Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹36.0 L+₹500.32 (0.01%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOHAMED ABDUL RAHMAN L1 | N KARTHIKEYAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of Minor Bridge 2 across Iluppaithandalam Channel at Kilvenkatapuram Panchayat in Nemili Block | |||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20A | 255.92 | CUM | 262 ₹67,051 Lowest | 263 ₹67,307 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete | 28.44 | CUM | 5,823 ₹1,65,606 Lowest | 5,823 ₹1,65,606 Lowest |
| 4.00 | Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete | 130.53 | CUM | 6,129 ₹8,00,018 Lowest | 6,129.43 ₹8,00,074 |
| 5.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 122.85 | CUM | 7,222 ₹8,87,223 Lowest | 7,222.71 ₹8,87,310 |
| 6.00 | Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 32.61 | CUM | 9,724 ₹3,17,100 Lowest | 9,724.78 ₹3,17,125 |
| 7.00 | Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall & Deck Wall | 10.8 | Sqm | 479 ₹5,173 Lowest | 479 ₹5,173 Lowest |
| 8.00 | Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification | 4.94 | MT | 91,924.74 ₹4,54,108 Lowest | 91,924.74 ₹4,54,108 Lowest |
| 9.00Supplying and erecting of Centering for all PCC items including cost and conveyance labour charges etc complete. | |||||
| 10.00 | Below sill | 526.86 | Sqm | 547.5 ₹2,88,456 Lowest | 547.5 ₹2,88,456 Lowest |
Tender Value
₹36.7 L
EMD Value
₹36,730
Closing Date
14 Oct 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP)
BLOCK DEVELOPMENT OFFICE NEMILI
Construction of Minor Bridge 2 across Iluppaithandalam Channel at Kilvenkatapuram Panchayat in Nemili Block
2025_RDTN_611945_1
A3/2895/2025
Open Tender
Civil Works
Item Rate
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹36,730
Yes
14 Oct 2025
7 Oct 2025
14 Oct 2025
7 Oct 2025
14 Oct 2025
7 Oct 2025
Amount
Construction of Minor Bridge 2 across Iluppaithandalam Channel at Kilvenkatapuram Panchayat in Nemili Block
Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20A
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. Complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall & Deck Wall
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
Supplying and erecting of Centering for all PCC items including cost and conveyance labour charges etc complete.
Below sill
Above sill
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
N KARTHIKEYAN (BID ID -1487411)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .