Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | ₹1.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.0 L+₹5,918.50 (3.05%)Rejected-Finance PATEL ROAD PRADHAN NAGAR SILIGURI WEST BENGAL PIN 734001 | SILIGURI | DARJEELING | WEST BENGAL | 734001 | ₹2.0 L+₹5,918.50 (3.05%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.0 L+₹5,918.50 (3.05%)Rejected-Finance | ₹2.0 L+₹5,918.50 (3.05%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.9 L
EMD Value
₹3,881
Closing Date
28 Jan 2026, 1:00 pmClosed
PANCHAYAT PRADHAN
ST MARYS III GRAM PANCHAYAT OFFICE
CONSTRUCTION OF DRAIN FROM RAMESH PAKHRIN HOUSE TOWARDS MAIN ROAD AT HOSPITAL LINE UNDER ST MARYS III GRAM PANCHAYAT ACTIVITY CODE 111054748
2026_GTA_991351_2
41/STM lll/15th FC/NIT/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
LONGVIEW
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,881
Yes
29 Jun 2026
21 Jan 2026
30 Jan 2026
22 Jan 2026
28 Jan 2026
22 Jan 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
labour cess 1%
Add 18% GST
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2423885.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .