Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹96,689.20 Per unit ₹5,687.60 · 17 Set | |
| 2 | ₹1.9 L Per unit ₹5,687.60 · 33 Set |
Tender Value
Refer Docs
Closing Date
29 Jul 2026, 11:30 amClosed
Single Packet
Normal Tender
No
Itemwise/Consigneewise
Lowest to Highest
CONSIGNEE
Not Applicable
Expenditure
General
05
1 condition
NONE
17 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
by Consignee
QUANTITY SPLITING : As per clause No. 2.17.2 of bid Document Version 14.0 with all corrigendums & amendments if any issued before opening of tender shall be applicable.
Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments in respect of the items stipulated in the contract (and not the raw materials thereof), within the original delivery period stipulated in the contract, or last unconditionally extended delivery period shall be to Railways' account. Only such variation shall be admissible which takes place after the submission of bid. No claim on account of statutory variation in respect of existing tax/duty will be accepted unless the tenderer has clearly indicated in his offer the rate of tax/duty considered in his quoted rate. No claim on account of statutory variation shall be admissible on account of misclassification by the supplier/ contractor.
Bid document version 14.0 or latest with corrigendums and amendments if any, issued before tender closing shall be applicable.
GREEN TRANSPORT POLICY:- I) SUPPLIERS SHALL NOT ENGAGE TRUCKS/ VEHICLES OF MORE THAN 15 YEARS OLD FOR TRANSPORT OF GOODS TO RCF. II) ALL VEHICLES ENTERING INTO FACTORY PREMISES SHOULD CARRY VALID PUC (POLLUTION UNDER CONTROL) CERTIFICATE AND VALID INSURANCE POLICY. III) VEHICLES MAY UNDERGO SURPRISE CHECK BY RCF FOR GENERAL CONDITIONS SUCH AS TYRES PRESSURE, TANKS etc. AND REPORT SUBMITTED TO CONCERNED CMMs. IV) SUPPLIERS SHOULD ENSURE SPEED CONTROLLERS ARE INSTALLED IN ALL NEW HEAVY VEHICLES. V) RTA NORMS SHOULD BE STRICTLY MAINTAINED FOR DRIVER'S COMPETENCE
LIQUIDATED DAMAGES : RAILWAY WILL RECOVER FROM THE CONTRACTOR AS AGREED LIQUIDATED DAMAGES AND NOT BY WAY OF PENALTY, A SUM EQUIVALENT TO 0.5% (HALF PERCENT) OF THE PRICE OF ANY STORES (INCLUDING ELEMENTS OF TAXES, DUTIES, FREIGHT ETC.) WHICH THE CONTRACTOR HAS FAILED TO DELIVER WITHIN THE PERIOD FIXED FOR DELIVERY IN THE CONTRACT OR AS EXTENDED FOR EACH WEEK OR PART OF A WEEK DURING WHICH THE DELIVERY OF SUCH STORES MAY BE IN ARREARS WHERE DELIVERY THEREOF IS ACCEPTED AFTER EXPIRY OF THE AFORESAID PERIOD, SUBJECT TO A MAXIMUM OF 10% (TEN PERCENT) OF VALUE OF DELAYED SUPPLIES AND THE SAME WILL NOT BE WAIVED OFF EXCEPT IN CASES WHERE DELAY IS ON ACCOUNT OF RCF. NOTE:-(THIS IS APPLICABLE FOR TENDERS OPENED AFTER 31-MAR-2019)
1 condition
Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.
1 location across Punjab · 50 Set total
SET OF EARTHING ACCESSORIES
05261529
05261529
Limited - Indigenous
Goods
Punjab
₹0
Exempted
1 Aug 2026
23 Jul 2026
1 item · 50 Set total
SET OF EARTHING ACCESSORIES FOR 3-PHASE MEMU/DMC HYBRID MEDHA COACHES., a s per Drawing: MP21FB3PH VERSION 2, Packing Instruction: PACKING AS PER STANDARD PACKING [ W arranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SHELL DEPOT, RCF | Punjab | 50.00 Set |
| Total | 50 Set | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5790367.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .