Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-Finance | L1 | Accepted-Finance Accepted for financial bid | |
| 2 | L2₹6.2 L+₹5,041.65 (0.82%)Accepted-Finance | L2 | Accepted-Finance Accepted for financial bid | |
| 3 | L3₹6.6 L+₹46,912.99 (7.59%)Accepted-Finance | L3 | Accepted-Finance Accepted for financial bid | |
| 4 | L4₹6.7 L+₹55,631.61 (9.00%)Accepted-Finance | L4 | Accepted-Finance Accepted for financial bid | |
| 5 | L5₹7.5 L+₹1.3 L (21.3%)Accepted-Finance JINDAL FLOOR MILL CHUDI GALI NEEMUCH NEEMUCH NEEMUCH MADHYA PRADESH 458441 | NEEMUCH | MADHYA PRADESH | 458441 | L5 | Accepted-Finance Accepted for financial bid |
Tender Value
₹8.3 L
EMD Value
₹16,675
Closing Date
2 Feb 2021, 4:00 pmClosed
DIG GC 2 CRPF
Group Centre 2 CRPF Foy Sagar Road Ajmer Rajasthan
Repair of 40 Meter damaged boundary wall at Group Centre 2 CRPF Ajmer Rajasthan
2021_CRPF_612097_1
B-V-1/2020-21-GC-2-BLDG Dated 24/12/2020
Open Tender
Civil Works
Works
45 days
O/O DIG GC 2 CRPF
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
DIG GC 2 CRPF Ajmer
₹16,675
Yes
25 May 2021
25 Jan 2021
3 Feb 2021
25 Jan 2021
2 Feb 2021
25 Jan 2021
Civil Work :
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level.
Centering and shuttering including strutting, propping etc. and removal of form for
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
12 mm cement plaster of mix :
Finishing walls with Acrylic Smooth exterior paint of required shade :
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre enable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 1)110 mm diameter( for weep holes as drainage purpose)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in- charge.
Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives
MAHENDRA CONSTRUCTION COMPANY
M/s Rajesh Enterprises
S K ARORA
HONEST ENTERPRISES AND SUPPLIERS
ORIENTAL INTEGRATED FACILITY MANAGEMENT PVT. LTD.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .