Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹31.5 L
EMD Value
₹63,000
Closing Date
4 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
RN
2 conditions · 2 needing a document upload
Please refer chapter on Instructions & special condition of contracts to Tenderers and its sub-clauses. Documents testifying tenderer's technical eligibility, previous experience should be produced along with the tender. The Tenderer should submit/upload along with his tender credentials.
The tenderer shall possess a valid Electrical Contractor's License issued by the competent authority for execution of electrical works of the required voltage level.
9 conditions · 5 needing a document upload
Self attested copies of GST ID and PAN No needs to be submitted along with the offer.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractor is to abide by provisions of Payment of Wages act & Minimum Wages act in terms of clause 54 and 55 of KR GCC. Contractor shall register his firm/ company etc. and upload requisite details of labour and their payment in the portal www.shramikkalyan.indiarailways.gov.in'.
Contractor shall upload all information monthly on 'www.shramikkalyan.indiarailways.gov.in' website and shall submit a certificate along with the bills, that "I have uploaded the correct details of contract labours engaged in connection with this contract and payment made to them during the wage period in above portal.
Standard general conditions of contract, July 2022, shall be applicable for this tender/ work
Provision of Power Supply arrangement for proposed Lifts at Kankavali and Kudal Station under Ratnagiri Region of KRCL.
KR-RN-EL-T-30-2026~KRCL
KR-RN-EL-T-30-2026
Open
Works - General
3 Months
Ratnagiri, Maharashtra
₹0
₹63,000
14 Oct 2026
14 Oct 2026
21 Oct 2026
208 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | Above/ 1701371.25 Below/P | ||
| — | 1012.00 | — | — | ||
| Supply of RSJ poles 11 mtr long 100 x 116 mm (04 nos) | — | — | — | 77,013.2 | |
| — | 2.00 | — | — | ||
| Erection of above 11 m RSJ poles by digging a pit of 0.8 x 0.8 x 1.8 mtr pit, aligning, refilling with concrete. | — | — | — | 3,580 | |
| — | 1.00 | — | — | ||
| Erection of 2 pole structure with above RSJ poles with platform for mounting transformer, braces, angles, channels etc. complete. | — | — | — | 2,685 | |
| — | 1.00 | — | — | ||
| Erection, testing & commissioning of Transformer on DP Structure. | — | — | — | 4,654 | |
| — | 1.00 | — | — | ||
| Supply, erection and commissioning of 6 Way M.S Distribution box comprising with 125 Amp/415 volt TPN MCCB with fuse cutouts of suitable rating. | — | — | — | 13,425 | |
| — | 1.00 | — | — | ||
| Supply and erection of Energy meter box/encloser | — | — | — | 1,655.75 | |
| — | 1.00 | — | — | ||
| Supply of GOS 200 A Single break | — | — | — | 31,325 | |
| — | 1.00 | — | — | ||
| Fixing of above GOS on DP structure | — | — | — | 447.5 | |
| — | 1.00 | — | — | ||
| Supply of D.O.L.O. set | — | — | — | 26,850 | |
| — | 1.00 | — | — | ||
| Fixing of D.O.L.O. set on DP structure | — | — | — | 268.5 | |
| — | 1.00 | — | — | ||
| Supply a set of (i.e. 3 Nos of ) 9 kV, 10 kA, metal oxide, gapless lightning arrestor | — | — | — | 15,215 | |
| — | 1.00 | — | — | ||
| Fixing of above set of LA on DP structure. | — | — | — | 116.35 | |
| — | 12.00 | — | — | ||
| Supply & fixing of 11 KV Disc insulator 70 KN | — | — | — | 9,289.8 | |
| — | 16.00 | — | — | ||
| Supply & fixing of 11 KV pin insulator with pin | — | — | — | 6,157.6 | |
| — | 6.00 | — | — | ||
| Supply of GI stay set complete (HT) | — | — | — | 9,666 | |
| — | 60.00 | — | — | ||
| Supply of GI stay wire 7/8 SWG | — | — | — | 5,586 | |
| — | 6.00 | — | — | ||
| Fixing of above stay sets with making use of GI 7/8 SWG wires with turn buckle & anchoring arrangements as per drawing including excavation & concreting. | — | — | — | 1,611 | |
| — | 60.00 | — | — | ||
| Supply of G.I.wire 8 SWG for earthing/gaurding | — | — | — | 4,833 | |
| — | 6.00 | — | — | ||
| Provision of Earthing to ISS 3043 with 40 mm dia GI pipe, 2.5 mtr. Long complete with all connecting material. (for Transformer Centre (DP) earthing and Line pole earthing). | — | — | — | 11,814 | |
| — | 4.00 | — | — | ||
| Fixing of V shape/ Horizontal cross arms including single top supports, braces & insulators on ples and on DP | — | — | — | 537 | |
| — | 4.00 | — | — | ||
| Supply a set of single tension hardware for combination of disc insulator | — | — | — | 12,709 | |
| — | 4.00 | — | — | ||
| Erection of hardware for combination of Disc. Insulators up to 33 KV single tension hardware | — | — | — | 2,112 | |
| — | 4.00 | — | — | ||
| Fixing of single top pin support with insulators, braces. | — | — | — | 232.6 | |
| — | 300.00 | — | — | ||
| Supply of AAAC Conductor 55 sqmm | — | — | — | 10,740 | |
| — | 0.30 | — | — | ||
| Laying and Stringing of above conductor including binding on insulators, dead ending and fixing of insulators, hardware and adjusting sag etc. complete | — | — | — | 402.75 | |
| — | 3.00 | — | — | ||
| Concreting of poles, stays etc.with 1 : 3 : 6 concrete mix. | — | — | — | 13,425 | |
| — | 600.00 | — | — | ||
| Supply of GI items (Including V cross arm, channels, Clamps etc) in assorted Length. | — | — | — | 80,550 | |
| — | 50.00 | — | — | ||
| Supply of MS black bolts & Nuts | — | — | — | 6,935 | |
| — | 6.00 | — | — | ||
| Supply of Anti climbing device | — | — | — | 1,734 | |
| — | 6.00 | — | — | ||
| Fixing of Anti climbing devices | — | — | — | 462 | |
| — | 1.00 | — | — | ||
| Arranging EIG's Inspection and all formal approval for erection, commissioning and successfully charging of power lines/installations. | — | — | — | 21,032.5 | |
| — | 1.00 | — | — | ||
| Liasoning with state electricity board for initial survey and Arranging shut downs / power blocks for erection and successfully commissioning of complete installations. | — | — | — | 21,032.5 | |
| — | 10.00 | — | — | ||
| Supply of Alluminium Paint | — | — | — | 2,774.5 | |
| — | 10.00 | — | — | ||
| Supply of Red Oxide Paint | — | — | — | 1,620 | |
| — | 60.00 | — | — | ||
| Painting of above RSJ poles with one coat of red oxide primer and two coats of aluminium paint of approved make. | — | — | — | 3,222 | |
| — | 6.00 | — | — | ||
| Supply of Caution Boards | — | — | — | 1,154.4 | |
| — | 10.00 | — | — | ||
| Supply of all relavant material Provision of earthing as per ISS 3043 with 40 mm dia Gl pipe, 2.5 mtr long complete with all connecting material and labour as per sketch enclosed. Scope also includes construction of earth chamber supply and providing of suitable RCC cover with lifting hook, measuring of earth value and inscribing the same on the chamber. (For distribution box of Transformer centre) | — | — | — | 63,599 | |
| — | 2.00 | — | — | ||
| Supply, erection, connection and testing of ELCB with MCB Combination Solid State 3 phase 400V Grade 4 pole AC Supply tripping current 30mA, 6 to 32 Amp capacity. (01 no for MDB at Station LT room, 01 each for DB of Lift 01 & Lift 02) | — | — | — | 12,374.3 | |
| — | 1.00 | — | — | ||
| Supply of 3 phase, 11/0.433 kV, 50 Hz., 100 kVA, oil immersed and naturally cooled outdoor type, aluminium wound distribution transformer, delta/star connected with additional neutral brought out on load side, with standard accessories complete with test certificate along with all the associated items. | — | — | — | 1,86,607.5 | |
| — | 450.00 | — | — | ||
| Excavation of Cable Trench - Excavation of cable trench in all kinds of soil to the required width and depth for underground laying of electrical cables through HDPE pipes, including dressing of sides, ramming of bottom, getting out excavated soil, refilling the trench in layers, watering, ramming and proper consolidation, complete as per direction of Engineer-in-Charge. This also includes disposal of surplus soil within a lead of 50 metres, | — | — | — | 1,10,745 | |
| — | 1000.00 | — | — | ||
| "Supply & Laying of HDPE Pipe - Cables up to 95 sq.mm - Supplying and laying HDPE pipe of approved make, 6 kg/cm² pressure rating, and suitable diameter for underground laying of electrical cables up to and including 95 sq.mm size, including laying the pipe in the prepared trench, pulling/placing of cable through the HDPE pipe, alignment and levelling, complete as per direction of Engineer-in-Charge. This item shall be applicable for any number of cables laid in the same trench, and measurement shall be made on actual running length of HDPE pipe laid." | — | — | — | 89,500 | |
| — | 80.00 | — | — | ||
| "Supply & Laying of HDPE Pipe - Cables above 95 sq.mm Supplying and laying HDPE pipe of approved make, 6 kg/cm² pressure rating, and suitable diameter for underground laying of electrical cables above 95 sq.mm size, including laying the pipe in the prepared trench, pulling/placing of cable through the HDPE pipe using suitable tools and equipment, alignment and levelling, complete as per direction of Engineer-in-Charge.This item shall be applicable for any number of cables laid in the same trench, and measurement shall be made on actual running length of HDPE pipe laid." | — | — | — | 10,740 | |
| — | 80.00 | — | — | ||
| Supply of XLPE insulated Al conductor 1.1KV garde 3.5 core 150 sqmm multistranded armoured cable as per ISS7098 Part I latest, with cable gland and lugs for termination at both end. (From transformer to MDB) | — | — | — | 62,828 | |
| — | 560.00 | — | — | ||
| Supply of XLPE insulated Al conductor 1.1KV garde 3.5 core 50 sqmm multistranded armoured cable as per ISS7098 Part I latest, with cable gland and lugs for termination at both end. (for Power supply of Lift 01 and lift 02 on platform of 1 & 3) | — | — | — | 1,80,124 | |
| — | 440.00 | — | — | ||
| Supply of XLPE insulated Al conductor 1.1KV garde 3.5 core 120 sqmm multistranded armoured cable as per ISS7098 Part I latest, with cable gland and lugs for termination at both end. (From transformer to MDB) | — | — | — | 2,67,784 | |
| — | 50.00 | — | — | ||
| Supply & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 300 mm width & 100 mm height comprising all required standard accessories. | — | — | — | 45,867.5 | |
| — | 4.00 | — | — | ||
| Supply & erection of Syntex FRP junction box for cable termination including lugs & glands etc complete. | — | — | — | 3,784 | |
| — | 4.00 | — | — | ||
| Supply and installation of maintenance free earthing the detailed scope of work includes excavation of pit in soil upto depth of 2.75mtr,suitable for exothermic copper bonded earthing rod of size 17.2mm*3 meters long with 250 microns of copper coating with copper strip of 40mm*5mm*200mm clamp attached, with advanced chemical compound of 25kg two bags and back filling of soil complete with provision of RCC chamber and cover.(the work is to be carry out at locations i.e public platforms of stations including transportation of man and materials etc.) (for lifts) | — | — | — | 70,705 | |
| — | 200.00 | — | — | ||
| — | 1.00 | — | — | ||
| — | 2.00 | — | — | ||
| — | — | — | 25,060 | ||
| — | 2.00 | — | — | ||
| — | — | — | 73,500 | ||
| — | — | — | Above/ 1450359.98 Below/P | ||
| — | 759.00 | — | — | ||
| Supply of RSJ poles 11 mtr long 100 x 116 mm (03 nos) | — | — | — | 57,759.9 | |
| — | 1.00 | — | — | ||
| Erection of above 11 m RSJ poles by digging a pit of 0.8 x 0.8 x 1.8 mtr pit, aligning, refilling with concrete. | — | — | — | 1,790 | |
| — | 1.00 | — | — | ||
| Erection of 2 pole structure with above RSJ poles with platform for mounting transformer, braces, angles, channels etc. compleate | — | — | — | 2,685 | |
| — | 1.00 | — | — | ||
| Erection, testing & commissioning of Transformer on DP Structure. | — | — | — | 4,654 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Appendix1TenderersInformation.pdf Appendix 1
ATTACHMENT
Appendix2Compliance.pdf
ATTACHMENT
Appendix3rescinded.pdf
ATTACHMENT
Appendix4.pdf
ATTACHMENT
Appendix5FAMILIARISATION.pdf
ATTACHMENT
Summary.pdf
ATTACHMENT
EarthingSpecification.pdf
ATTACHMENT
TenderdocumentT30.pdf
ATTACHMENT
Appendix1TenderersInformation.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .