| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.3 LAdmitted-Finance | -31.77% | ₹13.3 L | L1 | Admitted-Finance |
| 2 | L2₹13.6 L+₹32,582.68 (2.45%)Admitted-Finance | -30.10% | ₹13.6 L+₹32,582.68 (2.45%) | L2 | Admitted-Finance |
| 3 | L3₹13.9 L+₹62,628.98 (4.70%)Admitted-Finance | -28.56% | ₹13.9 L+₹62,628.98 (4.70%) | L3 | Admitted-Finance |
| 4 | L4₹15.4 L+₹2.1 L (15.8%)Admitted-Finance | -20.99% | ₹15.4 L+₹2.1 L (15.8%) | L4 | Admitted-Finance |
Tender Value
₹19.5 L
EMD Value
₹39,020
Closing Date
12 Aug 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Construction of Badminton court and volley ball court at Govt, Polytechnic College Bemina Srinagar.
2026_PWDJK_319858_3
Nit-43 of RNB/5472-79/2026-27 dtd.06-08-2026
Open Tender
Civil Works
Percentage
60 days
Govt, Polytechnic College Bemina Srinagar.
as per Nit
2 documents required · 2 mandatory
₹800
Executive Engineer RNb Dalgate DIvision Sgr
₹39,020
18 Aug 2026
6 Aug 2026
13 Aug 2026
7 Aug 2026
12 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 425.06 | Sqm | 77.75 | ₹33,048.42 |
| 2 | Providing and laying of stone soling / Granular sub base including watering and compacting with 8 to 10 tonn capacity power road roller to specified lines, grades, cross sections, density, finished work to be measured including carriage of materials by mechanical transport from source of supply upto site of work also includes all leads, lifts, loading, unloading and stacking charges complete. | 95.3 | Cum | 847.46 | ₹80,762.94 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 32.39 | Cum | 4,409.24 | ₹1,42,815.28 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 61.15 | Cum | 6,600.34 | ₹4,03,610.79 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.4 | Cum | 5,585.81 | ₹30,163.37 |
| 6 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars of grade. Fe-500D or more complete. | 2,140.18 | Kg | 104.41 | ₹2,23,456.19 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. | 71.38 | Sqm | 242.67 | ₹17,321.78 |
| 8 | roviding,supply and applying Synthetic Court 8 Layer ITF Approved PRIMER: 1 Layer 100% ACRYFLEX UNIC FLOOR based emulsion to improve bond of acrylic court system to the concrete or asphalt surfaces RESURFACER: 1 Acryflex Resurfacer 367-30 for filling and smoothing asphalt or concrete surfaces in preparation for Acryflex ITF Approved court system. And also fills the surface chips, voids and conceals repairs while providing a smooth surface for color coating CUSHION COAT: 2 Layers of Acryflex unic floor cushion for asphalt or concrete surfaces in preparation for Acryflex ITF approved system ULTRA CUSHION COAT: 2 Layers of Acryflex unic floor cushion for asphalt or concrete surfaces in preparation for Acryflex ITF approved system PRECOAT: 2 layers of Acryflex unic floor based textured topcoat. Ideal for color coating courts and other sport pavement surfaces.OVERLINE: 100% Acryflex unic floor based high hiding line paints. This Item includes preparing the Concrete surface by removing dirt, uneveness using grinding, rubbing etc complete Job | 4,319.5 | Sft | 144.07 | ₹6,22,310.37 |
| 9 | Supply and installation of complete badminton setup including a pair of heavy duty ground posts, a premium durable grade court net, all required tensioning ropes, hooks, and assembly hardware for a standard court installation. Net size is 6.10mx0.76m and pole height is 1.55m. | 1 | No | 10,169.49 | ₹10,169.49 |
| 10 | Supply and installation of volleyball post set standard quality and make made of heavy duty 75mm round steel pipe with height adjustment, a premium durable court net complete including loading / unloading assembling, fixing and adjusting at site and all leads and lifts complete.( size as per relevant standard) | 1 | No | 33,898.31 | ₹33,898.31 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1060927.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .