| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC HOUSE NO R17 ADARSH COLONY NEARBY MULLAH HOTEL NIT FARIDABAD 121001 | FARIDABAD | FARIDABAD | HARYANA | 121001 | ₹1.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 L+₹1,674.19 (1.27%)Rejected-AOC UMRAO COLONY UNCHA GAON ROAD NEAR ARJUN CHACCHI BALLABGARH | BALLABGARH | ₹1.3 L+₹1,674.19 (1.27%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.5 L+₹18,499.71 (14.0%)Rejected-AOC | ₹1.5 L+₹18,499.71 (14.0%) | L3 | Rejected-AOC L3 |
Tender Value
₹1.7 L
EMD Value
₹3,340
Closing Date
26 Mar 2026, 6:55 pmClosed
Sandeep Dahiya
DIV Palwal
HEW 67 Construction of new manhole near plot No. 1740, 2302 and 2266 and repair of manhole in front of various plot as and when required and all other works contingent thereto
2026_HBC_509762_1
20269BACB368 1DE1 42C4 BF95 0CDB944BF080251HSV
Open Tender
Civil Works
Works
30 days
Faridabad (MC)
as per dnit
2 documents required · 2 mandatory
₹250
₹3,340
Yes
6 Apr 2026
19 Mar 2026
27 Mar 2026
19 Mar 2026
26 Mar 2026
19 Mar 2026
19 Mar 2026 - 21 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.11.2]12 mm cement plaster finished with a floating coat of neat cement of mix : 2. 1:4 (1 cement: 4 fine sand) | - | Sqm | 135 | - |
| 2 | [15.1.1.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 1.1. Manual Means
Depth up to 3 m | - | cum | 154 | - |
| 3 | [21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge | - | Each | 298 | - |
| 4 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening | - | Each | 1,155 | - |
| 5 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | - | cum | 2,442 | - |
| 6 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | - | cum | 6,113 | - |
| 7 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | - | Sqm | 208 | - |
| 8 | [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg. | 68 | - |
| 9 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | - | cum | 4,128 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_588566.xls
BOQ • 0.35 MB
FXAEC9Z155752.pdf
Additional Documents • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .