| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹21,961.94 (12.4%)Admitted-Finance H NO 353 E GALI NO 6 TILAK NAGAR DISTRICT ROHTAK 124001 HARYANA | ROHTAK | ROHTAK | HARYANA | 124001 | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Finance 2214 URBAN ESTATE JIND | JIND | HARYANA | 126101 | - | Not Admitted-Finance Price Bid not complied |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
21 Sept 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
ANNUAL MTC. ESTIMATE OF INTERNAL WATER SUPPLY SCHEME FOR SECTOR-1,4,3,5 AND MGA HISAR (2026-27)
2026_HBC_547984_1
2026FAC25C04 80B1 4969 B156 1053E910B277259HSV
Open Tender
Civil Works
Works
60 days
Hisar
Providing, fixing and installation of Flow meter in 200 mm Dia water supply line of Rajdarbar Colony Hisar and construction brick manhole chamber with plaster rendering and sluice valves in Sector 1and4, Hisar and all other works contingent thereto
2 documents required · 2 mandatory
₹250
Yes
₹4,000
Yes
29 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. | 2.03 | cum | 1,863 | ₹3,781.89 |
| 2 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) | 43.74 | Sqm | 147 | ₹6,429.78 |
| 3 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 54 | cum | 83 | ₹4,482 |
| 4 | [6.2.1]Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing: 1. 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 5.29 | cum | 3,982 | ₹21,064.78 |
| 5 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | 32.42 | Sqm | 208 | ₹6,743.36 |
| 6 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 530 | Kg. | 66 | ₹34,980 |
| 7 | [7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 11.96 | cum | 4,404 | ₹52,671.84 |
| 8 | Providing and fixing 200mm dia Water Flow Meter at 8` water supply line from main water Works Sector 3 to M/s Rajdarbar Colony complete in all respect as per satisfaction of Engineer-in-Charge. | 1 | Each | 69,500 | ₹69,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_627661.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .