Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.0 LAccepted-AOC 281 BLOCK 21 M G R STREET NEYVELI CUDDALORE TAMIL NADU 607807 UDYAM TN 04 0047548 | CUDDALORE | TAMIL NADU | 607807 | ₹75.0 L | L1 | Accepted-AOC L1 Contractor |
| 2 | L2₹78.1 L+₹3.2 L (4.24%)Rejected-Finance 15 KALAINAGAR 3RD STREET MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | ₹78.1 L+₹3.2 L (4.24%) | L2 | Rejected-Finance L2 |
| 3 | L3₹78.9 L+₹3.9 L (5.25%)Rejected-Finance | ₹78.9 L+₹3.9 L (5.25%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | THIRUMURUGAN AND CO L1 | PARIS CONSTRUCTION L2 | BALATHANDAYUDAPANI H L3 |
|---|---|---|---|---|---|---|
| 1.00Part-1:- Peraiyur M.Subbulapuram Road to S.Arasapatti Road (via) M.Avarampatti KM 0/0-1/450 (R56) | ||||||
| 1.01 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 2,066.26 | m2 | 5 ₹10,331.3 Lowest | 5.94 ₹12,273.58 | 6 ₹12,397.56 |
| 1.02 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,584.9 | m2 | 20 ₹31,698 Lowest | 21.83 ₹34,598.37 | 25 ₹39,622.5 |
| 1.03 | Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MoRT&H 301 - 305. | 1,281.5 | m3 | 125 ₹1,60,187.5 Lowest | 131.23 ₹1,68,171.25 | 144 ₹1,84,536 |
| 1.04 | Providing and Laying well gravell to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | 181.63 | m3 | 795 ₹1,44,395.85 | 396.38 ₹71,994.5 Lowest | 400 ₹72,652 |
| 1.05 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 116.77 | m3 | 1,950 ₹2,27,701.5 Lowest | 2,198.5 ₹2,56,718.85 | 2,225 ₹2,59,813.25 |
| 1.06 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 723.84 | m3 | 2,000 ₹14,47,680 Lowest | 2,236.05 ₹16,18,542.43 | 2,250 ₹16,28,640 |
| 1.07 | Providing and Laying US Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. Km 0/0-1/0 | 256.08 | m3 | 870 ₹2,22,789.6 | 470.61 ₹1,20,513.81 Lowest | 472 ₹1,20,869.76 |
| 1.08 | Km 1/0-1/450 | 117 | m3 | 875 ₹1,02,375 | 470.61 ₹55,061.37 Lowest | 475 ₹55,575 |
| 1.09 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 5,401.5 | m2 | 80 ₹4,32,120 Lowest | 80.95 ₹4,37,251.43 | 85 ₹4,59,127.5 |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
10 Jan 2025, 3:00 pmClosed
Additional collector DRDA Madurai
o/o Additional collector DRDA Madurai
Strengthening and Black Toppingof Peraiyur M.Subbulapuram Road to S.Arasapatti Road (via) M.Avarampatti KM 0/0-1/450 (R56) in T.Kallupatti Block in Madurai district under NABARD XXX (2024-25)
2024_RDTN_514730_8
DIPR/5603/Tender/2024
Open Tender
Civil Works - Roads
Item Rate
180 days
T.Kallupatti
Refer Tender documents
5 documents required · 5 mandatory
₹0
₹80,000
o/o Additional collector DRDA Madurai
31 Oct 2025
30 Dec 2024
10 Jan 2025
30 Dec 2024
10 Jan 2025
3 Jan 2025
3 Jan 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .