| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance | ₹3.1 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PRATAP SINGH VERMA GOVT CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | Excavation in earthwork in drain and channels in all heights and depths in all all kind of soil including saturated soil comprising of pick work, jumper wrk and blasting work both in soft and hard rock with chiesling and wedging out of rock (where blasting is prohibited) and their intermediate classificatin of soil including dewatering whereever required, settling out to required lines, levels as shown on the drawing and directed by the Engineer-in-charge at site according to the HPPWD specification of 1990 ( one thousand nine hundred ninety) volume-I and soding out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (to be arranged by the contractor) including payment of prescribed dumping charges of M.C. if levilled any to the satisfaction of the Engineer-in-charge through all modes of transporation including head load animal load or mechnanical means alongwith its leveling, fine dressing and with all kinks of labour, mechineries, tools, equipment and safety measures and incidental necessary to complete the work by mechanical means and labour (if required). All useful material such as stones, shingles aggregate and states shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transporation and used/removed as per the satisfaction of the Engineer in charge. any loss to the public and private properity during the course of execution and disposal of servicable and unservicable materials shall be the absolute responsiblity of the contractor and shall have to be duly compensated by him in alll respects incuding all incidential charges and as directed by the Engineer in charge. | 795.95 | Per cubic meter | 260 ₹2,06,947 Lowest |
| 2.00 | Excavation in foundation and trenches in earthwork in all heights and depth in all kinds of soil by mechanical means including saturated soil comprising of pick, jumper work and blasting work both in soft and hard rock with chiesling and wedging out of rock (where blasting is prohibited) and their intermediate classificatin of soil including dewatering whereever required, settling out to required lines, levels as shown on the drawing and directed by the Engineer-in-charge at site according to the HPPWD specification of 1990 ( one thousand nine hundred ninety) volume-I and sorting out useful and unuseful material and transportation of the unuseful material and stacking the same in all leads and lifts and transportation of the unusefull materials on approved dumping sites through all modes of transportation indluding head load, animal load or mechnanical means alongwith its leveling, fine dressing and with all kinks of labour, mechineries, tools, equipment and safety measures and incidental necessary to complete the work by mechanical means and labour (if required) all useful materials such as stones shingles, aggregates, and slates shall be sorted out and stacked in the plot up to maximum extent, in all (leads and lifts through all modes of transportation as per the direction of the Engineer-in charge. Any loss to the public and private properity during the course of execution and disposal of servicable and unservicable materials shall be the absolute responsiblity of the contractor and shall have to be duly compensated by him in alll respects incuding all incidential charges and as directed by the Engineer in charge. | 26.33 | Per cubic meter | 380 ₹10,005 Lowest |
| 3.00 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete as per HP.PWD specifications and hauling of materials through all modes of transportation within all leads and lifts and as per the entire satisfaction and directions of Engineer -in-Charge. | 25.04 | Per cubic meter | 1,400 ₹35,056 Lowest |
| 4.00 | Poviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level 1:3:6 (One cement : Three coarse sand : Six graded stone aggregate Twenty mm nominal size.)as per HP.PWD specifications including the cost of form work and hauling of materials through all modes of transportation within all leads and lifts and as per the entire satisfaction and directions of Engineer -in-Charge. | 40.55 | Per cubic meter | 6,200 ₹2,51,410 Lowest |
| 5.00 | Poviding and laying in position cement concrete in retaining wall of any thickness including attached pillars column abutments posts struts buttresses string or lacking courses parpets coping window sill inclding the cost of centering shuttering and finishing of specifed grade in 1:5:10 (one cement : five coarse sand : ten graded stone aggregate twenty mm nominal size) as per HP.PWD specifications including the cost of form work and hauling of materials through all modes of transportation within all leads and lifts and as per the entire satisfaction and directions of Engineer -in-Charge. | 109.52 | Per cubic meter | 5,000 ₹5,47,600 Lowest |
| 6.00 | Poviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level 1:4:8 (One cement : Four coarse sand : Eight graded stone aggregate Twenty mm nominal size.)as per HP.PWD specifications including the cost of form work and hauling of materials through all modes of transportation within all leads and lifts and as per the entire satisfaction and directions of Engineer -in-Charge. | 34.32 | Per cubic meter | 5,600 ₹1,92,192 Lowest |
| 7.00 | Providing and applying a coat of residual petroleum bitument of grade of VG-10 of approved quality using 1.7kg. Per square metre on damp proof courase after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.as per HP.PWD specifications including hauling of materials through all modes of transportation within all leads and lifts and as per the entire satisfaction and directions of Engineer -in-Charge. | 23.54 | Per square meter | 98 ₹2,307 Lowest |
| 8.00 | Providing and Laying damp-proof course 40mm thick with cement concrete 1:2:4 (One cement : Two sand: Four graded stone aggregate Twelve point Five mm nominal size)as per HP.PWD specifications including the cost of form work and hauling of materials through all modes of transportation within all leads and lifts and as per the entire satisfaction and directions of Engineer -in-Charge. | 23.54 | Per square meter | 450 ₹10,593 Lowest |
| 9.01 | Centering and shuttering including strutting, propping etc. and removal of form for items mentioned below as per HP.PWD specifications including hauling of materials through all modes of transportation within all leads and lifts and as per the entire satisfaction and directions of Engineer -in-Charge.
Foundation, footings, bases of columns etc. for mass concrete. | 496.63 | Per square meter | 230 ₹1,14,225 Lowest |
| 9.02 | Suspended floors, roofs, landings, balconies and access platform. | 1,025.1 | Per square meter | 400 ₹4,10,040 Lowest |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
26 Sept 2022, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH- Main Building portion civil work, WS and SI, septic tank and soak pit, rain water harvesting tank and Site development
2022_PWD_65201_1
PW/RMP/2022-2776-78 dated 19.05.2022
Open Tender
Civil Works - Buildings
Item Rate
EE B and R Division HPPWD Rampur
Please refer Tender documents.
12 documents required · 12 mandatory
₹5,000
Yes
EE Rampur
₹5.4 L
Yes
30 Nov 2022
20 Sept 2022
26 Sept 2022
20 Sept 2022
26 Sept 2022
20 Sept 2022
20 Sept 2022 - 26 Sept 2022
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_98148.xls
BOQ • 0.37 MB
sbd.pdf
Tender Documents • 4.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .