Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance BARDHAMAN DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance DVC MORE PANDAVESWAR BARDHAMAN WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.4 L
EMD Value
₹24,300
Closing Date
10 Jan 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Transportation, installation, necessary fabrica-tion, commissioning trial run including exten-sion of one no. 1000mm width, 1x110kW, 550V, single drive belt conveyor along 72L from 17D to 28D for development of panel-8 in R-VII seam at 3n4 Incline,
2022_ECL_265889_1
ECL/GM/JNR/EnM/e-Tender/ 22-23/A2/55,dt.26.12.2022
Open Tender
Miscellaneous Works
Item Rate
45 days
JHANJRA UNDERGROUND
PLEASE REFER TO TENDER DOCUMENTS.
4 documents required · 4 mandatory
₹24,300
11 Jan 2023
30 Dec 2022
11 Jan 2023
30 Dec 2022
10 Jan 2023
31 Dec 2022
30 Dec 2022 - 5 Jan 2023
Amount
Transportation & installation of one no. 1000mm width, 1x110kW, 550V, single drive belt conveyor for a length of 69mtr from 72L/17D to 72L/19D in R-VII seam at 3&4 Incline, J.P.Colly.
Transportation of the 1000mm width, 1x110kW, 550V Drive Head complete including gear box, motor(110kW/550V), base frame, couplings, bearing blocks, fencing etc from (76L-75L)/-3D (R-VII) and installation at 72L/18D (R-VII) with necessary fabrication job.
Transportation of Discharge Unit complete with girders, strike plate, chute plates, scrappers etc from (76L-75L)/-3D (R-VII) and installation at 72L/17D (R-VII) with necessary fabrication job.
Transportation of Loop Take Up Unit complete with winch etc from (76L-75L)/-3D (R-VII) and installation at 72L/(18D-19D) (R-VII) with necessary fabrication job.
Transportation of Tail End Unit complete with fencing from (76L-75L)/-3D (R- VII) and installation at 72L/19D (R-VII) with necessary fabrication job.
Transportation of 69mtr. 1000mm belt conveyor structure complete with stringer, foot stool, top bracket, top & bottom roller etc. from surface to 72L/17D (R-VII) and installation from 72L/17D to 72L/19D in R-VII seam.
Loading, transportation, unloading & placing of one breaker(550V/200A), starter(550V/110kW), LS unit, winch starter from surface to 72L/4D (R-VII) with help of haulages (length of trackline is approx. 3000mtr.) and then approx. 500mtr manually transport to 72L/18D (R-VII).
Transportation of 250mtr. 550V grade 70 sq.mm. PVCDWA cable from surface after loading it on trolley and transport by haulages to 74L/4D (R-VII); then approx. 500mtr. manually transport to 72L/18D (R-VII) and laying-hanging of this cable from 72L/18D (R-VII) ACB to 72L/12D (R-VII) ACB.
Transportation of 150mtr. 1000mm width PVC belting from surface after loading it on trolley and transport by haulages to 74L/4D (R-VII); then approx. 500mtr. manually transport to proposed the 72L tandem belt installation site (R-VII).
Laying, lapping, jointing & tensioning of this 150mtr. 1000mm width PVC belting in proposed 72L tandem belt from 72L/17D to 72L/19D in R-VII seam.
Transportation of 850mtr belt sequence cable from surface to 72L belt starter, then laying-placing-binding them with belt structure from 72L/74BL to 72L/18D in R-VII seam.
Transportation of pull cords with its cable, communication devices with its cable, signalling system (8-SWG GI wire, bobbin insulators & 3/8" X 3" MS Bolt-nut) from surface to proposed 72L tandem belt installation site (R-VII) for 69mtr. belt and laying-placing them from 72L/17D to 72L/19D in R-VII seam.
Testing, trial run, alignment & commissioning of this belt conveyor from 72L/17D to 721/19D in R-VII seam.
Nine times extension of the proposed 1000mm wide 72L tandem belt conveyor from 72L/19D to 72L/28D for a length of 310.5mtr. in R-VII seam of 3&4 Incline Unit, JPC.
Nine times dismantling of tail end unit complete for nine times belt extension from 72L/19D (R-VII) to 72L/27D (R-VII).
Nine times transportation and installation of tail end unit complete for nine times belt extension from 72L/20D (R-VII) to 72L/28D (R-VII).
Transportation of 1000mm belt structures (i.e. foot stools, channels, brackets, top and bottom rollers, etc.) for a length of 310.5mtr. from surface to belt extension site by haulages and installation them from 72L/19D to 72L/28D in R-VII seam during nine times belt extension. (Each time belt extension is for a length of 34.5mtr.)
Transportation of 630mtr. 1000mm belting from surface through haulages to 74L/4D (R-VII); then approx. 600mtr manually transport to belt extension site and laying, lapping, jointing & tensioning of this 630mtr. 1000mm belting from 72L/19D to 72L/28D in R-VII seam during nine times belt extension and trial run.
Transportation of pull cords with its cable, communication devices with its cable, signalling system (8-SWG GI wire, bobbin insulators & 3/8" X 3" MS Bolt-nut) for 310.5mtr. belt from surface to belt extension site and laying & fitting them from 72L/19D to 72L/28D in R-VII seam during nine times belt extension.
Civil foundation works for installation of 1 x 110kW, 550V, 1000 mm wide belt conveyer drive head and platform for ACB, Starter at 72L/18D, panel-8 in R-VII seam of 3&4 incline, JPC.
Recess cutting in stone
Cleaning of debris/muck
Sand filling
Brickwork with fly ash bricks in foundation & plinth in cement mortar 1:6
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level:1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
12 mm cement plaster of mix 1:6
Loading material into tub and unloading at site (TUB NOS = )
Roof heightening by drilling blasting in stone, cleaning, roof bolting including cost of drill rod, drill bit for installation of proposed 72L tandem belt conveyor in R-VII seam of 3&4 incline under JPC.
Roof heightening by drilling, blasting in stone including dressing, Cleaning & cost of drill rod and drill bit.
Roof bolting including carrying of materials from surface to u/g side, drilling, grouting & cost of drill rod and drill bit.
SUPPLY OF MATERIALS
Supply of Oxygen Cylinder
Supply of DA Cylinder
supply of MS Nut+Bolt of 5/8" X 2"
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .