required for proper completion of work in the direction of Engineer-in-charge. | 4,797.5 | Rm | 300 ₹14.4 L | 150 ₹7.2 L | 449.89 ₹21.6 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹39.5 L
Closing Date
31 Dec 2025, 3:30 pmClosed
SE ICC MAHOBA
SE ICC BAZARIYA MAHOBA
C.C. LINING WORK IN VARIOUS FILLING REACHES OF ARJUN FEEDER CANAL
2025_UPIDC_1089572_2
02/SE/2025-26
Open Tender
Civil Works
540 days
MAHOBA
as per tender nit and tender document
2 documents required · 2 mandatory
₹8,614
₹39.5 L
25 Feb 2026
20 Dec 2025
31 Dec 2025
20 Dec 2025
31 Dec 2025
20 Dec 2025
Earth work in making sub grade on bed, correcting section from 1:1.4 to 1:1.5 in side slope etc. including soil mixed with Kanker etc. mechanical compaction and dressing properly including intitial lift and lead upto 195 m in disposal area as per direction of Engineer in charge including supply of all materials, labour and T&P etc required for proper completion of work
Earth work in making Sub grade correcting section from 1:1.4 to 1:1.5 in side slopes etc. with 595 m. lead & all lift including Saturated M.K.R. soil mixed with kanker etc., watering upto 100 m lead for compaction, mechanical compaction and dressing required for proper completion of work as per direction of Engineer-in-charge including supply of all materials, labour, and T&P etc required for proper completion of work
Preparation of sub grade for lining work excluding cost of earth work with labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge including cost of all materials, labour and T&P etc required for proper completion of work.
Providing and laying Porous cement concrete window size 450mm x 450mm x 100mm with 13.2 mm to 20 mm size crushed graded hard sone grit and containing 1:6 proportion (cement: aggregate) including cost of all material, labour and T&P required for proper completion of work including dewatering.
Providing and laying M-20 Reinforcement cement concrete in sleeper, 200x200mm safely ladders/steps and coping/berm with 13.2mm to 20mm. Size graded hard stone grit and coarse sand including dewatering cost of all material, labour and T&P required for proper completion of work but excluding cost of steel.
Centering and Shuttering for Reinforced concrete work with all lead & lift including proper scaffholding , supplying and applying shuteering oil etc as per direction of engineer in charge including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Providing and Laying steel reinforcement including cutting, bending, binding in position including material, binding wire, labour, T&P etc. (and rates inclusive of wastage) required for proper completion of work as per direction of Engineer-in-charge.
Providing and laying coarse sand in drain and in layers including comapction, dressing etc as per drawing including cost of all material, labour charges and T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Laying R.C.C. M-20 and 100mm. Thick reinforcement cement concrete in lining with 13.2mm & 19mm size graded hard stone grit and coarse sand by pavour machine on bed and side slope with cost of all materials and labour, centering and shuttering T&P required for proper completion of work but excluding cost of steel.
Supplying and laying P.V.C. seal 150 mm wide and 6 mm thick of aprooved make and quality at joints on sleeper including cost of all materials, labour, T&P etc. required for proper completion of work in the direction of Engineer-in-charge.
Making construction joint painting with primer and filling with sealing compound including cost of all material, labour and T&P etc. required for proper completion of work in the direction of Engineer-in-charge.
Painting on top of sleeper with bitumen including cost of all material, fuel for heating, labour and T&P etc. required for proper completion of work in the direction of Engineer-in-charge.
Providing and fixing 50 mm Dia. PVC pipe in sleeper at 5 m C/C in panels including cost of all materials, labour and T&P etc. complete. in the direction of Engineer-in-charge.
Providing and Laying 200 micron thick L.D.P.E. film to cover the Surface Area under the Lining including all cost of material, Labour, T&P etc. for proper completion of work in the direction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.23 MB
TDarjunlining2.pdf
Tender Documents • 6.25 MB
BOQ_2028603.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid