Loading…
Loading…
Tender Value
₹29.0 L
EMD Value
₹2.9 L
Closing Date
8 Sept 2026, 2:00 pm
Registrar / Finance officer, CCSU
Office of the FO, CCSU, Meerut
02 - Construction of Shed for Yoga Deptt. at University campus.
2026_CCSUN_1177904_1
Abhi/15/2026-27/02, Dt. 06-08-2026
Open Tender
Miscellaneous Works
Percentage
120 days
Meerut
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹766
Finance Officer, Ch. Charan Singh University
₹2.9 L
20 Aug 2026
20 Aug 2026
8 Sept 2026
20 Aug 2026
8 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ means over areas (exceeding 30 cm in depth, 1.5 min width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 35 | cum | 131.71 | ₹4,609.68 |
| - | 1:4:8 (1 cement: 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derved from natural sources) | 60 | cum | 5,054.5 | ₹3,03,270.24 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for. 5.9.6 columns, pillers, piers, Abutments, Postes and strruts | 30 | Sqm | 713.28 | ₹21,398.54 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Mild steel and Medium Tensile steel bars | 545 | Kg | 79.47 | ₹43,310.17 |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 5.2.2 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4 | Cum | 8,052.89 | ₹32,211.56 |
| - | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinthin:
6.2.2 Cement Mortar 1:6 (1cement: 6 coarse sand). | 20 | cum | 4,671 | ₹93,420.03 |
| - | Brick work with common burnt clay F.P.S.(no modular) bricks of class designation 7.5 in superstructure above plinth level upto floor V level in all shapes and sizes in:
6.4.1 Cement mortar 1:6 (1cement : 6 coarse sand) | 15 | Cum | 6,756.61 | ₹1,01,349.22 |
| - | 12 mm cement plaster of mix: 13.4.2 1:6 (1 cement : 6 coarse sand) | 170 | sqm | 254.99 | ₹43,348.01 |
| - | Kota stone slab flooring over 20mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement : 4 coarse sand):
11.26.1 25mm thick | 340 | sqm | 1,445.6 | ₹4,91,504.51 |
| - | Providing and fixing M.S. Tubular frames for doors, windows, ventilators and cupboard with rectangular/L-Type sections, made of 1.60 mm thick M.S. Sheet, joints mitred, welded and grinded finish, with profiles of required size, inciuding fixing of neeessary butt hinges and screws and applying a priming coat of approved steel primer. | 6,000 | kg | 144.84 | ₹8,69,030.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.16 MB
Tendernotice_2.pdf
PDF • 0.85 MB
BOQ_2213333.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].