Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC NATUNGRAM | ₹18.6 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹18.7 L+₹9,465.38 (0.51%)Rejected-Finance SAHEBNAGAR AGRAADWIR DIST PURBA BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | ₹18.7 L+₹9,465.38 (0.51%) | L2 | Rejected-Finance NOT L1 BIDDER |
| 3 | L3₹18.8 L+₹19,309.37 (1.04%)Rejected-Finance | ₹18.8 L+₹19,309.37 (1.04%) | L3 | Rejected-Finance NOT L1 BIDDER |
| 4 | L4₹18.9 L+₹21,013.13 (1.13%)Rejected-Finance | ₹18.9 L+₹21,013.13 (1.13%) | L4 | Rejected-Finance NOT L1 BIDDER |
| 5 | L5₹18.9 L+₹25,556.51 (1.37%)Rejected-Finance VILL P O BAHIRI DIST BIRBHUM PIN 731240 | BIRBHUM | BIRBHUM | WEST BENGAL | 731240 | ₹18.9 L+₹25,556.51 (1.37%) | L5 | Rejected-Finance NOT L1 BIDDER |
Tender Value
₹18.9 L
EMD Value
₹37,862
Closing Date
17 Feb 2026, 2:00 pmClosed
EE/MSCD,BOLPUR,BIRBHUM
Office of the Executive Engineer, Mayurakshi South Canals Division, Santiniketan, Birbhum
M/R to Left Ex-Zamindary Embankment of River Ajoy in between 5.60 km and 5.95 km at upstream of Gheropara within GP- Raipur-Supur, Block-Bolpur-Sriniketan under Mayurakshi South Canals Division.
2026_IWD_998573_12
WBIW/EE/MSCD/ NIT- 13(e) /2025-26
Open Tender
CIVIL WORKS
Percentage
60 days
Rajatpur
Please refer Tender documents.
8 documents required · 8 mandatory
₹37,862
Yes
19 Aug 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 2,926 | Sqm | 2.38 | ₹6,963.88 |
| 2 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
A) Beyond 500 metre and upto 1.00 km
Note :Add extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department and for royalty charges on earth as per latest rate as mentioned in PWD Schedule. The royalty will be paid to the agency on production of necessary documents in support of payment made toward the royalty. During initial payment of bill a deduction as per considered rate may be made. | - | Cum | 330.48 | - |
| 3 | Supplying to site empty cement polythenebags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg) | - | Each | 7.15 | - |
| 4 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted), and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | - | Each | 8.34 | - |
| 5 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | - | Each | 3.58 | - |
| 6 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | - | Each | 139.44 | - |
| 7 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or
bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per
direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3.
Size of Nylon crate is 1metre X 1metre X 1metre.
(b) Where boats are not necessary. | - | Each | 498.17 | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
Tendernotice_2.pdf
PDF • 0.52 MB
BOQ_2445711.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .