Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.8 LAccepted-AOC | L1 | Accepted-AOC Qualified in AOC | |
| 2 | L2₹32.1 L+₹3.3 L (11.4%)Rejected-AOC NO 14 48 PILLAIYAR KOVIL STREET CHEYYUR TALUK PERUMBAKKAM CHENGALPATTU 603 302 | CHENGALPATTU | TAMIL NADU | 603302 | L2 | Rejected-AOC Qualified in AOC | |
| 3 | L3₹32.1 L+₹3.4 L (11.7%)Rejected-AOC | L3 | Rejected-AOC Qualified in AOC | |
| 4 | L4₹33.2 L+₹4.4 L (15.3%)Rejected-AOC | L4 | Rejected-AOC Qualified in AOC | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | R.SARANGAPANI L1 | K.ANBU L4 | V.DHEENATHAYALAN L3 | ARUNKUMAR ENGINEERING WORKS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Name of Work:Pot hols and patches work ECR to Paramankenikuppam (Via) Canal Road (Km0/0-3/100) @ Paramankeni Pannchayat in Lathur Panchayat Union. | |||||||
| 2.00 | Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete | 3,720 | m3 | 5.5 ₹20,460 Lowest | 9 ₹33,480 | 6.3 ₹23,436 | 6 ₹22,320 |
| 3.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | |||||||
| 4.00 | Km 0/0 - 1/0 | 1.5 | m3 | 3,970.84 ₹5,956.26 | 3,970 ₹5,955 Lowest | 3,970 ₹5,955 Lowest | 3,970.84 ₹5,956.26 |
| 5.00 | Km 1/0 - 2/0 | 1.76 | m3 | 3,980.92 ₹7,006.42 | 3,980 ₹7,004.8 Lowest | 3,980 ₹7,004.8 Lowest | 3,980.92 ₹7,006.42 |
| 6.00 | Km 2/0 - 3/0 | 0.63 | m3 | 3,991 ₹2,514.33 | 3,990 ₹2,513.7 Lowest | 3,990 ₹2,513.7 Lowest | 3,991 ₹2,514.33 |
| 7.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | |||||||
| 8.00 | Km 0/0 - 1/0 | 1.08 | m3 | 4,653.84 ₹5,026.15 | 4,653 ₹5,025.24 Lowest | 4,653 ₹5,025.24 Lowest | 4,653.84 ₹5,026.15 |
| 9.00 | Km 1/0 - 2/0 | 0.45 | m3 | 4,663.92 ₹2,098.76 | 4,663 ₹2,098.35 Lowest | 4,663 ₹2,098.35 Lowest | 4,663.92 ₹2,098.76 |
| 10.00 | Km 2/0 - 3/0 | 0.76 | m3 | 4,674 ₹3,552.24 Lowest | 4,674 ₹3,552.24 Lowest | 4,674 ₹3,552.24 Lowest | 4,674 ₹3,552.24 Lowest |
Tender Value
₹32.8 L
EMD Value
₹33,000
Closing Date
22 Oct 2025, 3:00 pmClosed
The Block Development Officer BP
Panchayat union office Building Lathur at Pavunju
Road maitenace Policy for Village 7 Nos of paramankeni, nedumaram, vadapattinam, perumbakkam, cheyyur, koovathur,Veerabogam in panchayat Panchayat in Lathur Panchayat Union..
2025_RDTN_614304_1
Tender Notice No . 120/2024/CDP- dt.24.07.2024
Open Tender
Civil Works
Item Wise
Road maitenace Policy for Village 7 Nos of parama
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹33,000
Yes
4 Nov 2025
15 Oct 2025
22 Oct 2025
15 Oct 2025
22 Oct 2025
15 Oct 2025
Amount
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 25mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 25mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
GST Amount for providing Service to Government Contract Works for the above Construction Works.{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ARUNKUMAR ENGINEERING WORKS (BID ID -1492408)
V.DHEENATHAYALAN (BID ID -1491977)
K.ANBU (BID ID -1492437)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Technical.pdf
Tender Documents • 0.85 MB
BOQ_733981.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .