| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER L1 | |
| 2 | L2₹11.2 L+₹1.1 L (10.6%)Rejected-Finance LAKSHMI NAGAR CHINDWARA ROAD SAWNER DISTRICT NAGPUR 441107 | NAGPUR | MAHARASHTRA | 441107 | L2 | Rejected-Finance REJECTED | |
| 3 | L3₹12.1 L+₹2.0 L (20.1%)Rejected-Finance PLOT NO 244 NUTAN SEVAKRAM KHANDAIT WARD NO 3 PO SAONER DISTRICT NAGPUR 441107 | NAGPUR | MAHARASHTRA | 441107 | L3 | Rejected-Finance REJECTED | |
| 4 | L4₹14.2 L+₹4.1 L (40.1%)Rejected-Finance HOUSE NO 475 BRAMHANI NEAR HANUMAN MANDIR ROAD NO 3 KALMESHWAR DISTRICT NAGPUR 441501 | NAGPUR | MAHARASHTRA | 441501 | L4 | Rejected-Finance REJECTED | |
| 5 | L5₹15.1 L+₹5.0 L (49.4%)Rejected-Finance LAKSHMI NAGAR CHHINDWARA ROAD SAONER NAGPUR M H | L5 | Rejected-Finance REJECTED |
Tender Value
₹18.8 L
EMD Value
₹23,500
Closing Date
7 Jun 2024, 6:00 pmClosed
STAFF OFFICER CIVIL WCL NAGPUR AREA
OFFICE OF THE AREA GENERAL MANAGER NAGPUR AREA PO KASTURBA NAGAR JARIPATKA NAGPUR NAGPUR 440014
Connecting approaches from new weighbridge to existing concrete road and repair of RCC culvert at B.G siding at Saoner Sub Area.
2024_WCL_308899_2
na3250-civ-e-tender 17-2024-25
Open Tender
Civil Works - Others
Item Rate
60 days
SAONER SUB AREA OF NAGPUR AREA
AS PER NIT
3 documents required · 3 mandatory
₹23,500
12 Feb 2025
23 May 2024
10 Jun 2024
24 May 2024
7 Jun 2024
24 May 2024
23 May 2024 - 1 Jun 2024
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Plant Mix Method for grading-I Material
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-30 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but including cost of steel in dowel bar and tie rods etc.
Supplying and filling in plinth with Jamuna sand under floors including, watering, ramming consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:3:6 ( 1 Cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level:1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Hot rooled deformed bars
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
supplying hard murum/kankar at the road site,including conveying and stacking complete.
Spreading hard murum/ soft murrum/ gravel or kankar for side width complete
Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete.
Total impact of GST for the purpose of CTC
M/s Purushottam kisanlal kamale
GANESH ENTERPRISES
B R Hulde
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_320083.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .