| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | +0.00% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 L+₹2,877 (1.00%)Admitted-Finance | +1.00% | ₹2.9 L+₹2,877 (1.00%) | L2 | Admitted-Finance |
| 3 | L3₹2.9 L+₹5,753 (2.00%)Admitted-Finance | +2.00% | ₹2.9 L+₹5,753 (2.00%) | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
18 Jul 2026, 4:00 pmClosed
Executive Engineer(Civil)
Office Of The Executive Engineer ( C ), Borough - XV, Kolkata Municipal Corporation, E/3, Circular Garden Reach Road Kolkata-700024
REPAIRING AND MAINTENANCE OF CEMENT CONCRETE AND I.P. PASSAGE WITH ALLIED WORKS AT PANCHPARA LANE MASHIN PARA, BARA BAGAN, MITHA TALAB LANE N/H/NO- T-246, Y-19 ETC IN WARD NO-138, BR-XV UNDER UTTARAN AREA.
2026_KMC_1031240_1
KMC/XV/138/001/2026- 2027/R/UTTARAN
Open Tender
CIVIL WORKS
Percentage
120 days
Borough XV office
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,800
22 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) | 52.24 | M3 | 89.9 | ₹4,696.29 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand | 18.42 | M3 | 990.4 | ₹18,238.2 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 245.54 | SQM | 358 | ₹87,901.53 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 0.68 | M3 | 5,575 | ₹3,763.13 |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 5.63 | SQM | 724 | ₹4,072.5 |
| 6 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 14.78 | SQM | 186 | ₹2,748.15 |
| 7 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | 14.78 | SQM | 34 | ₹502.35 |
| 8 | (23)Supplying, fitting and fixing in positing reinforced cement polymer concrete manhole /gully pit cover with matching frame as per I.S. 12592 (m.D.)x) 5 mT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover : 470 mm. X 420 mm. X 80 mm. Frame : 590 mm. X 550 mm. X 170 mm. Opening : 380 mm. X 305 mm. Weight : 100 Kg. (approx.) | 10 | EA | 2,001 | ₹20,010 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.38..Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect. (only the area in contact with concrete to be measured) | 3.83 | SQM | 94 | ₹359.55 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL. | 0.05 | MT | 58,249 | ₹2,747.02 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_2532208.xls
BOQ • 0.31 MB
CIVIL.pdf
Additional Documents • 4.88 MB
TENDER.pdf
Tender Documents • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .