Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 2 | Admitted-Finance 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
14 Apr 2022, 5:00 pmClosed
Superintenging Engineer
EDC Ayodhya
Construction of line and giving supply 12.5 KW an 1 KW L/F Connection of Payjal Yojana Nalkoop Sandawa, giving connection Sri Shadab Ahmad, Consruction of line of Mini Stadium Kandai Kala and Shifting of LT line at Vill. Ajanai Tara Railway gate No.
2022_MVVNL_685727_1
96 H(F)(W)/2021-22
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹2,000
20 Apr 2022
8 Apr 2022
15 Apr 2022
8 Apr 2022
14 Apr 2022
8 Apr 2022
Amount
Carriage including loading, unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 60 Kms. (distance approx)
PCC Pole 8.5 Mtr. Long
S.T. Pole 11 Mtr. Long
S.T. Pole 13 Mtr. Long
ACSR Weasel Conductor
L.T. PVC Cable 3.5x70 sqmm
Transformer 25 KVA
Other matching Materials
Dragging of PCC/ST Pole from dump site to pit site
Fabrication and Errection of Single Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Double Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Double Pole Support on ST Pole 13 Mtr &11 mtr including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Earthing of Poles as per RESPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
Dismantling of old line with Dismantling Material
Rect. Back old and used scrap Iron
M/S ALOK CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .