| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.9 Craccepted-aoc | ₹1.9 Cr | accepted-aoc |
Tender Value
₹2.9 Cr
EMD Value
₹2.9 L
Closing Date
11 May 2026, 3:00 pmClosed
Chief Engineer, HMDA
7th floor, East Wing, Swarnajayanthi Commerical Complex, Ameerpet-500038
Construction of Compound wall and fencing work for Layout open spaces at Thorrur (V), Abdullapurmet (M), R.R Dist.
697267
HMDA/DEV/CE/02/02/2026-27, Date: 23.04.2026
OPEN
Civil Works
RANGAREDDY
1 document required · 1 mandatory
₹10,118
₹2.9 L
26 May 2026
27 Apr 2026
27 Apr 2026
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B and as directed by Engineer in charge. (APSS 308). Ordinary soils-Mechcanical Means-Upto 3 m depth. For Chain Link Fencing Work
Plain Cement Concrete (1:5:10) proportion by machine mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Granite macine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as machine mixing, laying and ramming concrete in 150mm layers , finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed as directed by Engineer in charge. (APSS No. 402). For Chain Link Fencing Work.
Plain Cement Concrete (M 20) by machine mix (cement: fine aggregate: Coarse aggregate) using 40mm and down size Hard Granite macine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as machine mixing, laying and ramming concrete in 150mm layers , finishing top surface, curing concrete, etc., complete for finished item of work and as directed by Engineer in charge. (APSS No. 402) For Chain Link Fencing Work.
Painting to new walls with 2 coats of ready mixed oil bound washable distemper of approved brand and shade over a base coat of appropriate primer of approved brand making 3 coats in all to give an even shade after thorough brusing the surface to remove all the dirt and remains of loose powdered material including cost and conveyance of all materials to work site and all operational, incidental labour charges etc complete for finished item of work and as directed by Engineer in charge. For Chain Link Fencing Work.
Manufacturing ,Supply , mouldimg,welding, Fabrication, Errection and Fixing of angular posts 75 X 75 X 5 mm at an espacement of 2.70 mts and bending goose neck 45 angle (0.45m height) with horizontal ties with MS angles 45 X 45 X 5 mm at top of 3.0 m length and welding th hold fast, as per the drawing including Nut and bolts, including Labour charges for fabricating steel works like Compound Wall Grills including cost of welding rods,Labour charges for fixing Grills in position power charges, cost and conveyance of all materials , allowances Complete for finished item of work and as directed by Engineer in charge. For Chain Link Fencing Work.
Manufacturing ,Supply, Fabrication,Errection and Fixing of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC Coated - 2½"x2½" (63 mm x 63 mm) - 8 Gauge including Labour charges for fixing in position power charges, cost and conveyance of all materials Complete for finished item of work and as directed by Engineer in charge. For Chain Link Fencing Work.
Supply and fixing of Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type A - IOWA Type Designation 2 as per standard specification including Labour charges for fixing in position power charges, cost and conveyance of all materials. Including lead and lift charges, contractor profit and overhead charges etc., complete for finished item of work and as directed by the Engineer-in-charge.For Chain Link Fencing Work.
Painting to New iron work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer of red oxide after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work and as directed by Engineer in charge. (3 coats) (APSS No. 1201 & 1212). in All Floors. For Chain Link Fencing Work.
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B and as directed by Engineer in charge. (APSS 308). Ordinary soils-Mechcanical Means-Upto 3 m depth For Construction of Compound wall.
Plain Cement Concrete (1:5:10) proportion by machine mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Granite macine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as machine mixing, laying and ramming concrete in 150mm layers , finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed as directed by Engineer in charge. (APSS No. 402) For Construction of Compound wall.
Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work and as directed by Engineer in charge. For Construction of Compound wall.
Construction of CRS Masonary 2nd Sort in Cement Mortor (1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work and as directed by Engineer in charge. For Construction of Compound wall.
Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls and as directed by Engineer in charge.For Construction of Compound wall.
Plastering 12mm thick to wall faces in two coats with base coat CM (1:5) 8 mm thick and top coat CM(1:3), 4 mm thick with sponze finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for finished item of work and as directed by Engineer in charge. (APSS 901,903 & 904) For Construction of Compound wall.
Providing Raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop. for including cost & conveyance of all materials to site , seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item of work and as directed by Engineer in charge. For Construction of Compound wall.
Plain Cement Concrete (M 20) by machine mix (cement: fine aggregate: Coarse aggregate) using 40mm and down size Hard Granite macine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as machine mixing, laying and ramming concrete in 150mm layers , finishing top surface, curing concrete, etc., complete for finished item of work and as directed by Engineer in charge. (APSS No. 402) For Construction of Compound wall.
Painting to new walls with 2 coats of ready mixed oil bound washable distemper of approved brand and shade over a base coat of appropriate primer of approved brand making 3 coats in all to give an even shade after thorough brusing the surface to remove all the dirt and remains of loose powdered material including cost and conveyance of all materials to work site and all operational, incidental labour charges etc complete for finished item of work and as directed by Engineer in charge. For Construction of Compound wall.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ Thorrur Fencing for Upload.xlsx
TENDER_DOCUMENT • 0.01 MB
Tender document for Thorrur Fencing work.docx
TENDER_DOCUMENT • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .