Tender Value
₹1.2 Cr
EMD Value
₹1.1 L
Closing Date
28 Aug 2026, 2:30 pm3d left
CE/TP-I/Guindy/Chennai-32
230 KV GIS SS Guindy Chennai-32
Construction of CRB Electrification plumbing work for establishment of Kovalam 110 KV SS
2026_EB_691354_2
CETP-I-05/2026-27
Open Tender
Civil Works
Works
270 days
KOVALAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
Yes
19 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintegrated rock not requirng blasting | 313 | M3 | - | - |
| 2 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintegrated rock not requirng blasting | 19 | M3 | - | - |
| 3 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting | 19 | M3 | - | - |
| 4 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Removal of hard rock by wedging and chiselling and trimming to proper shape | 19 | M3 | - | - |
| 5 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 82 | M3 | - | - |
| 6 | Transporting the surplus excavated earth, debris etc away from the site to a lead of 2km including cost of all lead, lift, conveyance , loading, unloading etc. complete | 100 | M3 | - | - |
| 7 | Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 250 | M3 | - | - |
| 8 | Providing anti termite treatment in 4 stages I) immediate after earth work excavation and before laying foundation concrete II) after refilling for sides of foundation III) Before laying of flooring concrete IV) outside of basement upto 1.0m alround the building using BIFLEX-C termite 250ml for 10lit of water etc. complete. | 172 | M2 | - | - |
| 9 | Plain cement concrete 1:3:6, using 20 mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 66 | M3 | - | - |
| 10 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 19 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_836405.xls
BOQ • 0.42 MB
spec5.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].