Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹5.9 Cr
EMD Value
₹11.9 L
Closing Date
30 Apr 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl Chief Engineer
PWD Zone-II Jaipur
Strangthening and Widening Work from Approch Road Khedi Kharkhari upto Haryana Border
2025_CEPWD_457652_2
NIT NO. 01/2025-26 PWD ZONE-II, JAIPUR
Open Tender
Civil Works
Percentage
240 days
Alwar / Khairthal / Tijara
Please Refer Tender Documents
5 documents required · 5 mandatory
₹5,000
E.E. PWD Dn- Kishangarh Bas and MD, RISl, Jaipur
₹11.9 L
Yes
ACE PWD Zone-II, Jaipur
9 May 2025
9 Apr 2025
1 May 2025
9 Apr 2025
30 Apr 2025
9 Apr 2025
21 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART - A : ROAD WORK | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201 By mechanical Means . In area of light jungle | 1.75 | Hect | 16,669 | ₹29,170.75 |
| 3 | Earth work in excavation, including stacking/disposal of surplus material with all lifts and lead up to 50 meters, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305] In ordinary Soil Mechanically by power shovel, including mechanical loading and carriage up to 50m. | 2,689.9 | Cum | 87 | ₹2,34,021.3 |
| 4 | Extra for laying earth as per specification for compaction in 200 mm thick loose layers and dressing [MoRTH Specification Clause 305.3.5].BY MECHANICAL MEANS, using Motor Grader, from earth in stock piles with all lead and lift but excluding rolling and watering. | 6,157.4 | Cum | 11 | ₹67,731.4 |
| 5 | Extra for watering the earth to bring the earth up to required O.M.C excluding rolling | 6,157.4 | Cum | 13 | ₹80,046.2 |
| 6 | Extra for rolling to specification with the use of Vibratory roller when earth is at suitable moisture content with desired field density not less than 100% of maximum dry density (Modified Heavy Proctor test).excluding watering. | 6,157.4 | Cum | 18 | ₹1,10,833.2 |
| 7 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 Tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with ALL lead As per MoRTH specification Clause No. 305. | 4,805.13 | Cum | 125 | ₹6,00,641.25 |
| 8 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately as per MORTH specification clause 202.By Mechanical Means :Bituminous courses | 60 | Cum | 140 | ₹8,400 |
| 9 | Providing laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in wet mix plant, carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, mach-nery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] includiong with all lead
a) For Grading I Materia | 1,310 | Cum | 1,048 | ₹13,72,880 |
| 10 | Providing laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in wet mix plant, carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, mach-nery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] including with all lead For Grading III Material | 720 | Cum | 948 | ₹6,82,560 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.59 MB
Tendernotice_2.pdf
PDF • 1.91 MB
Tendernotice_3.pdf
PDF • 0.34 MB
Tendernotice_4.pdf
PDF • 0.25 MB
Newdlp.pdf
Tender Documents • 1.46 MB
POTENTIALBID.pdf
Tender Documents • 0.62 MB
BOQ_821441.xls
BOQ • 0.71 MB
Sppecialcond.pdf
Tender Documents • 0.13 MB
Tenderdocument.pdf
Tender Documents • 1.46 MB
Tenderdocument_2.pdf
Tender Documents • 0.13 MB
Tenderdocument_3.pdf
Tender Documents • 0.62 MB
BOQ.xls
BOQ • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .