| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹99.4 L+₹2.6 L (2.66%)Rejected-AOC GANDHI NAGAR DISTRICT MAHOBA UTTAR PRADESH | MAHOBA | UTTAR PRADESH | 210421 | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.0 Cr+₹3.6 L (3.75%)Rejected-AOC ADHA JALLIM MAINPURI PHATAK ETAWAH | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Documents incomplete | |
| 5 | Rejected-Technical ETAWAH | UTTAR PRADESH | 206001 | - | Rejected-Technical Documents incomplete |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
26 Feb 2019, 11:00 amClosed
SE ICC MAHOBA
Office of the SE ICC, BAJARIYA MAHOBA
EARTH WORK AND PUCCA WORK OF KHAIR MINOR FROM 0.00 TO 2.000 AT KABRAI MAIN CANAL (LOT-09)
2019_UPIDC_311539_9
12/SE/2018-19
Open Tender
Civil Works
Item Rate
90 days
MAHOBA
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
EE IRRIGATION CONSTRUCTION DIVISION
₹2.0 L
Yes
Office of the SE ICC, BAJARIYA MAHOBA
21 Oct 2021
18 Feb 2019
26 Feb 2019
18 Feb 2019
26 Feb 2019
18 Feb 2019
20 Feb 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/W in filling in MKR and Kankar mixed soil with lead up to 1 km including mechanical compaction, watering, leveling & dressing with required for proper completion of work etc. including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/W in cutting in MKR and Kankar mixed soil with initial lead & given lift including labour T&P required for proper completion of work etc. including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/W Excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supplying & laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying C.C. 1:2:4 in Top of stone masonry with all cost of sand, cement & stone ballast T&P etc required for completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying C.C. 1:3:6 in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
R.C.R. stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc. required for completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying R.C.C. 1:1.5:3 in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Steel reinforcement for R.C.C. work including cutting, bending , binding with G.I. wire and placing in position with cost of steel reinforcement. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Cement pointing 1:2 cm on stone masonry all cost of material, labour, T&P etc required for completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Centering & shuttering for R.C.C. work with all cost of labour material T&P etc. required for completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying and fixing joint filler bond 20mm including cost of sealing compound labour, T&P etc required for proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & Fixing drainage spout pipe of G.I. 100 mm dia including cost of labour T&P etc required for proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & Fixing wheel guard including cost of labour T&P etc required for proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/W in back filling with all cost of labour, material, T&P etc with proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Dry stone pitching with all cost of labour material T&P etc. required for completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
M/s Trivedi Associates
SHAILENDRA SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .