| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹60.6 LAccepted-AOC KULAD BANARPAL KULAD KULAD NALCONAGAR ANGUL ODISHA 759145 INDIA | ANUGUL | ODISHA | 759145 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹60.6 L+₹1.99 (<0.01%)Rejected-AOC | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹63.4 L+₹2.8 L (4.65%)Rejected-AOC | L-3 | Rejected-AOC L-3 | |
| 4 | L-4₹63.8 L+₹3.2 L (5.32%)Rejected-AOC | L-4 | Rejected-AOC L-4 | |
| 5 | L-5₹65.5 L+₹4.9 L (8.02%)Rejected-AOC | L-5 | Rejected-AOC L-5 |
Tender Value
Refer Docs
Closing Date
24 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr. P.K. PANDA
DGM MECHANICAL, TnC DEPARTMENT, SMELTER PLANT, NALCO, NALCONAGAR, ANGUL, ODISHA
Construction of RCC Lift Well for FTP 5, 6, 7 and 8 inside Smelter Plant.
2022_NALCO_667203_1
OMC-5472
Limited
Civil Works
Item Rate
240 days
INSIDE SMELTER PLANT NALCO ANGUL
Not applicable
6 documents required · 6 mandatory
₹0
Exempted
16 Feb 2022
8 Jan 2022
28 Jan 2022
8 Jan 2022
24 Jan 2022
8 Jan 2022
120 days
Amount
Demolishing of brick work manually / by mechanical means including stacking of serviceable material at designated place and disposal of unserviceable material .
Demolishing plain cement concrete manually/ by mechanical means including disposal of material.
Demolishing RCC work manually/ by mechanical means including stacking of steel bars at designated place and disposal of unserviceable material.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead.
Earth work in excavation in all kinds of soils up to 1.5 mtr depth including soft rock, weathered rock, disintegrated rock, mud and shush etc. in foundations, trenches, drains, pavements, manholes, wall footings, pipelines, cable trenches, pits etc. including all labours, materials, dressing of sides, levelling, grading, and ramming of bottoms, pumping and bailing out of rain and sub-soil waters, disposal of stacked surplus excavated materials within a lead of 100 mtrs, providing temporary supports to existing service lines like water pipes, sewerage, electrical cables, including shoring and strutting etc. all complete.
Earth work in all kinds of soil as described in item No.5 for depth beyond 1.5mtr in excavation / banking excavated or stacked materials.Extra for every additional lift of 1.5mtr above item No-5
Back filling with available excavated earth excluding rock in trenches, plinth, sides of foundation in layers not exceeding 200mm in depth consolidating earth deposited in layers by ramming and watering lead up to 100 mtrs., all complete as per specification.
Disposal of surplus earth, debris etc. from construction area to demarcated areas inside the plant boundary limits within a lead of 2 KMs including transportation, loading, unloading, laying at all depth and heights, spreading, levelling etc. after disposal all complete as per specifications and direction of Manager-in-charge.
Supplying and filling sand of approved quality under floors, in foundations and plinth including cost of sand transportation, for all leads, loading and unloading, spreading in layers of 100mm-200 mm loose thickness at all depths, watering, ramming, compacting all complete as per specification and directions of Manager-in-Charge.
Providing and laying plain cement concrete 1:4:8 (1 cement:4 sand:8 aggregate) with 40mm and down size graded stone aggregate as leveling course in foundation under slab, footing etc. including tamping, levelling, curing, shuttering etc. complete for all depths and heights. (Cement free issue)
Providing and laying plain cement concrete 1:2:4 (1 cement:2 sand:4 aggregate) with 20mm and down size graded stone aggregate as leveling course in foundation under slab, footing etc. including tamping, levelling, curing, shuttering etc. complete for all depths and heights. (Cement free issue)
Providing & laying reinforced cement concrete of grade M-20 (excluding cost of steel reinforcement and shuttering) with 20mm and down size approved graded hard stone aggregate in sub structure and super structure for all types of structures such as raft, pavement, columns, lintels, chajja, beams, suspended floors, roof slabs, stair case, walls etc at all heights of the lift structure and depths including compacting, curing, finishing to give a smooth and even surface all complete as per specifications and directions of Manager-in-charge. (Cement free issue)
Placing in position high yield deformed bars reinforcement for RCC work including straightening, cleaning, decoiling, cutting, bending to required shape, binding with contractors own 16 SWG black soft annealed binding wire and placing with proper cover blocks, supports, chairs, spacers etc. at any height above from the ground levels of the lift structure, complete as per specifications & directions of Manager-in-charge. (Tor steel free issue)
Providing and fixing form work centring and shuttering with shuttering ply wood, steel scaffolding at all height of the lift structure for all type of RCC work such as plinth beam, column, wall, below & above plinth beam, raft & any mass concreting below plinth beam at any depth etc. including strutting, bracing, propping and keeping the same in position during concreting and removing the same after specified period as per specifications including keeping necessary provision for inserts and providing dowels etc. all complete as per specifications and directions of Manager-In-Charge.
Brick work in foundation & plinth with fly ash bricks in cement mortar 1:6 (1 cement : 6 coarse sand) etc. complete as per specifications and directions of Manager-in-charge.(Brick shall be issued as FIM at CPP ) (cement as FIM)
Brick work in super structure with fly ash bricks with cement mortar 1:6 (1 cement:6 coarse sand) above plinth level up to any height of the lift structure etc. complete as per specifications and directions of Manager-in-charge. (Brick shall be issued as FIM at CPP ) (cement as FIM)
Providing 6mm thick cement plaster 1:3 (1 cement: 3 fine sand) complete as per direction of EIC at all height of lift structure. (cement as FIM)
Providing 12mm thick cement plaster in cement mortar 1:6 (1 cement: 6 fine sand) etc. all complete as per directions of EIC at any height of lift structure. (cement as FIM)
Providing 15mm thick cement plaster 1:6 (1 cement: 6 fine sand) on therough side of single or half brick wall as per directions of EIC at any height of lift structure. (cement as FIM)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : New work (two or more coats) over and including water thinnable priming coat with cement primer
Providing and applying two or more coats of weather proof paint APEX ULTIMA of Asian Paints to a smooth and even finish including cleaning and scrapping of surface to be painted with wire brush, after cleaning filling the surface imperfection such as holes, dents, cracks by using mixture of white cement and fine sand (1:3), one coat of Asian paints exterior primer and scaffolding, labour, tools and tackles etc. all complete as per specification and direction of Manager-in-charge.
Fabricating, erecting in position and testing / examining, bolted & welded structural steel work at all levels including all built up sections / compound sections made out of rolled sections, steel pipes and plates in trusses, purlins, wind ties, wind girders, columns, strengthening columns, structures etc. portals, racks frame works, crane gantries, surge girders, bracing, floors beams, lifting beams, monorails, platforms, staircases (including chequered plates and grating) ladders, stoppers, brackets, side runners, sag rods, supports for equipments & technological accessories and process piping hand railing posts conveyer gantries, trestles towers junction houses etc. including transporting the structural steel from owner storage / issue points to site workshop site of work cutting to required size straghtening if required edge preparation preheating, bolting / welding of joints finishing edges by grinding fixing in line and level
Supplying & Applying priming coat With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work
Painting two or more coats with synthetic enamel paint of approved brand and manufacturer to give an even shade for new work.
40mm thick cement concrete flooring 1:2:4 (1 cement:2 sand: 4 graded stone aggregate of 20/12.5mm nominal size) finished with floating coat of neat slurry rounding of edges and providing and fixing of 40mm x 4mm thick glass strips for panels as per and specification curing etc. complete. (Cement free issue)
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3 mm M.S. gusset plates at the junctions and corners,all necessary fittings complete, including applying a priming coat ofapproved steel primer.10.5.1 Using M.S. angles 40x40x6 mm for diagonal braces
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .