| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.2 LAdmitted-Fee/PreQual/Technical/Finance GRUDWARA ROAD MANGO JAMSHEDPUR | EAST SINGHBUM | JHARKHAND | 831001 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹11.3 L+₹8,255.87 (0.74%)Admitted-Fee/PreQual/Technical/Finance GRUDWARA ROAD MANGO JAMSHEDPUR | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.3 L
EMD Value
₹22,619
Closing Date
28 Sept 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Municipal Commissioner, JNAC, Sakchi
JNAC, SAKCHI, JAMSHEDPUR, EAST SINGHBHUM
Construction of Drain Bagunhatu Road no 05 Near Sukha Talab Under Jnac Jamshedpur in East Singhbhum District
2026_UDD_118208_1
Jnac/Epro-39/2026-27
Open Tender
Civil Works
Percentage
120 days
Jamshedpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹22,619
30 Sept 2026
5 Sept 2026
29 Sept 2026
5 Sept 2026
28 Sept 2026
5 Sept 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 27.52 | M3 | 955.89 | ₹26,308.96 |
| 2 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) | 165.14 | M3 | 167.33 | ₹27,632.88 |
| 3 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 6.74 | M3 | 589.51 | ₹3,973.3 |
| 4 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 130.03 | M2 | 330.34 | ₹42,954.11 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 18.94 | M3 | 4,598.23 | ₹87,072.08 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 47.43 | M3 | 5,218 | ₹2,47,470.43 |
| 7 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.(a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)} | 2.76 | MT | 82,096.54 | ₹2,26,875.43 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 611.64 | M2 | 194.05 | ₹1,18,688.74 |
| 9 | Supply 300 mm dia NP2 Hume Pipe with collors | 99.39 | M | 561 | ₹55,757.79 |
| 10 | Labour for Laying and fixing 300 mm dia NP2 Hume Pipe with collors | 99.39 | M | 361.9 | ₹35,969.24 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 2.06 MB
39document.pdf
Tender Documents • 2.05 MB
BOQ_159863.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .