Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LQualified Make: UNI-T
Model: UT207B 507 A SKY LARK BUILDING NEHRU PLACE 507 SKYLARK BUILDING NEHRU PLACE SOUTH DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Make: UNI-T
Model: UT207B | L1 | Qualified | |
| 2 | L2₹1.5 L+₹38,200 (34.1%)Qualified Make: Metravi
Model: PRO 421 1ST FLOOR BADNERA ROAD OPP PETROL PUMP SATURNA AMRAVATI MAHARASHTRA 444606 | AMRAVATI | MAHARASHTRA | 444606 | Make: Metravi
Model: PRO 421 | L2 | Qualified | |
| 3 | L3₹1.6 L+₹52,020 (46.5%)Qualified Make: UNI-T
Model: UT207B 67 AURAHWA AURAHWA BALRAMPUR UTTAR BALRAMPUR BALRAMPUR UTTAR PRADESH 271206 | BALRAMPUR | UTTAR PRADESH | 271206 | Make: UNI-T
Model: UT207B | L3 | Qualified | |
| 4 | L4₹6.5 L+₹5.4 L (480.5%)Qualified Make: Metravi
Model: PRO-474 238B AJC BOSE ROAD KOLKATA KOLKATA WEST BENGAL 700020 | KOLKATA | WEST BENGAL | 700020 | Make: Metravi
Model: PRO-474 | L4 | Qualified | |
| 5 | Disqualified Make: Sonel
Model: CMP-1010 SE 10 SE 10 MILITARY LANE OPP HEERAPURA POWER HOUSE AJMER ROAD JAIPUR 302021 HEERAPURA JAIPUR RAJASTHAN 302021 | JAIPUR | RAJASTHAN | 302021 | Make: Sonel
Model: CMP-1010 | - | Disqualified |
Tender Value
Refer Docs
EMD Value
₹12,978
Closing Date
12 Aug 2025, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
true rms clamp meter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6472094 Dated : 22-07-2025 Bid Document 1/13 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 12978 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption
must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category
only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : SITE DIRECTOR NPCIL RR SITE NUCLEAR POWER CORPORATION OF INDIA LIMITED
RAWATBHATA RAJASTHAN SITE
PO:ANUSHAKTI
Via-KOTA
RAJASTHAN-323303 (Site Director) Splitting 2/13
8111082
GEM/2025/B/6472094
Two Packet Bid
true rms clamp meter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC)
90 days
323303, Contracts & Material Management, NPCIL, Rawatbhata Rajasthan Site, Anushakti Via-Kota (Rajasthan) Phone No. 01475-242002, 242048 Which is about 60 Kms. away from Kota.
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
₹12,978
12 Aug 2025
22 Jul 2025
12 Aug 2025
true rms clamp meter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6472094 Dated : 22-07-2025 Bid Document 1/13 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 12978 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption
must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category
only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : SITE DIRECTOR NPCIL RR SITE NUCLEAR POWER CORPORATION OF INDIA LIMITED
RAWATBHATA RAJASTHAN SITE
RAJASTHAN-323303 (Site Director) Splitting 2/13
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8111082.pdf
GEM_BID
1752907157.pdf
OTHER
icollecthome.htm.pdf
OTHER
Abovefive_17fbd8f8-ad3e-4c62-9dbd1752907674201_rrsuser465.doc
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .