Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Due to insufficient criteria's. |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Due to insufficient criteria's. |
Tender Value
Refer Docs
EMD Value
₹3.0 L
Closing Date
28 Sept 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o Executive Engineer Capital Division-B, PWD, AP, Itanagar
Construction of Museum -cum-Library Building at Itanagar.
2021_PWDAP_499_1
CDB/DoKA/2021-22/01
Open Tender
Civil Works
Item Rate
180 days
Itanagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3.0 L
Yes
Itanagar
4 Oct 2021
22 Sept 2021
4 Oct 2021
22 Sept 2021
28 Sept 2021
22 Sept 2021
24 Sept 2021
75 days
Amount
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete.
Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete in retaining wall (any thickness) including attached pillasters, buttresses, plinth and string courses, fillets etc from top of foundation up to floor two level excluding cost of centring,shuttering and reinforcement in :a) M20 (1 cement : 1.5 Coarse Sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1: 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smoothand even surface but excluding cost of centering, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm togive a smooth and even surface but excluding cost of centring and shuttering and reinforcement with 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
Reinforced cement concrete work in stair cases (excluding landing) except spiral cases including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface, preparing of the top surface and finishing, nosing upto floor two level but excluding the cost of centring, shuttering and reinforcement with M20 (1cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete in chajjas exceeding 15mm in thickness upto floor two level including centring and shuttering complete but excluding the cost of reinforcement with M20( 1 cement: 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Centring and shuttering including strutting, propping etc and removal of form work fora) Foundation, footings, bases of columns etc. and mass concrete.
Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level.
Column, pillars, posts and struts etc.
d) Lintels, beams, girders, bressumers and cantilevers etc.
c) Suspended floors, roofs, landings shelves and their supports, balconies and Chajjas
f) Stairs (excluding landings) except spiral stair cases.
Reinforcement of RCC work including bending, binding and placing in position complete.b) Cold twisted bars.
Brick work with best available local bricks in foundations and plinth in cement mortar 1:4 (1 cement : 4 fine sand).
Extra for brick work with best available local bricks in superstructure above plinth level up to floor two level.
Half brick masonry (with best available local bricks) in cement mortar 1:4 (1cement : 4 coarse sand) in foundation and plinth.
Extra for half brick masonry in superstructure above plinth level and up to floor two level.
M/s T G Construction
M/S G. A. ENTERPRISE
stage.html
html • 0.03 MB
finance_560.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .