Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance P 46 8TH AVENUE DTC MWC CHENGALPATTU TAMIL NADU | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603004 | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO B 85 PHASE II CHAKAN INDUSTRIAL AREA VILL SAWARDARI CHAKAN INDL AREA VILL SAWARDARI PUNE | Admitted-Finance |
| 3 | Admitted-Finance PLOT NO C 37 MIDC AREA MIDC AHILYANAGAR AHMEDNAGAR MAHARASHTRA 414111 | AHMEDNAGAR | MAHARASHTRA | 414111 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
13 Aug 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr. Sushant Deshpande
thyssenKrupp Industrial Solutions (India) Private Limited (Formerly Uhde India Private Limited) Uhde House, L B S Marg, Vikhroli (W), Mumbai - 400083, India.
SUPPLY OF STEAM TRAPS for Naphtha Cracker Expansion Project at Panipat Refinery
2020_REFHQ_120617_1
6714-PPM-00-EC-0218
Limited
Mechanical - Piping, materials, flanges, valves, seals
Supply
120 days
IOCL Panipat Refinery
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
17 Dec 2020
23 Jul 2020
14 Aug 2020
23 Jul 2020
13 Aug 2020
3 Aug 2020
120 days
COMPACT STEAM TRAP,CS(IBR),STANDARD : MFG STD NOM.PRESSURE/CLASS : 150,0,CONNECTION : SW ENDS, B16.11,COMPACT STEAM TRAP ASSEMBLY WITH INBUILT THERMODYNAMIC TRAP,UPSTREAM ISOLATION VALVE,DOWNSTREAM ISOLATION VALVE, BYPASS VALVE, TRAP VENT VALVE,AND TRAP TEST VALVE.BODY A105,PISTON SS 304,INTERNALS SS 304,SEALING RING SS REINFORCED GRPH,TRAP SEAT HARDENED TOOL STEEL,TRAP DISC HARDENED TOOL STEEL,GASKET SP WD SS316+FLX GRPH,FASTENERS A193 GR B7/A194 GR2H ADD. INFORMATION : DESIGN PRESSURE(kg/cm2g) :7/FV DESIGN TEMP.(DEG C) :290 OPERATING PRESSURE(kg/cm2g):4 OPERATING TEMP.(DEG C) :200 BACK PRESSURE(kg/cm2g) :ATM CAPACITY (kg/hr) :45 SERVICE :LP STEAM FOR GENL TECH. REQ. REFER DOC.6714-PIP-00-EC-0013. IBR CERTIFICATE IN FORM IIIC REQUIRED NOTE: COMPACT STEAM TRAP ASSEMBLY SHALL CONSIST OF FOLLOWING: 1) UPSTREAM & DOWNSTREAM ISOLATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 2) TRAP BYPASS VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 3) TRAP VENT/DEPRESSURIZATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE 4) TRAP TEST VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 5) ALL FIVE VALVES SHALL BE INTEGRAL GLANDLESS & SEATLESS PISTON VALVES. 6) SEALING RINGS SHALL BE RENEWABLE & INTERCHANGEABLE. 7) STRAINER SHALL BE INTEGRAL INBUILT STRAINER AT INLET 8) ALL VALVES SHALL BE NON ROTATING PISTON DESIGN. 9) TRAP SEAT AND DISC SHALL BE ON-FIELD REPLACABLE.
COMPACT STEAM TRAP,CS(IBR),STANDARD : MFG STD NOM.PRESSURE/CLASS : 150,0,CONNECTION : SW ENDS, B16.11,COMPACT STEAM TRAP ASSEMBLY WITH INBUILT THERMODYNAMIC TRAP,UPSTREAM ISOLATION VALVE,DOWNSTREAM ISOLATION VALVE, BYPASS VALVE, TRAP VENT VALVE,AND TRAP TEST VALVE.BODY A105,PISTON SS 304,INTERNALS SS 304 SEALING RING SS REINFORCED GRPH,TRAP SEAT HARDENED TOOL STEEL,TRAP DISC HARDENED TOOL STEEL,GASKET SP WD SS316+FLX GRPH,FASTENERS A193 GR B7/A194 GR2H ADD. INFORMATION : DESIGN PRESSURE(kg/cm2g) :7/FV DESIGN TEMP.(DEG C) :290 OPERATING PRESSURE(kg/cm2g):4 OPERATING TEMP.(DEG C) :200 BACK PRESSURE(kg/cm2g) :ATM CAPACITY (kg/hr) :45 SERVICE :LP STEAM FOR GENL TECH. REQ. REFER DOC. 6714-PIP-00-EC-0013. IBR CERTIFICATE IN FORM IIIC REQUIRED NOTE: COMPACT STEAM TRAP ASSEMBLY SHALL CONSIST OF FOLLOWING: 1) UPSTREAM & DOWNSTREAM ISOLATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 2) TRAP BYPASS VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 3) TRAP VENT/DEPRESSURIZATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE 4) TRAP TEST VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 5) ALL FIVE VALVES SHALL BE INTEGRAL GLANDLESS & SEATLESS PISTON VALVES. 6) SEALING RINGS SHALL BE RENEWABLE & INTERCHANGEABLE. 7) STRAINER SHALL BE INTEGRAL INBUILT STRAINER AT INLET 8) ALL VALVES SHALL BE NON ROTATING PISTON DESIGN. 9) TRAP SEAT AND DISC SHALL BE ON-FIELD REPLACABLE.
COMPACT STEAM TRAP,CS(IBR),STANDARD : MFG STD NOM.PRESSURE/CLASS : 150,0,CONNECTION : SW ENDS, B16.11,COMPACT STEAM TRAP ASSEMBLY WITH INBUILT THERMODYNAMIC TRAP,UPSTREAM ISOLATION VALVE,DOWNSTREAM ISOLATION VALVE, BYPASS VALVE, TRAP VENT VALVE,AND TRAP TEST VALVE.BODY A105,PISTON SS 304,INTERNALS SS 304 SEALING RING SS REINFORCED GRPH,TRAP SEAT HARDENED TOOL STEEL,TRAP DISC HARDENED TOOL STEEL,GASKET SP WD SS316+FLX GRPH,FASTENERS A193 GR B7/A194 GR2H ADD. INFORMATION : DESIGN PRESSURE(kg/cm2g) :7/FV DESIGN TEMP.(DEG C) :290 OPERATING PRESSURE(kg/cm2g):4 OPERATING TEMP.(DEG C) :200 BACK PRESSURE(kg/cm2g) :ATM CAPACITY (kg/hr) :45 SERVICE :LP STEAM FOR GENL TECH. REQ. REFER DOC.6714-PIP-00-EC-0013. IBR CERTIFICATE IN FORM IIIC REQUIRED NOTE: COMPACT STEAM TRAP ASSEMBLY SHALL CONSIST OF FOLLOWING: 1) UPSTREAM & DOWNSTREAM ISOLATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 2) TRAP BYPASS VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 3) TRAP VENT/DEPRESSURIZATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE 4) TRAP TEST VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 5) ALL FIVE VALVES SHALL BE INTEGRAL GLANDLESS & SEATLESS PISTON VALVES. 6) SEALING RINGS SHALL BE RENEWABLE & INTERCHANGEABLE. 7) STRAINER SHALL BE INTEGRAL INBUILT STRAINER AT INLET 8) ALL VALVES SHALL BE NON ROTATING PISTON DESIGN. 9) TRAP SEAT AND DISC SHALL BE ON-FIELD REPLACABLE.
COMPACT STEAM TRAP,CS(IBR),STANDARD : MFG STD,NOM.PRESSURE/CLASS : 300,0 CONNECTION : SW ENDS, B16.11,DESCRIPTION : COMPACT STEAM TRAP ASSEMBLY WITH INBUILT THERMODYNAMIC,TRAP,UPSTREAM ISOLATION VALVE,,DOWNSTREAM ISOLATION VALVE,BYPASS VALVE, TRAP VENT VALVE,AND TRAP TEST VALVE. MATERIAL : BODY A105,PISTON SS 304,INTERNALS SS 304,SEALING RING SS,REINFORCED GRPH,TRAP SEAT HARDENED TOOL STEEL,TRAP DISC HARDENED TOOL STEEL,GASKET SP WD SS316+FLX GRPH,FASTENERS A193 GR B7/A194 GR2H ADD. INFORMATION :. DESIGN PRESSURE(kg/cm2g) :20.4/FV DESIGN TEMP.(DEG C) :350 OPERATING PRESSURE(kg/cm2g):16.3 OPERATING TEMP.(DEG C) :290 BACK PRESSURE(kg/cm2g) :ATM CAPACITY (kg/hr) :65 SERVICE :MP STEAM FOR GENL TECH. REQ. REFER DOC.6714-PIP-00-EC-0013. IBR CERTIFICATE IN FORM IIIC REQUIRED NOTE: COMPACT STEAM TRAP ASSEMBLY SHALL CONSIST OF FOLLOWING: 1) UPSTREAM & DOWNSTREAM ISOLATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 2) TRAP BYPASS VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 3) TRAP VENT/DEPRESSURIZATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE 4) TRAP TEST VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 5) ALL FIVE VALVES SHALL BE INTEGRAL GLANDLESS & SEATLESS PISTON VALVES. 6) SEALING RINGS SHALL BE RENEWABLE & INTERCHANGEABLE. 7) STRAINER SHALL BE INTEGRAL INBUILT STRAINER AT INLET 8) ALL VALVES SHALL BE NON ROTATING PISTON DESIGN. 9) TRAP SEAT AND DISC SHALL BE ON-FIELD REPLACABLE.
COMPACT STEAM TRAP,CS(IBR),STANDARD : MFG STD,NOM.PRESSURE/CLASS : 600,0 CONNECTION : SW ENDS, B16.11,DESCRIPTION : COMPACT STEAM TRAP ASSEMBLY WITH INBUILT THERMODYNAMIC TRAP,UPSTREAM ISOLATION VALVE, DOWNSTREAM ISOLATION VALVE, BYPASS VALVE, TRAP VENT VALVE, AND TRAP TEST VALVE. MATERIAL : BODY A105, PISTON SS 304, INTERNALS SS 304, SEALING RING SS REINFORCED GRPH, TRAP SEAT HARDENED TOOL STEE,L TRAP DISC HARDENED TOOL STEEL, GASKET SP WD SS316+FLX GRPH,FASTENERS A193 GR B7/A194 GR2H ADD. INFORMATION :. DESIGN PRESSURE(kg/cm2g) :50/FV DESIGN TEMP.(DEG C) :427 OPERATING PRESSURE(kg/cm2g):40 OPERATING TEMP.(DEG C) :375 BACK PRESSURE(kg/cm2g) :ATM CAPACITY (kg/hr) :45 SERVICE :HP STEAM FOR GENL TECH. REQ. REFER DOC.6714-PIP-00-EC-0013. IBR CERTIFICATE IN FORM IIIC REQUIRED NOTE: COMPACT STEAM TRAP ASSEMBLY SHALL CONSIST OF FOLLOWING: 1) UPSTREAM & DOWNSTREAM ISOLATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 2) TRAP BYPASS VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 3) TRAP VENT/DEPRESSURIZATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE 4) TRAP TEST VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 5) ALL FIVE VALVES SHALL BE INTEGRAL GLANDLESS & SEATLESS PISTON VALVES. 6) SEALING RINGS SHALL BE RENEWABLE & INTERCHANGEABLE. 7) STRAINER SHALL BE INTEGRAL INBUILT STRAINER AT INLET 8) ALL VALVES SHALL BE NON ROTATING PISTON DESIGN. 9) TRAP SEAT AND DISC SHALL BE ON-FIELD REPLACABLE.
THERMODYNAMIC STEAM TRAP,SS,STANDARD : MFR. STD.,NOM.PRESSURE/CLASS : 800,0 CONNECTION : SW,MATERIAL : BODY : A182 GR.F304,ADD. INFORMATION : FOR GENERAL TECHNICAL REQUIREMENT REFER 6714-00-PIP-EC-0013.
COMPACT STEAM TRAP,AS(IBR),STANDARD : MFG STD, NOM.PRESSURE/CLASS : 2500,0,CONNECTION : BW ENDS,SCH 160,DESCRIPTION : COMPACT STEAM TRAP ASSEMBLY WITH INBUILT THERMODYNAMIC TRAP,UPSTREAM ISOLATION VALVE,DOWNSTREAM ISOLATION VALVE,BYPASS VALVE, TRAP VENT VALVE,AND TRAP TEST VALVE.MATERIAL : BODY A182 GR.F91 COVER A182 GR.F91,INTERNALS A182 GR.F91,SEALING RING SS REINFORCED GRPH,TRAP SEAT HARDENED TOOL STEEL TRAP DISC HARDENED TOOL STEEL,GASKET SP WD SS316+FLX GRPH FASTENERS A193GR B16/A194 GR 4 ADD. INFORMATION :. DESIGN PRESSURE(kg/cm2g) :20.4/FV DESIGN TEMP.(DEG C) :350 OPERATING PRESSURE(kg/cm2g):16.3 OPERATING TEMP.(DEG C) :290 BACK PRESSURE(kg/cm2g) :ATM CAPACITY (kg/hr) :65 SERVICE :MP STEAM FOR GENL TECH. REQ. REFER DOC.6714-PIP-00-EC-0013. IBR CERTIFICATE IN FORM IIIC REQUIRED NOTE: COMPACT STEAM TRAP ASSEMBLY SHALL CONSIST OF FOLLOWING: 1) UPSTREAM & DOWNSTREAM ISOLATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 2) TRAP BYPASS VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 3) TRAP VENT/DEPRESSURIZATION VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE 4) TRAP TEST VALVE SHALL BE INTEGRAL INBUILT PISTON VALVE. 5) ALL FIVE VALVES SHALL BE INTEGRAL GLANDLESS & SEATLESS PISTON VALVES. 6) SEALING RINGS SHALL BE RENEWABLE & INTERCHANGEABLE. 7) STRAINER SHALL BE INTEGRAL INBUILT STRAINER AT INLET 8) ALL VALVES SHALL BE NON ROTATING PISTON DESIGN. 9) TRAP SEAT AND DISC SHALL BE ON-FIELD REPLACABLE.
Forbes Marshall Pvt Limited
Uni Klinger Limited
WKZZ126R-3/4"
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .