Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.8 L
EMD Value
₹38,300
Closing Date
8 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EEMI MAHOBA
EEMI MAHOBA
Name of Work ,Lot No. 1 , Repair Checkdam Of ,Lohari Check Dam ,Lohari ,Charkhari
2026_UPMID_1211991_1
582/MI/LEKHA/2026-27 dt 12.11.2026
Open Tender
Civil Works
Percentage
MAHOBA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
EEMI MAHOBA
₹38,300
Yes
25 Nov 2026
25 Nov 2026
9 Dec 2026
25 Nov 2026
8 Dec 2026
25 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling work i/c all complete.SOR IrrIgation SNo. 6.12 | 19.89 | Cum | 305 | ₹6,067.79 |
| 2 | Earth work in excavation in markabar & kanker mixed saturated soil with 10 Lift. ID S.O.R. 4.16 | 20.2 | Cum | 115.6 | ₹2,334.66 |
| 3 | C. C. with 1:3:6 Cement, Sand and Stone gritt of 20 to 40 mm including the cost of materials and labour etc. required for proper completion of work. | 5.27 | Cum | 4,847.3 | ₹25,567.08 |
| 4 | R.C.R. stone masonry work in 1:4 cement sand mortar including the cost of materials labours etc. required for proper completion of work. | 26.59 | Cum | 5,462.58 | ₹1,45,240.06 |
| 5 | R.R.Stone Masonary with Hard stone Boulder in Cement, Coarse sand mortar i/c all Complete. | 1.58 | Cum | 4,416.38 | ₹6,995.54 |
| 6 | C.C. with 1:2:4 Cement, sand and Stone Grit of 10 to 20 mm including the cost of materials & labour etc. required for proper completion of work | 24.18 | Cum | 5,749.52 | ₹1,39,043.64 |
| 7 | 1:2 Cement Sand mortor Plaster on stone masonary including the cost of material labour etc. required for completion of work | 32.99 | Sqm | 258.36 | ₹8,522.51 |
| 8 | Channelization of River/ Nala Bank U/S Both Bank. | 316 | Cum | 95.2 | ₹30,082.82 |
| 9 | DEWATERING DURING CONSTRUCTION OF CHEAKDAM BY 8.00 H. P. DIESEL PUMP SET. | 75 | HOURS | 359.2 | ₹26,940 |
| 10 | Less Cleaning old Material | 5.97 | Cum | 1,380.13 | ₹8,237.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.55 MB
BOQ_2304419.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .