Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC Rates quoted by the firm is justified and reasonable |
| 2 | L2₹2.3 Cr+₹45.1 L (24.3%)Rejected-Finance | ₹2.3 Cr+₹45.1 L (24.3%) | L2 | Rejected-Finance Firm not qualified in financial evaluation |
| 3 | Rejected-Technical | - | - | Rejected-Technical Firm not qualified in technical evaluation |
Tender Value
₹87.4 L
EMD Value
₹1.6 L
Closing Date
2 Aug 2018, 12:00 pmClosed
Chief Engineer Project Beacon
HQrs Chief Engineer Project Beacon Old Airport Road Rangreth Srinagar
RISK AND COST TENDER FOR RISK AND COST CONTRACT FOR SUPPLY AND STACKING OF PCC BLOCKS IN M50 CEMENT CONCRETE BET KM 104.00 TO KM 106.00 ON SRINAGAR SONAMARG GUMRI ROAD IN 122 RCC UNDER 32 BRTF PROJECT BEACON IN JK STATE
2018_BRO_358988_1
CE (P) BCN/16/2018-19
Open Tender
Civil Works
Supply
360 days
KM 104.00 TO KM 106.00 ON SSG ROAD
Please refer tender documents
15 documents required · 15 mandatory
₹1
Yes
₹1.6 L
Yes
HQrs Chief Engineer Project Beacon Old Airport Roa
21 Jan 2020
11 Jul 2018
3 Aug 2018
12 Jul 2018
2 Aug 2018
17 Jul 2018
13 Jul 2018 - 16 Jul 2018
17 Jul 2018
Amount
Supply and stacking of PCC blocks (size 225x112x200 mm in key shape as per drawing) (in M-50 grade cement concrete) between km 104.00 to km 106.00 on Srinagar – Sonamarg – Gumri road, all as specified in particular specifications and directed by Engr-In-charge/OC Contract
IMPERIAL ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .