Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.4 LAdmitted-Fee/PreQual/Technical/Finance SAHEBGANJ | JHARKHAND | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹18.0 L+₹60,371.17 (3.48%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹18.8 L+₹1.4 L (8.22%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹19.8 L+₹2.5 L (14.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹21.1 L+₹3.8 L (21.7%)Admitted-Fee/PreQual/Technical/Finance KOTALPOKHAR SAHEBGANJ | SAHEBGANJ | JHARKHAND | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.5 L
EMD Value
₹47,000
Closing Date
17 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. R.D.Spl. Division, Sahibganj
E.E. R.D.Spl. Division, Vikas bhawan, Sahibganj
Construction of Two Class Room in Primary School Tetuliya, Village -Tetuliya, Block - Rajmahal, District- Sahibganj.
2026_RDSPL_120829_1
RDSpl/SAHIBGANJ/10/2026-27 Gr.02
Open Tender
Civil Works
Percentage
120 days
Block - Rajmahal, District- Sahibganj.
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹47,000
19 Nov 2026
6 Nov 2026
19 Nov 2026
6 Nov 2026
17 Nov 2026
6 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in hard soil (vide classification of soil item - A+B) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as perbuilding specification and direction of E/I. (B.C.D. S.O.R. Item No. 5.1.1) | 44.09 | M3 | 151.82 | ₹6,693.74 |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) (B.C.D. S.O.R. Item No. 5.1.2) | 44.09 | M3 | 15.51 | ₹683.84 |
| 3 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume)
B.C.D. S.O.R. Item No. 5.1.8 | 88.27 | M3 | 128.88 | ₹11,376.24 |
| 4 | Earth filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and finally dressed with earth obtained from excavation of foundation trenches with a lead of 50m and lift of 1.5m all complete as per building specification and direction of E/l.
(B.C.D. S.O.R. Item No. 5.1.7) | 66.18 | M3 | 55.28 | ₹3,658.43 |
| 5 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l.
(B.C.D. S.O.R. Item No. 5.1.10) | 11.03 | M3 | 589.51 | ₹6,502.3 |
| 6 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I.
(B.C.D. S.O.R. Item No. 5.6.3) | 89.85 | M2 | 330.34 | ₹29,681.05 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
(B.C.D. S.O.R. Item No. 5.3.1.2) | 8.15 | M3 | 4,598.23 | ₹37,475.57 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
(B.C.D. S.O.R. Item No. 5.3.1.1) | 11.71 | M3 | 4,961.73 | ₹58,101.86 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size)
(B.C.D. S.O.R. Item No. 5.3.10) | 4.75 | M3 | 6,082.45 | ₹28,891.64 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
(B.C.D. S.O.R. Item No. 5.3.9.1) | 3.09 | M3 | 5,218 | ₹16,123.62 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.98 MB
BOQ_163477.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .