| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | ₹6.0 L Quoted ₹8.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹9.0 LRejected-AOC | ₹9.0 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | PEARL ENTERPRISES L1 | M/s. KSR Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for cleaning the chocked coal in clean out conveyor area manually, dismantling the chains, drive sprocket, driven sprocket, inspection of bearings, cleaning and reassembling changing of bearings, assembling all the dismantled components back in to original position, conducting trial run, checking for normal operation and commissioning cost of consumables and tools and plants. | 6 | Nos | 10,670 ₹64,020 | 11,737 ₹70,422 |
| 2.00 | Charges for dismantling the cleanout conveyor gear box, worn out bearings, spares for gear box & assembling with new bearing, new spares & reconditioning of shaft & complete assembling of gearbox including transport,cost of consumables and tools and plants. | 6 | Nos | 32,244 ₹1.9 L | 35,468 ₹2.1 L |
| 3.00 | Charges for draining the feeder gear box oil, removing the feeder gear box from position, dismantling the gear box , cleaning the gear box, inspection of bearings, gears, assembling the gear box, oil refilling and fixing in position as per the direction of Engineer in-charge, including cost of consumables and tools and plants. | 6 | Opn | 18,973 ₹1.1 L | 20,870 ₹1.3 L |
| 4.00 | Charges for dismantling, leading, lifting, inspection, overhauling, renewal of packings of the joints and re-fitting of dynavan filter of seal air system including cost of consumables and tools and plants. | 1 | Set | 16,006 ₹16,006 | 17,607 ₹17,607 |
| 5.00 | Dismantling the TI Chute knife edge valve, power cylinder and renewal of gland rope & seal kit, assembling the power cylinder with knife edge valve and checking the operation including cost of seal kit including cost of consumables and tools and plants. | 12 | Nos | 5,651 ₹67,812 | 6,216 ₹74,592 |
| 6.00 | Cutting and removal of warped bent damaged under bowl side liner wear plate out of under bowl, dismantling and changing rectifying the above defective under bowl side liner wear plate in under bowl including cost of consumables and tools and plants. | 36 | Nos | 3,556 ₹1.3 L | 3,912 ₹1.4 L |
| 7.00 | Dismantling the scrappers insulation cover, mechanical seal runner and seal assembly etc. and changing of worn-out components, if necessary and assembling every thing in position. including consumables and T&Ps. | 6 | Nos | 17,785 ₹1.1 L | 19,564 ₹1.2 L |
| 8.00 | Cutting and removing damaged worn-out air direction vane and blanking zone, cleaning of accumulated clinkers, cutting of new MS plates to required size, positioning ,blanking One no. of air direction vane opening, by cutting and welding in Hot PA duct - under bowl joining area including consumables and T&Ps. | 6 | Nos | 14,006 ₹84,036 | 15,407 ₹92,442 |
| 9.00 | Charges for dismantling the cold air gate, gear box, chain links and gates cleaning the above, applying grease changing the worn out parts and complete O/H of gear box and assembling the above parts and confirming free movement of gates etc. | 6 | Nos | 8,119 ₹48,714 | 8,931 ₹53,586 |
Tender Value
Refer Docs
EMD Value
₹8,100
Closing Date
8 Jul 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI Circle COH 25 26 MPM Dn Unit I Overhauling of 36 Gravimetric feeder gear box cleanout conveyor COC gear box Dynavane filter IT Chute Cold air gate and providing the under bowl side liner works during capital overhaul
2025_EB_577900_1
CE SE MI NCTPS I 100 25 26
Open Tender
Power/Energy Projects/Products
45 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,100
Yes
29 Apr 2026
4 Jul 2025
9 Jul 2025
4 Jul 2025
8 Jul 2025
4 Jul 2025
Amount
Charges for cleaning the chocked coal in clean out conveyor area manually, dismantling the chains, drive sprocket, driven sprocket, inspection of bearings, cleaning and reassembling changing of bearings, assembling all the dismantled components back in to original position, conducting trial run, checking for normal operation and commissioning cost of consumables and tools and plants.
Charges for dismantling the cleanout conveyor gear box, worn out bearings, spares for gear box & assembling with new bearing, new spares & reconditioning of shaft & complete assembling of gearbox including transport,cost of consumables and tools and plants.
Charges for draining the feeder gear box oil, removing the feeder gear box from position, dismantling the gear box , cleaning the gear box, inspection of bearings, gears, assembling the gear box, oil refilling and fixing in position as per the direction of Engineer in-charge, including cost of consumables and tools and plants.
Charges for dismantling, leading, lifting, inspection, overhauling, renewal of packings of the joints and re-fitting of dynavan filter of seal air system including cost of consumables and tools and plants.
Dismantling the TI Chute knife edge valve, power cylinder and renewal of gland rope & seal kit, assembling the power cylinder with knife edge valve and checking the operation including cost of seal kit including cost of consumables and tools and plants.
Cutting and removal of warped bent damaged under bowl side liner wear plate out of under bowl, dismantling and changing rectifying the above defective under bowl side liner wear plate in under bowl including cost of consumables and tools and plants.
Dismantling the scrappers insulation cover, mechanical seal runner and seal assembly etc. and changing of worn-out components, if necessary and assembling every thing in position. including consumables and T&Ps.
Cutting and removing damaged worn-out air direction vane and blanking zone, cleaning of accumulated clinkers, cutting of new MS plates to required size, positioning ,blanking One no. of air direction vane opening, by cutting and welding in Hot PA duct - under bowl joining area including consumables and T&Ps.
Charges for dismantling the cold air gate, gear box, chain links and gates cleaning the above, applying grease changing the worn out parts and complete O/H of gear box and assembling the above parts and confirming free movement of gates etc.
M/s. KSR Enterprises (BID ID -1394516)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_690578.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid