Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49,000Accepted-AOC 12 MANAULI HOUSE AMBALA CITY 134003 HRY | AMBALA CITY | AMBALA | HARYANA | 134003 | L1 | Accepted-AOC LOWEST QUOTED | |
| 2 | L2₹2.7 L+₹2.2 L (451.0%)Rejected-AOC 403 GH MANSADEVI COMPLEX PANCHKULA 134109 HARYANA | PANCHKULA | HARYANA | 134109 | L2 | Rejected-AOC OTHER THAN LOWEST QUOTED | |
| 3 | Rejected-Technical | - | Rejected-Technical Due to non submission of reqd documents of enlistment criteria in MES of Class E, Cat d(vii). Therefore, it is requested to approach HQ CWE (AF) Jammu. Ref Technical Evaluation Summary. |
Tender Value
Refer Docs
Closing Date
3 Feb 2020, 6:00 pmClosed
GE (AF) Udhampur
GE (AF) Udhampur
Provn of Electrical Energy Audit for FY 2019-20 at Air Force Station Udhampur.
2020_MES_318644_1
3008/Q/30/E3
Open Tender
Job Works
Works
30 days
GE (AF) Udhampur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
1 Sept 2020
27 Jan 2020
5 Feb 2020
27 Jan 2020
3 Feb 2020
27 Jan 2020
Amount
(a) Complete survey of the entire electrical distribution networks starting frommain receiving station 11 KV (MRS) including complete Stn area to include survey of the facility/plant and their current energy consumption pattern and submit in form of a comprehensive survey report. (b) Checking the strength of primary/secondary aspects, insulation level power efficiency and power factor. (c) Bench marking of energy performance and matching of energy use to the requirement, way to maximum system efficiencies, optimizing the input energy requirement etc. (d) Target to achieve energy cost reduction and identify energy conservation technologies, retrofits energy audit procedure and aligning current consumption with current industry benchmarks. (e) Investigating the existing system to boring out basic five aspects as given below:- (i) How much energy is being consumed? (ii) How is energy being consumed? (iii) What is the energy being consumed? (iv) When is energy being consumed? (v) What is quality of the energy consumed? (f) Given recommendation on the basic of the survey report to include cost effective measures to optimize energy resources and methods to achieve maximum energy efficiency of all assets along with BOQ/financial evaluation/specifications/ approved brand etc so to aid in preparation of DPR and conclusion of contracts in near future. Note:- Area covered by electrical energy audit:- (i) Complete energy distribution network showing sub station with all distribution transformers. (ii) Complete analysis of electrical parameters i.e Voltage current frequency, power factor etc. (iii) Health status of all electrical measuring/ controlling and tripping system of MRS. (g) Details of electrical assets is attached as Appx ‘A’ however the firm interested to bid for the subject work is expected to clear the aspects regarding total assets once again from GE before submitting the bid and no representation in this regards at the later stage will be entertained. (h) The energy audit will be deemed to considered complete on successful submission of:- (j) Survey report to include specific recommendations on each aspect as brought out above along with BOQ’s-05 copies, duly recommended by GE. (k) Full payment against same will be released on completion of Job. (l) Only approved energy audit firm will be eligible.
EESSI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .