Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.8 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹14.5 L+₹71,279.05 (5.18%)Rejected-AOC | 2 | Rejected-AOC Accept | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Not Produced in required documents | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Not Produced in required documents | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Not Produced in required documents |
| Sl No | Description | Qty | Unit | E T T Construction L2 | S DHANANJEYAN CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Repair to M-Tiled School building in Ranimoockanur (South Facing) at Ranimoockanur | |||||
| 2.00 | Dismantling Brickwork in Cement mortar with standard specification | 0.54 | Cum | 244 ₹131.76 Lowest | 1,000 ₹540 |
| 3.00 | Clean Removal of Mangalore tiled roof withuot roof timpers including cost and conveyances of all labourcharges etc complete | 128.11 | Cum | 24 ₹3,074.64 Lowest | 200 ₹25,622 |
| 4.00 | Supplying and fixing colour polyurethane foam panels roof and steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. | 128.11 | Cum | 3,387.42 ₹4,33,962.38 | 1,000 ₹1,28,110 Lowest |
| 5.00 | Brickwork in Cement mortar with standard specification | 0.54 | Cum | 5,974 ₹3,225.96 | 5,500 ₹2,970 Lowest |
| 6.00 | Plastering with cement mortar 1:5 mix to 12mm thick including | 9.18 | Cum | 267 ₹2,451.06 Lowest | 350 ₹3,213 |
| 7.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 102.21 | Sqm | 142 ₹14,513.82 Lowest | 300 ₹30,663 |
| 8.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 | 136.69 | Sqm | 253 ₹34,582.57 Lowest | 300 ₹41,007 |
| 9.00 | Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer. | 20.56 | Sqm | 249 ₹5,119.44 Lowest | 250 ₹5,140 |
| 10.00 | Painting two coats for Blackboard with approved quality of paint including cost and conveyance of all materials to site and all labour charges etc complete . | 10.8 | Sqm | 156 ₹1,684.8 Lowest | 250 ₹2,700 |
Tender Value
₹14.6 L
EMD Value
₹15,000
Closing Date
1 Jul 2025, 3:00 pmClosed
Block Development Officer(BP), Morappur
Block Development Office, Morappur
1.Repair to M-Tiled School building at Ranimoockanur South Facing ,Ranimoockanur Est Amt. Rs.727000 and 2.Repair to the Two class RCC School building at Ranimoockanur PUMS East Facing, Ranimookanur Est Amt. Rs.737000
2025_RDTN_572209_1
Roc.No. 4762/2024/A3 Dt. 17.06.2025 -SIUS(2025-26)
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Morappur
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹15,000
11 Aug 2025
21 Jun 2025
1 Jul 2025
21 Jun 2025
1 Jul 2025
21 Jun 2025
Amount
Repair to M-Tiled School building in Ranimoockanur (South Facing) at Ranimoockanur
Dismantling Brickwork in Cement mortar with standard specification
Clean Removal of Mangalore tiled roof withuot roof timpers including cost and conveyances of all labourcharges etc complete
Supplying and fixing colour polyurethane foam panels roof and steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers.
Brickwork in Cement mortar with standard specification
Plastering with cement mortar 1:5 mix to 12mm thick including
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
Painting two coats for Blackboard with approved quality of paint including cost and conveyance of all materials to site and all labour charges etc complete .
Provision for Repairs Doors & windows
Provision for Cuboard with Locking facility for Techers
Provision for Cuboard has to be provided inside class Room for Students
Provision for Chappal rack Outside the class Room
Provision for Fibre Board (3mX1.2m)
Provision for Bala Painting drawings
Provision for Name Board Charges
Provision for Photo Charges
Repair to the Two class RCC School building in Ranimoockanur PUMS (East Facing) at Ranimookanur
Dismantiling the damaged Pressed Tiles in Cement Morter incl all labour charges etc.,
Dismantiling the Chipping concrete in Cement Morter incl all labour charges etc.,
Finishing the top of roof with one course of Coolent tiles conveyance of all materials to site and all labour charges etc complete
Floor Finishing Kota stona of Size 600x600x18 cost and conveyance of all materials to site and all labour charges etc complete
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting two coats over Black painting plastering emulsion works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Provision for Cupboard with locking facility for teachers
Provision for Cupboard has to be provided inside Class room for students
Provision for Chappal rack Outside the Class room
Provision for Bala Paintings
Provision for RWH
Provison for Fan 1200mm SD 110
Provision for Name Board Charges
Provision for photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
E T T Construction (BID ID -1387331)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .