| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.9 CrAccepted-AOC ROHTAK | ROHTAK | HARYANA | 124001 | 1 | Accepted-AOC Accepted | |
| 2 | 2₹19.4 Cr+₹45.4 L (2.40%)Rejected-AOC 1791 GT SECTOR 7 PART 2 GURGAON | GURGAON | 2 | Rejected-AOC Rejected | |
| 3 | Rejected-Technical 366 27 SUBHASH NAGAR ROHTAK ROAD JIND | JIND | JIND | HARYANA | 126102 | - | Rejected-Technical Non responsive |
Tender Value
₹16.5 Cr
EMD Value
₹32.9 L
Closing Date
13 Jun 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Provincial Division, PWD B and R Charkhi Dadri,
Construction of SDO (Civil) Complex with 550 Sft (G 2), 950 Sft (G 3), 1900 Sft (G 1), SDM residence and servant quarter at Badhra in Charkhi Dadri Distt. under Provl. Divn. PWD B and R Br., Charkhi Dadri
2022_HRY_222876_1
Construction of SDO (Civil) Complex at Badhra
Open Tender
Civil Works - Buildings
Item Wise
630 days
Charkhi Dadri
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹32.9 L
Yes
8 Aug 2022
21 May 2022
15 Jun 2022
21 May 2022
13 Jun 2022
21 May 2022
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. (HSR 4.12.1) All kinds of soil | 7,048.69 | cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, cum plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m..(HSR 4.32) | 4,229.21 | cum | - | - |
| 3 | Deduct - Excavating, supplying and filling of local earth (including royalty) cum by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.(HSR 4.33) | 649.27 | cum | 1 | ₹649.27 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: (HSR 6.1.2) 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded cum stone aggregate 20 mm nominal size | 5.98 | cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: (HSR 6.1.6) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 746.92 | cum | - | - |
| 6 | Providing and laying in position cement concrete 1:5:10 (1 cement : 5 coarse sand zone-Ill graded 10 stone aggregate 40 mm nominal size) of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level. (HSR 6.1.7) | 322.49 | cum | - | - |
| 7 | Providing and laying damp-proof course with cement concrete 1 :2:4 (1 cement : 2 coarse sand (zone-Ill): 4 graded stone aggregate 12.5mm nominal size) (HSR 6.8.1) 50 mm thick | 253.08 | sqm | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level : (HSR 6.14.1) 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 cum graded stone aggregate 20 mm nominal size) | 7.2 | cum | - | - |
| 9 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix). (HSR 6.25.1) All works up to plinth level | 2,615.21 | cum | - | - |
| 10 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix). (HSR 6.25.2). All works above plinth level up to floor IV level First storey | 921.04 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_291887.xls
BOQ Document • 0.61 MB
98544820.pdf
Tender Document • 0.06 MB
Badhr.pdf
Tender Document • 3.35 MB
98544822.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .