Tender Value
₹7.8 L
EMD Value
₹19,500
Closing Date
4 Jun 2026, 4:00 pmClosed
Executive Officer
SRRD Vemulawada
Laying of CC Flooring infront of Gas Godown at Goshala Thippapur
704392
C1/556/2026
OPEN
Civil Works
RAJANNA SIRICILLA
6 documents required · 6 mandatory
₹276
₹19,500
28 May 2026
28 May 2026
28 May 2026
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m, including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc., including cost and conveyance of all material and labour charges, contractors profit & over heads etc., but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO.308)
Supply and filling of Stone Dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost of sand, all operational, incidental, labour charges, complete for finished item of work, including cost and conveyance of all materials and labour charges, and contractors profit & over heads, but excluding seigniorage charges & taxes like GST etc. , complete. (APSS NO. 309 & 310)
Hire charges towards Road Roller diesel 10t capacity including fuel charges and crew charges etc., complete.
Supply and laying of Ply Sheet 125 micron Below Pcc Bed incuding cost and covneyance of all materials and labour charges etc., complete.(Sl.No.274 P.No.38)
Plain Cement concrete (M 20) Nominal Mix using 20mm graded metal using concrete mixer - using 20mm HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., including all operational, incidental and labour charges such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & taxes like GST etc. (APSS 402)
Supply and high performance expansion joint filler board confirming to IS:1838-18mm thick
Supply, fabricating and fixing hand railing / Iron grill in position using MS tubes & pipes, flats as per IS 1161 including cost & conveyance of materials to site, fabrication, labour charges for fixing etc., in position complete, excluding taxes like GST etc.
Painting with Synthetic Enamel paint to New Iron works 2 coats over primary coat total 2 coats with using 1st grade paint incluidng cost and conveyance of all materials and labour charges etc., complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
CC Flooring infront of Gas Godown BID.doc
TENDER_DOCUMENT • 1.42 MB
CC Flooring infront of Gas Godown BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB