| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAccepted-Finance C 21 SUSHANT LOK 3 SECTOR 57 122001 | GURUGRAM | HARYANA | 122001 | ₹5.5 Cr | L1 | Accepted-Finance Qualify |
| 2 | L2₹5.5 Cr+₹1.5 L (0.27%)Accepted-Finance | ₹5.5 Cr+₹1.5 L (0.27%) | L2 | Accepted-Finance Qualify |
| 3 | L3₹5.7 Cr+₹19.5 L (3.57%)Accepted-Finance | ₹5.7 Cr+₹19.5 L (3.57%) | L3 | Accepted-Finance Qualify |
Tender Value
₹5.8 Cr
EMD Value
₹11.5 L
Closing Date
23 Dec 2019, 5:00 pmClosed
Executive Engineer
Executive Engineer, Provincial Division, PWD BandR Br., Palwal
SR by Improvement of Palwal Jewar Aligarh Road ID 3500 Km. 3.06 to 15.66 in Palwal Distt.
2019_HRY_112528_1
PWD/Palwal/211120
Open Tender
Civil Works - Roads
Works
180 days
Palwal
As per Approved DNIT
3 documents required · 3 mandatory
₹20,000
Executive Engineer, Provincial Division, PWD BandR
₹11.5 L
Palwal
11 Jan 2020
12 Dec 2019
24 Dec 2019
12 Dec 2019
23 Dec 2019
12 Dec 2019
12 Dec 2019 - 23 Dec 2019
16 Dec 2019
Amount
Civil Works
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9.Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Dismantling of existing bituminous layer on road by cold milling machine in 25mm thickness in full width from Km. 0.280 to 1.220 and planning the surface after cold milling. The dismantled bituminous material shall be property of agency. Note:- The quantity of dismantled bituminous material shall be considered minimum 80% of the theoretical volume and the same shall be recovered as per recovery item No.11 of the DNIT.
Providing and laying Bituminous tack coat of Bitumen grade (VG-10) using 2.00 Kg per 10 Sqm area on existing Bituminous surface complete in all respect including cost of Bitumen (VG-10) as per clause No.503 of MORT&H specification for road and bridge works (5th revision of 2013/latest edition. Instruction issued from time to time regarding bitumen VG-10 will be followed strictly.
Providing & Laying 50mm thick compacted Dense Bituminous Macadam (DBM) in one layer with 80-100 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth sheeled, vibrator and tendem rollers to achieve the desired compaction as per clause No. 505 and 113.3 of MoRT&H specification for road and bridge works (5th Revision) of 2013/latest edition using minimum 4.50% bitumen grade (VG-30) as binder content by weight of total mix, complete in all respect including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver finisher fitted with electronic sensor device conforming to MoRT&H specification is mandatory. If bitumen required more than 4.50% as per Job Mix Formula no extra payment will be made, extra bitumen required will be considered as incidental to work.
Providing & Laying 40mm thick compacted thickness of Bituminous Concrete (BC) in one layer with 80-100 TPH batch type hot mix plant and with bituminous binder VG-40 @ 5.4% (Minimum) and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory or with pneumatic tyred roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPA and tandem rollers to achieve the desired compaction as per MoRT&H specification (5th Revision) 2013 clause No.507 complete in all respect. If bitumen required is more than 5.4% as per job mix formula no extra payment will be made, Extra bitumen required will be considered as incidental to work. Thickness of BC laid over the existing black top surface is to be adjusted in such a manner that a camber of 2.5% is achieved. Any extra quantity over and above the quantity provided in the DNIT, required to achieve 2.5% camber shall be incidental to work. Note: - Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in Table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing anti-skid surface with bitumen pre coated fine grained hard stone chipping of 13.2mm nominal size at the rate of 0.005 cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 100 C, protruding 1 mm to 4mm over mastic surface, all complete as per clause 515.
Providing and marking centre line / side line 2.5 mm thick (minimum) and other markings as per drawing and direction of Engineer in Charge with hot applied thermoplastic road marking paint 10cms wide (Centre line) / 15 cm wide (Edge line) complete in all respects as per the dimensions given in IRC 35, furnishing all labour, materials, tools, equipments including all incidental costs necessary for carrying out in work at site conforming to the technical specification as clause No. 803 of MORT&H specification for road & bridge works ( 5th revision) of 2013/latest edition.Each container of the thermoplastic paint material shall have the name, trademark or other means of identification of manufacturer, batch number, date of manufacture, color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian paint – Apemark/Berger-Sigmare/Prismo. The glass beads shall be of Potters / Sovitec / Flexolite.The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The Contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material showing all tests specified and shall certify that the material meets all requirements of the specifications. The Reflextorizing Glass Beads shall meet the requirements of clause-803.4.2 and test methods mentioned in clause – 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads. The method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (Part-3).
Reinforced Cement Concrete 1:2:4 studs of standard design, fixed in position, i/c finishing with exterior paint & primer coat & one 100mm wide retro reflective prismatic band consisting of 3mm ACP having high intensity micro prismatic sheeting confirming to IRC: 67:2012 on it duly fixed with 5 numbers 2” long screws with roller plug complete in all respect as per drawing attached with DNIT
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M)
Providing & fixing retro reflective hazard marker confirming to IRC79: 1981 of size 900 x 300 mm with back support of M. S. angle 25 x 25 x 3 mm and post of 50 x 50 x 5 mm, 1500 mm high embedded into 0.3 x 0.3 x 0.3 m M20 grade concrete as per site requirements, using non-metallic micro-prismatic retro reflective sheet confirming to IRC: 67-2012 type XI specification fixed on 3 mm thick aluminium composite. Material sheet as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides. Drawing attached at page No.137 of DNIT
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Providing and installing shoulder mounted direction signage of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC-67-2012 type IV, HIP specification fixed on 3 mm thick Aluminium composite panels as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides supported on single or two nos, Mild steel pipe post 80 mm NB medium class 4 mm thick embedded in M-20 grade concrete foundation of size (450 mm X 450 mm X 600 mm) / (600 mm X 600 mm X 750 mm) complete as per drawings Technical specification and as directed by Engineer-in-Charge. Size 1200 X 900mm
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can use in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Mixed Bituminous Material @1300/-Each Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
THE DEV COOP. L AND C SOCIETY LTD.
S K Mittal
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .